This Award Notice opportunity from California was posted on February 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for RFB 12964 Addendum 1 - Asphalt Concrete Overlay FY 2024-25: Addendum No. 1 dated February 11, 2026, for RFB 12964 regarding Asphalt Concrete Overlay for Fiscal Year 2024-25. This document modifies the original contract documents by adding five attachments, including project plans for curb ramps and striping.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 2 - Asphalt Concrete Overlay FY 2024-25: Addendum No. 2 dated March 3, 2026, for RFB 12964 regarding Asphalt Concrete Overlay for FY 2024-25. It extends the bid opening date to April 16, 2026, provides Q&A regarding HMA Type A payment and mapping files, adds specifications for Subsurface Utility Identification and RRFB systems, and replaces specific pages in Parts 2 and 6 of the contract documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 3 - Asphalt Concrete Overlay: Addendum No. 3 dated March 4, 2026, for RFB 12964 (Asphalt Concrete Overlay for FY 2024-25). This document provides a formal question and answer regarding the submission of original bid bonds via the Buynet site, clarifying that physical bonds are not required at the time of bid opening if uploaded with wet signatures, though mailing is encouraged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 4 - Asphalt Concrete Overlay FY 2024-25: Addendum No. 4 dated March 10, 2026, for RFB 12964 regarding Asphalt Concrete Overlay for Fiscal Year 2024-25. This document provides clarifications on bid item units of measure and confirms that Item 58 is a Lump Sum bid item. It replaces pages 2-3 to 2-3b of Part 2 of the Contract Documents with revised versions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 5 - Asphalt Concrete Overlay FY 2024-25: Addendum No. 5 dated March 27, 2026, for RFB 12964 regarding Asphalt Concrete Overlay for Fiscal Year 2024-25. This document modifies the original contract documents by replacing page 2-3b, updating project plans for curb ramps (volumes 2 and 3), and adding specific items (Asphalt Concrete Surfacing, Surface Distress Repair, and Pavement Edge Restoration) to the Compensation Adjustment for Price Index Fluctuations section.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 6 - Asphalt Concrete Overlay FY 2024-25: Addendum No. 6 dated April 6, 2026, for RFB 12964 (Asphalt Concrete Overlay for Fiscal Year 2024-25). This document provides formal responses to contractor questions regarding bid item locations in plans, payment for engineer's notes, bonding and insurance requirements, and requests for specification changes to fiber dosage rates per ASTM D 8395.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Addendum 7 - Asphalt Concrete Overlay: Addendum No. 7 dated April 10, 2026, for RFB 12964 regarding Asphalt Concrete Overlay for Fiscal Year 2024-25. This document provides clarifications via a Q&A section concerning the disposal of paving fabric (petromat), the definition of the acronym 'ISL' as 'island', and guidance on Caltrans Encroachment Permit fees.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 - Asphalt Concrete Overlay FY 2024-25: This document contains a bid abstract for RFB 12964 (Asphalt Concrete Overlay for FY 2024-25) dated 04/16/2026, identifying R.J. Noble as the apparent low bidder. It also includes Addendum No. 1 and Addendum No. 2, which provide updated bid opening dates, technical clarifications regarding HMA Type A payment, the provision of .kmz reference files, and new specifications for subsurface utility identification and electrical work components.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 12964: Asphalt Concrete Overlay FY 2024-25: Request for Bids (RFB 12964) for Asphalt Concrete Overlay for Fiscal Year 2024-25 (Oracle Project No. 1025745) issued by the County of San Diego. The document specifies a bid opening date of March 19, 2026, and requires contractors to be pre-qualified. Key requirements include a 3% Small-Local Business Subcontractor Participation requirement, compliance with the Working Families Ordinance, and CARB vehicle emissions regulations. It includes a pre-bid meeting scheduled for February 24, 2026, and outlines the necessary bid documents, including the bid schedule and utilization plans.
PDF
PDF, High priority: read this firstindustry-day
HighAI Summary for RFB 12964 Asphalt Concrete Overlay FY 24-25 Pre-Bid Conference: Presentation materials from a pre-bid conference held on February 24, 2026, for the San Diego County Department of Public Works RFB 12964 (Asphalt Concrete Overlay FY 24-25). The document outlines critical dates, including a question deadline of March 9, 2026, and a bid opening date of March 19, 2026. It details pre-qualification requirements, Small-Local Business participation goals (3%), CARB emissions compliance, and specific technical differences between Caltrans and County specifications regarding asphalt concrete density testing and subgrade preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 Attachment A - Caltrans Encroachment Permits: Attachment A for RFB 12964 contains a collection of Caltrans Encroachment Permits for various locations in San Diego County (including Euclid Av, Old Cuyamaca Rd, and others). It includes specific permit details for Route 805, lane closure requirements, general and special provisions, and approval dates ranging from September to October 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Construction of 24/25 Curb Ramps (Vol 3): Technical project plans and specifications for the construction of 55 curb ramps in the County of San Diego, California (Volume 3). The document includes an index of sheets, vicinity maps, utility alerts, and references to Caltrans and San Diego County design standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Curb Ramps Vol 2 (Addendum 5): Construction plans and index of sheets for the installation of 41 curb ramps in the vicinity of Lakeside, Fallbrook, and Hidden Meadows for the County of San Diego, California Department of Public Works. This document serves as Volume 2 and is associated with Addendum 5 of RFB 12964.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Curb Ramps Vol 2 Project Plans: Construction plans and technical specifications for the installation of 41 curb ramps in the vicinity of Lakeside, Fallbrook, and Hidden Meadows for the County of San Diego Department of Public Works. The document includes an index of sheets, utility alerts, project standard specifications (referencing Caltrans 2015/2024 and San Diego Regional Standard Drawings), survey control data, and detailed construction notes for pavement, sidewalk, and curb ramp installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Curb Ramps Vol 3 (Addendum 5): Construction plans and technical specifications for 55 curb ramps in the County of San Diego, California (Volume 3). The document includes an index of sheets, vicinity maps, utility alerts, and references to Caltrans Standard Specifications (2015), Caltrans Standard Plans (2025), San Diego Regional Standard Drawings (2022), and San Diego County Design Standards (2025).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 FY 2024-25 AC Overlay Project - Miscellaneous AC Work Schedule: This document is an addendum (Addendum 2) to RFB 12964 for the FY 2024-25 AC Overlay Project. It contains a detailed Miscellaneous AC Work Schedule specifying road locations, removal and replacement areas, and material requirements (HMA, fog seal, and asphaltic emulsion) for various road segments.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Part 2 Bid Schedule (Addendum 2): This document is an addendum (Addendum 2) to RFB 12964, specifically providing the continued Bid Schedule for Part 2/County. It contains a detailed list of line items for road and concrete work, including asphaltic emulsion, shoulder backing, minor concrete, and traffic striping, with estimated quantities and units of measure for bidder pricing.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 12964 Part 2 Bid Schedule (Addendum 4): This document is a Bid Schedule for RFB 12964 Part 2, updated via Addendum 4. It contains a detailed list of line items for a construction or public works project, including items for water pollution control, job site management, asphaltic emulsion, and roadside signage. The document provides item codes, estimated quantities, and units of measure for bidder pricing.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 12964 Part 2 Bid Schedule (Addendum 5): This document is an addendum (Addendum 5) to RFB 12964, specifically providing a continuation of the Bid Schedule for Part 2/County. It contains a pricing table for items 46 through 49, including manhole frame adjustments, asphalt concrete stamping, and various traffic and utility-related installation and removal tasks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Project Plans Curb Ramps Vol 1: Construction plans and technical specifications for the installation of 38 curb ramps in the Valle De Oro, Sweetwater, and Spring Valley areas for the County of San Diego Department of Public Works. The document includes an index of sheets, project standard specifications referencing Caltrans 2015 and 2024 standards, San Diego Area Regional Standard Drawings (Nov 2022), and specific construction notes regarding PCC sidewalk and curb ramp installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 12964 - Project Plans for Signing and Striping (Main Avenue): Technical project plans and specifications for the improvement of Main Avenue for the County of San Diego, Department of Public Works. The document includes a sheet index, references to standard drawings (including Caltrans and the Greenbook), and general notes regarding striping requirements.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for BPM012964 - Asphalt Concrete Overlay FY 2024-25 Planholders List: A planholders list for the County of San Diego Department of Purchasing and Contracting regarding RFB BPM012964 (Oracle Project No. 1025745) for Asphalt Concrete Overlay for Fiscal Year 2024-25. The document lists general contractors and subcontractors who have requested project documents, including contact names, emails, and addresses, with entries dated from February to April 2026.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for BPM012964 - Planholders List: Asphalt Concrete Overlay FY 2024-25: A planholders list for the County of San Diego Department of Purchasing and Contracting regarding RFB BPM012964 (Oracle Project No. 1025745) for Asphalt Concrete Overlay for Fiscal Year 2024-25. The document lists registered subcontractors, including HMS Construction, Inc. and Sael Construction Corporation, as of February 9, 2026.
PDF
PDF, Low prioritypre-bid-attendance
LowAI Summary for RFB 12964 Asphalt Concrete Overlay FY 24-25 Pre-Bid Attendance: Attendance sheet from the Pre-Bid Conference held on February 24, 2026, for the County of San Diego Department of Public Works RFB 12964 regarding Asphalt Concrete Overlay for Fiscal Year 2024-25. The document lists representatives from the County and various bidding firms including E-4 Construction, Calmex, Griffith Company, Hazard Construction, RJ Noble Company, Vulcan Materials, and Romero.
PDF
PDF, Low priorityaward
LowAI Summary for RFB 12964 - Notice of Award: Asphalt Concrete Overlay FY 2024-25: Notice of Award dated September 10, 2026, from the County of San Diego Department of Purchasing and Contracting. Contract 575831 for RFB 12964 (Asphalt Concrete Overlay for Fiscal Year 2024-25) has been awarded to R.J. Noble Company.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.