Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 14, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFI - Small Tactical Electric Power 2-Kilowatt (STEP 2kW)

Closed
W909MY-23-STEP2KFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335312
New
DIBBS
RECTIFIER, METALLIC
Solicitation # SPE7L4-27-T-0458
Solicitation SPE7L4-27-T-0458 is a Request for Quotations issued by the DLA Weapons Support LSO Combat Vehicles and Armament for the procurement of three metallic rectifiers, identified by NSN 6130-01-180-8388. The requirement is classified under NAICS code 335312. Key delivery milestones include a need ship date of March 3, 2026, and an original required delivery date of May 2, 2026, with a delivery window of 84 days after receipt of order. Shipping is designated as FOB Origin, with the final destination being DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, alongside DLA packaging requirements RP001. Technical and quality standards are governed by the DLA Master List of Technical and Quality Requirements. Notably, the contract prohibits the intentional addition of mercury or mercury-containing compounds unless specifically exempted for functional use. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. Compliance with various FAR and DFARS clauses is required, including the Buy American Act, cybersecurity safeguarding under DFARS 252.204-7012, and the prohibition of covered defense telecommunications equipment. Quotations are due by October 30, 2026.
DLA WEAPONS SUPPORT LSO COMBAT VEHICLES AND ARMAMENT

POSTED

about 24 hours ago

DEADLINE

in 10 days

General Info

NAICS

335312 - Motor and Generator Manufacturing

Place of Performance

VA, USA

Set-Aside

NONE

Documents

2

Attachment+1+-+STEP+2kW+Requirements.pdf

PDF

Attachment+2+-+2kW+MTG+Specification+Sheet.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Dec 16, 2022 to Jan 3, 2023.

Deadline changed

Response deadline changed from Jan 3, 2023 to Jan 9, 2023.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc
Contacts2 people available
OfficeALEXANDRIA, VA, 22331-0700, USA
Office AddressALEXANDRIA, VA, 22331-0700, USA
Contacts
Kayla Sullivan
Rosetta Wisdom-Russell

Full Description

Show more
General Information Document Type - Request for Information (RFI) Request for Information Number - W909MY-23-STEP2K Posted Date - 15 November 2022 Response Date - 16 December 2022 Classification Code - CUI// Procurement Sensitive NAICS Code - 335312 Motor and Generator Manufacturing Disclaimer: This RFI does NOT constitute a Request for Proposal and is not to be construed as a commitment, implied or otherwise, by the Government that a procurement action will be issued. Response to this notice is not a request to be added to a bidders list or to receive a copy of a solicitation. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of the submission of the requested information. No reimbursement will be made for any costs associated with providing information in response to this announcement and any follow up information requests. Responses to this RFI may be considered in the future determination of an appropriate acquisition strategy for the program. The Government may not respond to any specific questions or comments submitted in response to this RFI or information provided as a result of this request. Responses shall not include classified or proprietary material or information with classified, - Proprietary, - Confidential, or other markings limiting distribution. Any information submitted by respondents as a result of this notice is strictly voluntary. Companies are advised that Project Manager Expeditionary Energy & Sustainment Systems (PM E2S2) is supported by Government support contractors who will review information submitted in response to this RFI for the purpose of providing technical advice to the Government. Companies which submit Submission Forms in response to this RFI will be deemed to have waived any objection to the Government's use of support contractors to review their Submission Forms. The Government support contractors work under a contractual nondisclosure agreement which requires them to safeguard controlled technical information. The contractor may not use, reproduce, modify or release controlled technical information without consent of the owner. THIS IS A REQUEST FOR INFORMATION (RFI) ONLY: THIS IS NOT A SOLICITATION: NO AWARD WILL BE MADE AS A RESULT OF THIS REQUEST FOR INFORMATION. This RFI is for information and planning purposes only; this is not an Invitation for Bid (IFB), a Request for Proposal (RFP), or Request for Quotation (RFQ). No solicitation document exists, and a formal solicitation may or may not be issued by the Government because of the responses to this RFI. The Government will not be liable for payment of any preparation expenses and information and materials received in response to this RFI and is in no way obligated by the information received. Any costs incurred by interested companies in response to this announcement will NOT be reimbursed. The information provided may be used by the Army in developing a future acquisition strategy, Performance Work Statement (PWS), Statement of Objectives (SOW) and/or Performance Based Specification(s). Interested parties are responsible for adequately marking proprietary or competition sensitive information contained in their response. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. If a solicitation is issued, it will be synopsized on Beta SAM.GOV. Introduction Army Contracting Command - Aberdeen Proving Grounds, Belvoir is releasing this Request for Information (RFI) on behalf of the Project Manager (PM) Expeditionary Energy and Sustainment Systems (E2S2). The information provided will be used for market research only and used to assess the technical capability of vendors for the requirement described below. The Government is not obligated to release a future solicitation. Responses shall not include classified or proprietary information. Material with classified, - Proprietary, - Confidential, or other markings limiting distribution will not be reviewed. Interested respondents shall refer to the details of their response to this RFI as, - Request for Written Responses, Cover Page, Business Questions, and Vendor Survey Questions. Scope The Small Tactical Electric Power (STEP) program is a PM E2S2 Program of Record (POR) that underwent a Materiel Development Decision (MDD) in 2014. The STEP program was then delayed in 2016 due to slow technological advances in the power generation arena concerning lightweight power solutions. PM E2S2 and PdM MEPS have continued to support legacy systems (2-Kilowatt (2kW) Military Tactical Generator (MTG) and 3kW Tactical Quiet Generator (TQG)), which were produced and fielded to support service requirements in the mid- to late-1990s to early 2000s. Although these systems still exist in inventory, they are approaching and/or exceeding their Economic Useful Life (EUL) expectancy. STEP 2kW power generation solutions will eventually replace the 2kW MTG with the goal of increasing reliability and efficiency utilizing current technologies and advanced designs. In support of its small tactical power modernization program, PM E2S2 is interested in understanding and obtaining industry's capabilities and information regarding Technology Readiness Levels (TRLs) and Manufacturing Readiness Levels (MRLs) to either build, test, package, and deliver a new Small Tactical Electric Power 2kW (STEP 2kW) generator or upgrade the current 2kW MTG (MEP-531A/MEP-501A) specification (Attachment 2) using the criteria listed in the attached capability matrix (Attachment 1). Of particular interest are the technical and manufacturing capabilities, as well as any barriers to establishing a viable long-term program for the STEP 2kW generator. The STEP 2kW will be used as a general-purpose power generation capability. The specific threshold and desired requirements are listed in the attached Capability Matrix (Attachment 1). REQUEST FOR WRITTEN RESPONSES Interested vendors may submit responses with their .pdf document as an attachment via email to kayla.m.sullivan15.civ@army.mil and cc rosetta.wisdom-russell.civ@army.mil no later than 16 December 2022, 4:00PM Eastern Time Zone, for consideration. Subject line must read RFI/STEP2kW-[Company Name]. Example: RFI/STEP2kW-ABC Inc. Responses shall be limited to 20 pages in length single sided, 12-point font, Times New Roman, one-inch margins. All communications shall be submitted in writing to kayla.m.sullivan15.civ@army.mil and cc rosetta.wisdom-russell.civ@army.mil only. Contractors shall not contact any Government personnel regarding this RFI other than the individual designated above. Contacting any Government personnel other than the individual designated above may result in an organizational conflict of interest (OCI) and may result in a contractor being excluded from a solicitation, competition and consideration for award. Cover Page of RFI response should include the following Business Name Business Size Point of Contact Name Business Address Phone Number Email Address Cage Code Registered NAICS Code The following questions are business questions: Does your organization qualify as a Small Business Administration (SBA) 8(a) Program Historically Underutilized Business Zones (HUBZone) program, Service- Disabled Veteran-Owned Businesses, Small Disadvantaged Businesses, Small Business, or participant of the government Ability One Program as defined by the SBA under the identified North American Industry Classification System (NAICS)? If so, identify the status. THE FOLLOWING ONLY APPLIES TO THE SMALL BUSINESS RESPONDENTS: Responses to the below questions shall be included in a separate section of the submission and will not be counted as part of the twenty (20) page limit. If you identify your company as a Small Business (SB) or any of the SB subcategories as stipulated in Question Number One (1) above, is your company interested in a prime contract for the Design Criteria below? If so, please continue to Question Number Two (2). Under the current SB recertification regulations, do you anticipate your company remaining a SB under the Primary NAICS Code (335312 Motor and Generator Manufacturing)? In the event your company was awarded a contract as a result of a subsequent solicitation, would your company plan to be the prime contractor? Please thoroughly state how you will meet the Limitations on Subcontracting Clause Federal Acquisition Regulations (FAR) 52.219-14? If you are a small business, how do you select your partners and/or subcontractors? If you are a small business, can you go without a payment for 90 calendar days? Is your company considered a non-traditional Defense Contractor as defined by 10 U.S.C. - 2302(9)? Is your company currently registered with an active Prototype Agreements Consortium or a contractor under a Multiple Award Indefinite Delivery Indefinite Quantity Service Contract? If so, please identify the contract number, title, and agency? The following vendor survey questions must be answered within this RFI. Responses received after the suspense date and time are unlikely to be reviewed. Test reports are not required for this RFI, but the Government may reach out to respondents for those reports if needed for clarification. Interest Statement Would your company be interested in completing an engineering, manufacturing and development opportunity to successfully create, test, demonstrate, and document a STEP 2kW generator design that complies with the performance parameters listed in Attachment 1? Materiel Solution Determination Does your company believe that the current 2kW MTG specifications (Attachment 2) can be upgraded to meet the criteria listed in Attachment 1? (Yes/No) If Yes, please provide your technical solution and timetable for upgrading the 2kW MTG. If No, please explain Why Not? Does your company consider the product as described in Attachment 1 to be a commercial product or a Commercial-off-the-Shelf (COTS) product as defined by the Federal Acquisition Regulation (FAR) 2.101? (Yes/No) Why or Why Not? Does your company consider the product as described in Attachment 1 to be a Non-Developmental Item (NDI) product as defined by the Federal Acquisition Regulation (FAR) 2.101? (Yes/No) Why or Why Not? Does your company believe that a new solution is capable of being developed from a Commercial-off-the-Shelf (COTS) or Non-Developmental Item (NDI) solution with modifications to meet the criteria described in Attachment 1? (Yes/No) Why or Why Not? Does your company currently have a prototype or system that would potentially meet the criteria listed in Attachment 1? (Yes/No) If so, please provide information relating to current capabilities, TRL and MRL of the prototype or system. This information may include any relevant testing data or market information relating to the development or commercialization of the prototype or system. What are the projected operational life hours and maintenance requirements of the system? Has the technology been tested by any DoD organizations? If so, describe, if any, MIL-STD-810, MIL-STD-461, or MIL-STD-705 testing conducted on the product with the test results. Please provide test results and point of contact information for the DOD organization. Has the technology been tested by any third-party testing facility? If so, describe testing conducted on the product with the test results, and identify if testing was completed according to any of the following standards: MIL-STD-810, MIL-STD-461, or MIL-STD-705. Please provide test results and point of contact information. Has the technology been tested or demonstrated in a tactical environment? (Yes/No) Please describe and provide the results of this testing and point of contact information for any DOD organization or test and evaluation agency that conducted this test or demonstration. Discuss any further prototypes that may have already been developed that may meet the specification in Attachment 1 Does your company believe a completely new solution design is needed and capable of being developed to meet the requirements as specified in Attachment 1? (Yes/No) If Yes, please describe your technical solution and timetable and estimated cost for development of this solution. If No, please discuss why a new solution is not capable of being developed based on the specifications within Attachment 1. If you have a design that would meet most of the requirements in Attachment 1, please provide any comments, questions, or concerns relating to trade-offs you would propose to the Government. Development and Technical Approach Describe in detail your proposed technical approach for a STEP 2kW generator, which meets the requirements described in Attachment 1. Describe your solution, to include pictures and/or drawings (if available), and any requirements it does/does not meet for all capabilities listed in Attachment 1. Provide a rough order of magnitude cost estimate for both initial research and development as well as full-rate production of the items described to meet the requirements in Attachment 1. For estimating purposes, assume 15 initial prototypes and a production rate of 500 generator sets per year, on a potential 10-year period of performance. Does your firm have the in-house ability to conduct testing as defined in MIL-STD-810 and MIL-STD-705D? Discuss further the cost drivers with meeting military thresholds/objectives Estimate length of time from any contract award to delivery of a complete prototype design that can be used for testing (Prototype Test model fabrication). Discuss critical parts with high risk of failure (Reliability, Logistical Availability, Sole Sourced, etc.) Production Capabilities Does your firm have a production line that is capable of producing 500 units per year and the ability to add a second assembly line to meet surge capacity requirements? Based on an approved design, estimate length of time from contract award to establishment of production line and providing the first production model to the Government. How much time do you anticipate needing to establish a production assembly, test facilities and quality control systems for the fabrication of prototype test models? What would be your Minimum Sustaining Rate (MSR) and the associated unit cost with said MSR? Economic Production Rate? Maximum Production Rate? What, if any, efforts are required to put the product into production, along with estimated milestones and timelines. Logistics Management Are there any proprietary interfaces or royalties associated with the product? How much time does your company anticipate ramping up your Supply Chain in support of a STEP 2kW set build rate of up to 500 units per year? If you currently offer products that provide the capabilities described in this RFI, what warranties do you offer, if any, and what are they based upon (time, performance, etc.)? If the technology is in production, what has been the reliability of the product(s)? What components of your product(s) are made outside the United States, and what percentage of the total product does that constitute? What measures do you take, or will you take to ensure the integrity and quality of product used in the production of a system that meets the US Army requirement? Does your company have the ability to provide Technical Data Package (TDP), Operator Maintenance and Repair List Manuals, Provisioning Parts List and Training Packages per MIL-STD 40051-2C? Does your company maintain the necessary repair stocks for parts identified as high failure components? Does your company currently have secondary sources identified for parts that have long lead times? Does your company have a primary or preferred shipping method or company? Does your company have expertise to develop a Program of Instruction (POI), providing specific course descriptions, duration of instruction, types of instruction, and lists of resources required to conduct the course. Does your company have expertise to develop Training Support Packages (TSP) that integrates training products, materials, and/or information necessary to train one or more tasks or learning objectives Does your company have the capabilities and resources to provide instructor and key personnel training in support of potential fielding efforts for newly developed or newly procured systems? Management Techniques and Capabilities What is the technical design and manufacturing experience of your company or team to supply a product(s) of this type? What quality management processes do you have in place to ensure consistency of quality and meeting deadlines? Describe your capability for supporting packaging and preservation, handling, storage, and transportation. Describe your facility and infrastructure to support receipt, inspection, production, and final assembly. Describe your configuration management process and experience developing, tracking, monitoring, and retaining history to a technical data package baseline. Provide recent examples of past performance as a prime contractor; demonstrated capability to deliver products managing cost, schedule, and performance. Data Rights Are there any tradeoffs you are willing to accept from the Government in return for unlimited data rights for any proprietary component designs regarding this requirement (e.g., longer production period of performance, specific quantities provided by Government etc.)? If not for Unlimited Data Rights, are there any tradeoffs you are willing to accept for Government Purpose Rights?

More opportunities from Department Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc

Same awarding agency

NAICS: 335999
New
Federal
Power Distribution and Illumination Systems, Electrical (PDISE)
Solicitation # W909MY27RA001
The Department of the Army, through the Army Contracting Command-Aberdeen Proving Ground, is conducting a Sources Sought and Request for Information to identify qualified manufacturers for the Power Distribution and Illumination Systems, Electrical (PDISE) family of systems. This build-to-print effort involves the manufacture, assembly, and delivery of four specific ruggedized, man-portable electrical components: the M200 and M100 A/P Feeder Systems, the M40 A/P Distribution System, and the M46 Utility Assembly. The government is seeking to determine industry capacity, lead times, and the feasibility of small business set-asides under NAICS codes 335999 and 335313. Key technical requirements include strict adherence to Government Technical Data Packages, MIL-DTL-53126 specifications, and the use of MIL-DTL-22992 Class L connectors. Contractors must demonstrate the ability to perform First Article Testing (FAT) within 180 to 360 days after contract award and provide Chemical Agent Resistant Coating (CARC) painting conforming to MIL-DTL-53072. Interested vendors must submit a detailed questionnaire by October 22, 2026, including Rough Order of Magnitude pricing for quantity ranges of 1-50, 51-100, and 101-200 units, as well as evidence of quality certifications such as ISO 9001:2015 or AS9100D.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS