Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB 6776 Asset Management Service Center Secure Enclave

Closed
RFB 6776, Project No. 24215State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves enhancing security and access control at the Asset Management Service Center through the installation of approximately 8,700 linear feet of heavy-duty galvanized chain-link fencing surrounding a 97-acre area. Key features include the construction of multiple controlled access gates: two motorized rolling gates at the Holly Road and Ayers/Civitan entrances, and a manual double swing gate at the Ayers/Hygeia entrance. Additionally, a substantial monument identification sign with city insignia and LED lighting will be erected at the Holly Street entrance, complemented by landscaping with Colorado Bull Rock and dry scaping to enhance visual appeal and security. The scope also includes the installation of a heavy-duty, high-security chain-link fence system with concrete pier footings, designed to provide a robust barrier against vandalism, theft, and unauthorized access, thereby safeguarding city assets and improving safety for staff. The project is valued at approximately $1.33 million and is solicited by the City of Corpus Christi Finance Department, with a response deadline set for October 15, 2025.

General Info

Agency

Texas → City of Corpus Christi Finance

Place of Performance

TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Corpus Christi Finance
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → City of Corpus Christi Finance
Office AddressN/A

Full Description

Show more
   The project scope of work includes: The scope will consist of an 8’ tall heavy‐duty chain‐link fence to enhance securityto the Asset Management Service Center by providing an additional layer ofprotection against vandalism, theft, and unauthorized access to the city’svaluable assets and improve safety for all department staff within the facility.Additionally, the project involves constructing a controlled access rolling entrygate at the Holly side entrance, a controlled access rolling entry gate at theAyers/Civitan entrance, and a manual access double swing chain‐link gate onthe Ayers/ Hygeia entrance, and a monument Identification sign with the cityinsignia and LED lighting at the Holly Street entrance, for privatization andprotection of city owned buildings, equipment, vehicles and facilities.A. Security fencing will encompass approximately 97 Acres project limits.B. The addition of a new monumental identification structure with LED lighting atthe Holly Road entrance.1) Single 3'‐0" x 14'‐6" x 9'‐7" high structure with LED light fixtures at each face,similar to the design of the Lipan entry to City Hall;2) Landscaping on both sides of this entry to include:a) Dry scaping with Colorado Bull Rock 3’‐0” beyond the monumentsignage foundation in all directions.b) Approximately 1 cubic yard 4”‐6” Colorado Bull rock on white fabric.C. The addition of one new motorized access controlled 30’‐0” wide x 8’‐0” tallrolling entry gate at the Holly Road entrance.D. The addition of one new motorized access controlled 30’‐0” wide x 8’‐0” tallrolling entry gate at the Ayers/Civitan entrance. E. The addition of one new manual controlled 30’‐0” wide x 8’‐0” tall double swingentry gates at the Ayers/Hygeia entrance.F. The addition of approximately 8,700 LF new heavy‐duty chain‐link fencing, HF40framework galvanized (silver), 3” OD posts at 8’‐0” on center with 1‐5/8” OD top /bottom rail & 6 gauge galvanized chain‐link fabric system with concrete pierfootings.Estimate: $1,326,121.00

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS