Lancaster County is soliciting proposals for the construction of a 1.41-mile section of the Enola Low Grade Trail in Bart Township, Pennsylvania. The scope of work includes the re-decking of a three-span built-up riveted steel girder bridge over Meetinghouse Creek, the development of a shared driveway, and the installation of signing, pavement markings, and erosion and sedimentation control (E&SPC) and post-construction stormwater management (PCSM) systems. This project is distinct from the Lamparter Trailhead contract, though bidders are encouraged to propose for both. The anticipated notice-to-proceed date is December 8, 2025, with a required completion date of June 26, 2026. Technical requirements mandate strict adherence to PENNDOT Publication 408 and OSHA 29 CFR 1926 Subpart P for excavation safety. Geotechnical specifications require soil compaction to 95 to 98 percent of maximum dry density per ASTM D698 or D1557, with imported fill meeting PADEP guidelines and specific ASTM soil classifications. The project involves managing a total area of 13.10 acres, including the mitigation of impacts to wetlands and streams. Proposals must be submitted by November 3, 2025, for solicitation number 204799.
General Info
Contract Value
$2,286,563.08Place of Performance
Lancaster County, PA, USASet-Aside
Award Issued Date
Documents
9AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 18 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 5 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (202)
See All 202 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
The project is for the construction of a 1.41-mile section of the Enola Low Grade Trail (a multi-use recreation trail) located in Lancaster County, Pennsylvania. Work includes the re-decking of a three-span built-up riveted steel girder bridge, development of a shared driveway, installation of E&SPC and PCSM controls, and placement of signing and pavement markings.
A separate contract, “Enola Low Grade Trail Lamparter Trailhead”, will be issued for items related to the trailhead construction and function. The trailhead scope of work is limited to the parking lot/driveway tied to Trailhead Survey & Construction Centerline, SCM002 and its outfall, landscaping, grading, E&SPC controls, sign and pavement markings, and other items necessary to provide a compete project. Bidders are encouraged to submit proposals on both contracts.
Notice-to-Proceed is anticipated to be provided on or about December 8, 2025 with all work being completed by June 26, 2026.
More opportunities from Pennsylvania → Lancaster County
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS