Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 8, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFI PLATOON POWER GENERATION (PPG)

Closed
W909MY22R0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335312
New
DIBBS
RECTIFIER, METALLIC
Solicitation # SPE7L4-27-T-0458
Solicitation SPE7L4-27-T-0458 is a Request for Quotations issued by the DLA Weapons Support LSO Combat Vehicles and Armament for the procurement of three metallic rectifiers, identified by NSN 6130-01-180-8388. The requirement is classified under NAICS code 335312. Key delivery milestones include a need ship date of March 3, 2026, and an original required delivery date of May 2, 2026, with a delivery window of 84 days after receipt of order. Shipping is designated as FOB Origin, with the final destination being DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, alongside DLA packaging requirements RP001. Technical and quality standards are governed by the DLA Master List of Technical and Quality Requirements. Notably, the contract prohibits the intentional addition of mercury or mercury-containing compounds unless specifically exempted for functional use. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. Compliance with various FAR and DFARS clauses is required, including the Buy American Act, cybersecurity safeguarding under DFARS 252.204-7012, and the prohibition of covered defense telecommunications equipment. Quotations are due by October 30, 2026.
DLA WEAPONS SUPPORT LSO COMBAT VEHICLES AND ARMAMENT

POSTED

1 day ago

DEADLINE

in 10 days

General Info

NAICS

335312 - Motor and Generator Manufacturing

Place of Performance

VA

Set-Aside

NONE

Documents

3

Amendment+01+Questions+and+Answers+RFI+PLATOON+POWER+GENERATION.pdf

PDF

Attachment+0001+PPG+Capability+Matrix_Updated+20220907.xlsx

XLSX

Copy+of+Attachment+0001+PPG+Capability+Matrix_.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc
Contacts2 people available
OfficeALEXANDRIA, VA, 22331-0700, USA
Office AddressALEXANDRIA, VA, 22331-0700, USA
Contacts

Full Description

Show more
The purpose of Amendment 01 is to provide answers to the questions received. This is a pre-solicitation notice only to gauge the interest of potential businesses and capabilities. The U.S. Army Contracting Command-Aberdeen Proving Ground (ACC-APG) Belvoir Division is conducting market research on behalf of Project Manager (PM) Expeditionary Energy and Sustainment Systems (E2S2), in accordance with Federal Acquisition Regulation (FAR) Part 10. The purpose of this market research is to identify potential sources that have the skills, experience, knowledge, and capabilities required to manufacture and deliver Platoon Power Generation (PPG). The intent is for dismounted Soldiers to use the PPG to power current and future bulk battery chargers. The specific threshold and desired requirements are listed in the attached PPG Capability Matrix (Attachment 0001, PPG Capability Matrix). The Government is interested in industry's capabilities and obtaining information regarding Technology Readiness Levels (TRLs) and Manufacturing Readiness Levels (MRLs) related to the technology for Platoon Power Generation (PPG) and the criteria listed in the attached PPG Capability Matrix (Attachment 0001, PPG Capability Matrix). Sources are required to list technical and manufacturing capabilities, as well as any barriers to establish a viable program for PPG. Solutions geared more towards meeting the objective capabilities will be preferred over solutions only meeting the minimum requirements. In a response of no more than 20 pages (not including any comments or questions), please provide the Government with responses to the following questions to encourage competition and exchanges of information to the Government: 1) Provide a brief summary of the company, which includes the following at a minimum: a) Company Name: b) Company CAGE Code: c) Company Unique Entity ID: d) If your Company holds a GSA Schedule contract (541 or other), please provide the Schedule number: e) Company Address: f) Company Phone #: g) Company Representative and Business Title with Email Address: h) Will your company propose on this effort? Yes or No? i) Provide a statement as to whether or not your company is considered a small or large business. Please also indicate any Socioeconomic Classification -- (Small Business (SB), (8)(a), Woman-Owned (WOSB), Economically-Disadvantaged Women-Owned (EDWOSB), Veteran-Owned and Operated(VOSB), Service-Disabled Veteran-Owned, (SDVOSB), or Historically Underutilized Small Business-Zone (HUBZone) that applies. **The small business size standard is 1,250 employees for the North American Industry Classification System (NAICS) Code 335312. j) If a Small Business, please indicate if your company would be capable and intend for at least 50 percent of the cost of performance incurred for personnel to be expended for employees of your company (See FAR 52.219-14). If no, please explain. k) Does your business intend to bid as a prime or sub-contractor? l) The Government understands that teaming is an intricate part of contracting. Please briefly describe how you would approach selecting team members for this requirement if you are not performing this action 100% in house? 2) Describe in detail how you would provide the proposed solution for a PPG, which meets the requirements described in this RFI and attached capability matrix. Describe your solution (or solutions), to include pictures and/or drawings, and any requirements it does/does not meet for all capabilities listed in the attached capability matrix. Please include the following: 3) Schedule Questions a) Are you interested in completing an Engineering and Manufacturing Development (EMD) process - at your firm's expense - necessary to successfully create, test, demonstrate, and document an alternative feasible PPG design that complies with the performance parameters? b) How much time do you anticipate needing from contract award to complete First Article Test model fabrication? c) How much time do you anticipate to stand up a new production assembly, test facilities and quality control systems for the fabrication of First Article test models? d) How much time do you anticipate is necessary to begin production after First Article Test approval? e) Does your firm have the internal capability to conduct any testing as defined in Department Of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests - MIL-STD-810H? f) How much time does your company anticipate establishing a Supply Chain in support of a PPG set build rate of up to 500 units per year? g) Does your firm have an internal production line that is capable of producing 500 units per year and the ability to add a second assembly line to meet surge capacity requirements? 4) Technical Questions: a) Does your company have any existing solutions that meet all the threshold requirements? b) Does your company have existing solutions that meet similar requirements to the PPG? c) What is the technology readiness level (TRL) for the technology? Provide information related to this determination. d) Provide a description of the technology to include what requirements it does/does not meet. e) Has the technology been tested by any DoD organizations? If so, please provide point DoD point of contact information. f) Has the technology been tested or demonstrated in a tactical environment? Please describe the results. g) Describe any MIL-STD-810 or Electromagnetic Interference Characteristics Requirements for Equipment MIL-STD-461 testing conducted on the product with the test results. h) Does your company have the ability to provide a Technical Data Package (TDP), Operator Maintenance and Repair List Manuals, Maintenance Allocation Chart, Provisioning Parts List, Repair Parts and Special Tools List, and Training Package? i) If the proposed solution does not operate on Jet Propellant 8 (JP8), what fuel is required for operation? What is the energy density of the fuel? j) Provide the projected life hours and maintenance requirements of the system. 5) Production Questions: a) Is the product currently commercially available? If so, please provide brochure, website, etc. b) What is the manufacturing readiness level (MRL) for the technology? c) What is a rough order of magnitude (ROM) of the cost of your product? Identify production quantity break points that achieve economies of scale. d) What, if any, efforts are required to put the product into production, along with estimated milestones and timelines. e) Are there any proprietary interfaces or royalties associated with the product? f) What is the technical design and manufacturing experience of your company or team to supply a product(s) of this type? g) If the proposed solution does not operate on a commercially available fuel, what is the projected cost of the fuel? Identify quantity break points that achieve economies of scale. Include any assumptions. 6) If you currently offer products that provide the capabilities described in this RFI, what warranties do you offer, if any, and what are they based upon (time, performance, etc.)? a) If the technology is in production, what has been the reliability of the product(s)? 7) What components of your products are made outside the United States, and what percentage of the total product does that constitute? This is NOT a request for proposal and does not constitute any obligation by the Government to award a contract based on the findings from this RFI. In accordance with Federal Acquisition Regulation (FAR) Part 10.001, the results of this Market Survey will be used to develop the Government's acquisition approach and to determine if sources are capable of satisfying the agency's PPG requirements. The Government will not reimburse interested sources for responses to this RFI, or any follow-on RFIs, for any costs incurred in association with this announcement or for subsequent exchange of information. Proprietary information submitted in the response to this Sources Sought shall be marked accordingly and will be protected when clearly identified as proprietary. Responses to this RFI are voluntary and will not affect any Contractor's ability to submit a proposal IF, or when, an RFP is released. Submit responses to this RFI no later than 15 September 2022. All requests for further information must be via email; telephonic requests for additional information will not be honored. The subject of the email message shall be as follows: Platoon Power Generator (PPG) RFI - Your Company's name. E-mail shall be limited to 10MB. All communication shall be via email with the following points of contact: Keane Sablon, Contract Specialist keane.s.sablon.civ@army.mil Rosetta Wisdom-Russell, Contracting Officer rosetta.wisdom-russell.civ@army.mil

More opportunities from Department Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc

Same awarding agency

NAICS: 335999
New
Federal
Power Distribution and Illumination Systems, Electrical (PDISE)
Solicitation # W909MY27RA001
The Department of the Army, through the Army Contracting Command-Aberdeen Proving Ground, is conducting a Sources Sought and Request for Information to identify qualified manufacturers for the Power Distribution and Illumination Systems, Electrical (PDISE) family of systems. This build-to-print effort involves the manufacture, assembly, and delivery of four specific ruggedized, man-portable electrical components: the M200 and M100 A/P Feeder Systems, the M40 A/P Distribution System, and the M46 Utility Assembly. The government is seeking to determine industry capacity, lead times, and the feasibility of small business set-asides under NAICS codes 335999 and 335313. Key technical requirements include strict adherence to Government Technical Data Packages, MIL-DTL-53126 specifications, and the use of MIL-DTL-22992 Class L connectors. Contractors must demonstrate the ability to perform First Article Testing (FAT) within 180 to 360 days after contract award and provide Chemical Agent Resistant Coating (CARC) painting conforming to MIL-DTL-53072. Interested vendors must submit a detailed questionnaire by October 22, 2026, including Rough Order of Magnitude pricing for quantity ranges of 1-50, 51-100, and 101-200 units, as well as evidence of quality certifications such as ISO 9001:2015 or AS9100D.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS