This Solicitation opportunity from California was posted on February 20, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Geotechnical Investigation Addendum 1 - Wing Avenue Drainage Improvements: Dated May 19, 2010, this addendum from Southern California Soil & Testing Inc. provides specific foundation design parameters for planned floodwalls for the Wing Avenue Drainage Improvements project, including passive pressure, allowable bearing pressure, and uplift hydrostatic pressure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Investigation - Wing Avenue Drainage Improvements: Geotechnical investigation report dated August 6, 2009, prepared by Southern California Soil & Testing, Inc. for the County of San Diego Department of Public Works. The document provides subsurface conditions, field exploration data, and engineering recommendations for the widening and deepening of the Wing Avenue drainage channel, including excavation conditions, seismic design parameters, and retaining wall recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 5921 Complete Cross Sections: Technical drawing document containing complete cross sections associated with RFB 5921. The file consists of engineering schematics and specifications used for procurement bidding.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5921 - Wing Avenue Flood Control Improvements: Request for Bids (RFB 5921) for the Wing Avenue Flood Control Improvements project in San Diego County, California. The document includes a bid abstract with totals from multiple bidders (opening date March 27, 2013) and a detailed bid proposal from El Cajon Grading & Engineering Co., Inc., featuring a comprehensive bid schedule with unit prices for various construction items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5921 Wing Avenue Flood Control Improvements - Addendum 1: Addendum No. 1 dated March 5, 2013, for RFB 5921 (Oracle Project No. 1010541). This document modifies the original solicitation by replacing several pages, updating the 'Labor Code Compliance' section regarding prevailing wages and CMU reporting, removing the Irrigation System and Planting warranty section, and inserting new pages regarding the Notice of Enrollment.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5921 Wing Avenue Flood Control Improvements - Addendum 3: Addendum No. 3 dated March 18, 2013, for RFB 5921 (Oracle Project No. 1010541). It modifies the solicitation by adding requirements for SDG&E gas line protection, clarifying shoring costs for the Magnolia Street access road, replacing several plan sheets (7, 17, 22, 24), and updating technical specifications for PVC storm drains, steel casing, and irrigation/planting materials.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5921 Wing Avenue Flood Control Improvements - Addendum No. 2: Addendum No. 2 dated March 14, 2013, for RFB 5921 (Oracle Project No. 1010541). This document modifies the original solicitation by replacing several pages and inserting critical new requirements regarding Gillespie Field Airport coordination, including security protocols, construction activities, and penalties for runway incursions. It also updates provisions for BMP shared maintenance and traffic control compensation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wing Ave 401 Permit Conditions Memo: An internal memorandum dated March 19, 2013, from the County of San Diego Department of Public Works detailing the 401 default certification conditions for the Wing Avenue Flood Control Project. It outlines water quality protection measures, construction BMPs, and specific wetland/water impact calculations and mitigation requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wing Avenue Channel Improvement Lab Report: Dated April 22, 2009, this intradepartmental memorandum from the County of San Diego DPW Materials Lab provides structural section and culvert design recommendations for the Wing Avenue Channel Improvement project. It includes soil sample test results (gradation, moisture, R-value, pH, resistivity, chloride, and sulfate content) and specifies pavement sections and concrete requirements for a 60-year service life.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Wing Avenue Flood Control Improvements (RFB 5921): A complete bid package issued by the County of San Diego Department of Public Works for the Wing Avenue Flood Control Improvements (Oracle Project No. 1010541). The solicitation, identified as RFB 5921, includes a bid opening date of March 27, 2013, and requires a 3% Disabled Veterans Business Enterprise (DVBE) participation goal. The document contains bidding information, a bid schedule, special technical and conditional provisions, and requirements for federal funding compliance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Wing Avenue Flood Control Improvements (RFB 5921) Addendum No. 4: Issued March 20, 2013, Addendum No. 4 modifies the contract documents for the Wing Avenue Flood Control Improvements project (RFB 5921). Key changes include the addition of conceptual treatment system and 401 permit information, updated shoring requirements for SDG&E relations, clarification that K-Rail removal is included in the Clearing and Grubbing lump sum, and a comprehensive replacement of Section 20 regarding Groundwater Dewatering, including specific monitoring, reporting, and permitting requirements under the California Regional Water Quality Control Board.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Wing Avenue Flood Control Improvements (RFB 5921) - Addendum No. 5: Issued March 22, 2013, Addendum No. 5 modifies the solicitation for the Wing Avenue Flood Control Improvements project (Oracle Project No. 1010541). It includes updates to groundwater dewatering responsibilities, replaces multiple pages of the original documents, provides technical corrections to pipe sizes and classes, and includes a detailed bid schedule with itemized quantities for fencing, water lines, and excavation.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Wing Avenue Flood Control Improvements - RFB 5921 Bid Schedule: This document is the 'Documents to be Executed by Bidder' section for RFB No. 5921, Project No. 1010541, regarding Wing Avenue Flood Control Improvements and water line relocations in El Cajon, San Diego County. It includes the formal proposal agreement and a detailed bid schedule with unit price items for construction activities, including erosion control, concrete work, and structural components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wing Avenue Flood Control Improvements & Water Line Relocations Plans: Construction plans and technical specifications for the Wing Avenue Flood Control Improvements and Water Line Relocations project for the County of San Diego Department of Public Works. The document includes channel grading tables, construction notes, planting requirements, and references to San Diego Regional, Caltrans, and Water Agency standard drawings.
PDF
PDF, Low priorityspecifications
LowAI Summary for Wing Avenue Drainage Improvements Soil Boring Report: A geotechnical report dated December 30, 2009, prepared by Southern California Soil & Testing, Inc. for the County of San Diego Department of Public Works. The document details the destruction and sealing of soil borings for the Wing Avenue Drainage Improvements project, including a specific boring log (B-4) showing subsurface conditions such as silty sand and weathered granite rock.
PDF
PDF, Low priorityhazmat-report
LowAI Summary for Wing Avenue Drainage Project - Screening Level Pre-Characterization Sampling Letter Report: A September 2012 environmental report by Ninyo & Moore for the County of San Diego regarding the Wing Avenue Drainage Project in El Cajon, CA. The document details the screening level pre-characterization sampling of approximately 23,100 cubic yards of export material. Analysis of 10 soil and sediment samples for TPH, VOCs, metals, SVOCs, OCPs, PCBs, and herbicides concluded that the material would not be categorized as hazardous waste.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Wing Avenue Flood Control Improvements - Planholders List: A list of companies and contact persons who have registered as planholders for the Wing Avenue Flood Control Improvements project, dated between February and March 2013. It includes general and subcontracting firms with their contact information.
PDF
PDF, Low prioritytechnical-report
LowAI Summary for Wing Avenue Flood Control Improvements - Well Installation and Aquifer Testing Report: A technical report prepared by Clevenger Geoconsulting for Rick Engineering dated February 29, 2012. The document details the assessment of groundwater conditions for the Wing Avenue Flood Control Improvements project in El Cajon, California, including well installation, groundwater sampling, and step-drawdown aquifer testing to support the project's dewatering plan.
PDF
PDF, Low priorityother
LowAI Summary for Wing Avenue Flood Control Improvements - Well Installation and Aquifer Testing Report: A technical report dated February 29, 2012, prepared by Clevenger Geoconsulting for Rick Engineering. The document details groundwater assessments, including well installation, sampling, and step-drawdown aquifer testing for the Wing Avenue Flood Control Improvements project in El Cajon, California, to support the development of a dewatering plan.