RFI USMMA Campus Modernization Program SATOC Seawall Project

Open
W912DS27S0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

United States Merchant Marine Academy, Kings Point, NY, Kings Point, NY, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts1 person available
OfficeNEW YORK, NY, 10278-0004, USA

Full Description

Show more

THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLY


This announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below. 


This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. 


The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as “Proprietary” will be handled accordingly.


The U.S. Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million.  The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000.  Work under this contract is expected to begin in winter of 2028.


The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY.  The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy.  Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below:


1. Project Purpose and Program Context
USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion.


________________________________________
2. Existing Conditions
The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north–south along the western waterfront. The seawall exhibits significant variability in height, construction type and functional purpose along with its length.


At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap. (See Attachment - USMMA Seawall Site Map)


Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone façade walls. Presume the stone façade walls incorporate a concrete core based on visual assessment.  South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent.  The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate further erosion, and support a future 12 ft. wide roadway/walkway to connect existing roads on campus.
________________________________________
3. Design and Construction Scope
This project will rehabilitate/restore 2,800-feet of seawall at the United States Merchant Marine Academy.   The scope includes progressing the government provided 35% design consisting of nine segments to 100% Design, completing all required permitting documents, reconstructing the seawall, and restoring the waterfront.


The contractor will review, validate, and advance the government-furnished 35% Design RFP package to 65% and 100% Issued for Construction (IFC) submittals across civil, structural, coastal, and geotechnical disciplines.  Following design finalization for a segment construction will commence to remove and/or restore the degraded segment of seawall.


The contractor will be required to complete the work in accordance with all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work.


________________________________________
4. Design Standards and Performance Requirements
All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC).


________________________________________
5. Acquisition Strategy and Contracting Approach
The Government intends to establish a Design-Build (D-B) Single Award Task Order Contract (SATOC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a total contract capacity of $70,000,000 over an anticipated five-year ordering period.


INFORMATION REQUESTED FROM RESPONDENTS


Areas of particular interest to the government are responses to the following questions:  


1)  Is your firm interested in competing for this project? If so, do you anticipate proposing as an integrated prime contractor/Designer of Record (DOR) team, a joint venture (JV), or a prime construction contractor with a subcontracted design firm?


2)  Based on the anticipated scope (steel sheet pile, bulkhead replacement, concrete seawall replacement, splash pads, and drainage system replacement), what percentage of the construction work do you anticipate self-performing with your own labor and equipment versus subcontracting?


3)  Describe your teams experience over the past 5–10 years designing and constructing coastal infrastructure or shoreline stabilization projects of similar scale (exceeding 2,000 linear feet) or projects involving multiple, distinct structural wall types within a single contract.


4)  What is the largest existing bulkhead or seawall replacement contract (by total dollar value and approximate linear footage) that your firm has completed as the prime contractor and/or Designer of Record? (Please specify whether each project was executed as Design-Build or Design-Bid-Build).


5)  In a Design-Build delivery model, how would your team approach executing in-water geotechnical borings in tidal Long Island Sound conditions? Do you possess the in-house marine equipment and personnel to perform this subsurface investigation, or would you subcontract it to a specialized marine geotechnical firm?


6)  Given that the 2,800-foot seawall is divided into 9 distinct segments with varying construction types (e.g., sheet pile, gravity wall, revetment), what specific technical challenges or efficiencies do you foresee in transitioning between these different wall typologies?


7) Describe your experience obtaining and/or working in compliance with Clean Water Act Section 401 Water Quality Certifications through the New York State Department of Environmental Conservation (NYSDEC) and Section 404 permits through USACE Regulatory, including managing design and construction schedules around Long Island Sound tidal and seasonal in-water work windows.  What other permits would you anticipate on this project?


8)  To minimize shoreline exposure, tidal vulnerability, and site disruption, would you recommend designing and constructing the 9 segments sequentially, concurrently in clusters, or prioritized by existing structural degradation? Based on your recommended approach, what is your estimated overall duration (broken down by design/permitting vs. construction)?


9)  Considering the varying geometry and coastal exposure of the 9 segments along Long Island Sound, do you anticipate utilizing land-based equipment, marine-based barges/vessels, or a hybrid approach for demolition, material delivery, and staging? What specific site access, staging, or upland constraints should the Government clarify or address in the Design-Build Request for Proposal (RFP)?


10)  Describe your team’s in-house or sub-consultant capabilities to perform advanced coastal engineering and numerical modeling, including nearshore wave transformation, wave overtopping, toe scour, and sea-level change lifecycle analysis. Which specific modeling tools or field measurements (e.g., spectral wave models such as SWAN/STWAVE, Boussinesq models, or Acoustic Doppler Current Profiler [ADCP] current measurements) do you anticipate needing to support final design?


11)  Describe your team’s experience managing complex marine geotechnical risks along Long Island Sound or similar coastal environments, specifically regarding Soil-Structure Interaction (SSI) modeling, lateral earth/hydrostatic loading, and global slope stability analysis in soft, saturated marine sediments or variable glacial till strata.


12)  Based on your experience with coastal Design-Build solicitations, what specific baseline coastal, hydrographic, and geotechnical data (e.g., historical storm surge/water-level statistics, offshore wave hindcast data, recent bathymetric/topographic surveys, or preliminary boring logs) do you expect the Government to provide in the 35% RFP package so that your team can accurately price and propose on the project?


13)  Assuming the Government provides regional water-level statistics and baseline offshore wave data in the 35% RFP, what site-specific numerical modeling (e.g., nearshore wave transformation, EurOtop wave overtopping, localized toe-scour analysis, or USACE Sea Level Change projections) would your team anticipate executing post-award to finalize the design across the 2,800-foot alignment?


14)  Given the variable subsurface stratigraphy of Long Island Sound, what supplemental field investigations (e.g., Standard Penetration Test [SPT] borings, Cone Penetration Testing [CPT], laboratory testing) and geotechnical modeling (e.g., PLAXIS 2D/3D, SEEP/W seepage and piping analysis, or global slope stability) do you anticipate performing post-award to advance the 35% concept into a sealed, Issued-for-Construction (IFC) foundation and wall design?


15)  How will regional regulatory moratoriums and site usage restrictions along Long Island Sound (e.g., Essential Fish Habitat [EFH] and winter flounder/anadromous fish spawning windows, protected avian nesting seasons, and peak summer recreational beach/waterway usage) impact your proposed mobilization, staging, and construction sequencing across the 9 segments?


16)  Are there specific materials anticipated for this seawall replacement (e.g., marine-grade steel sheet piling compliant with federal domestic sourcing requirements, specialized corrosion coatings, custom precast concrete units, or specific armor stone gradations) that are currently experiencing extended fabrication lead times or significant price volatility?


17)  What do you view as the top three technical, schedule, or commercial risks for this 9-segment Design-Build project (e.g., unforeseen subsurface boulders/obstructions in glacial till, coastal storm events during open excavation, or permitting/utility delays), and how can the Government best structure the RFP or allocate risk to mitigate them?


INFORMATION REQUESTED FROM RESPONDENTS


All interested, capable, qualified, and responsive firms are encouraged to reply to this announcement. The Government is requesting that interested firms furnish the following information in addition to responses to the questions above:


Corporate Information
        1.    Company name, address, point of contact, telephone number, and e-mail address.


        2.    Geographical areas in which you are capable of servicing.


3.    Business-size and socioeconomic status, as applicable:


        a.    Small or large business firm as defined by SBA, or


        b.    Certified HUBZone firm, or


        c.    Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or


        d.    SBA certified 8(a) firms.


4.    Contractor’s comments or recommendations. Please provide, if any.


SUBMISSION INSTRUCTIONS


Due Date: All responses must be submitted no later than the date and time specified on the first page of this RFI. Limit response to 5 pages.


Format: Submissions should be in Adobe PDF format. The file name should be: [Company Name]_Response_RFI_W912DS-27-S-0008.pdf.


Submission: Responses shall be submitted via email only to the following points of contact:


Contract Specialist: Mohenda Surage at Sign up to see this detail


Project Manager:   Richard Gussenhoven at Sign up to see this detail


Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
The Cayuga Inlet Flood Risk Reduction and Restoration project, identified as Project No. 46108-C, is a unit price construction contract issued by the New York State Department of Environmental Conservation and the Office of General Services. Located at 900 Taber Street in Ithaca, New York, the project has an estimated value between 23 million and 24 million dollars. The primary scope of work involves comprehensive environmental remediation and construction, specifically focusing on hydraulic dredging, earthwork for the preparation of a site management facility cell, and the establishment of staging and laydown areas. Key technical requirements include the use of geotextile tubes for dewatering, the implementation of a marine traffic control plan, and strict adherence to USACE and APWA standards for surveying and utility marking. Bids are submitted via Bid Express, with the contract awarded to the apparent low bidder based on responsiveness and responsibility, including an evaluation of financial data and past performance on similar projects. Bidders must provide bid security of 599,200 dollars, and the successful contractor is required to furnish performance and labor and material bonds for 100 percent of the contract amount. The project mandates compliance with New York State prevailing wage schedules, MWBE-EEO guidelines, and specific safety certifications for the transport of hazardous materials like calcium oxide. Deliverables include pre-construction and progress bathymetric surveys, daily dredge reports, and detailed waste manifests for disposed materials.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Milpitas Sports Center Football Bleacher Replacement
Solicitation # 26-283
The City of Milpitas is soliciting bids for Project No. 3505, the Milpitas Sports Center Football Bleacher Replacement. This project involves the removal and replacement of existing football bleachers and the implementation of various ADA upgrades at the Milpitas Sports Center located at 1325 E. Calaveras Blvd, Milpitas, CA. The comprehensive scope of work includes demolition of existing bleachers and footings, debris removal, erosion and sediment control, earthwork, grading, and the construction of new home bleachers. Additional requirements include concrete work, hardscape paving, electrical conduit routing and relocations, installation of fencing and gates, and improvements to ADA parking, restrooms, and access ramps. The contract will be awarded to the lowest responsive and responsible bidder based on the total base bid alone, with an engineer's estimate between 1.2 million and 1.4 million dollars. Eligible bidders must hold a Class A contractor license and comply with California prevailing wage laws for Santa Clara County. Bids are due by 2:00 p.m. on November 19, 2026, and must be submitted using the City's official bid forms accompanied by a 10 percent bid security. Mandatory pre-bid conferences are scheduled for October 29 and November 3, 2026. Successful contractors must provide labor and material payment bonds equal to 100 percent of the contract price. Payment will be made via progress payments at 95 percent of the City's estimate, with a 5 percent retention, provided the contractor submits required certifications, updated CPM schedules, and partial lien releases. Final acceptance of the project is contingent upon the City executing and filing a Notice of Completion with the County.
Engineering (CIP)

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
W071 Endist Portland

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

NAICS: 236220
New
Federal
Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NY
Solicitation # W912DS27BA004
The U.S. Army Corps of Engineers, New York District, is soliciting bids for a Firm Fixed Price construction project at the US Merchant Marine Academy Campus in Kings Point, NY. This 100% small business set-aside project, with an estimated magnitude between $1,000,000 and $5,000,000, involves the demolition of a 10,000 square foot residential building, a pool house, and an in-ground pool, including all necessary hazardous materials abatement and disposal. Following demolition, the contractor will perform site improvements—including SWPPP controls, landscaping, gravel parking, and utility tie-ins—and construct a turnkey, non-permanent modular office facility of approximately 5,700 square feet. The single-story, U-shaped complex will feature open office spaces, six private offices, two conference rooms, and various support rooms, with a required minimum life expectancy of 10 to 15 years. The project must be completed within 136 calendar days, with a final delivery date of May 21, 2027. The contractor is responsible for providing all furniture, fixtures, and equipment in compliance with the Buy American Act and Trade Agreements Act. Key requirements include adherence to Davis-Bacon wage determinations, EM 385-1-1 safety standards, and ADA/ABA accessibility guidelines. Bids must be submitted electronically via the PIEE suite by December 7, 2026. Payment will be processed through the Wide Area WorkFlow system, and the contractor must furnish the required performance and payment bonds.
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541380
New
Federal
Synopsis – Chemical Sampling and Testing of Dredged Material for USACE New York District
Solicitation # W912DS27BA002
The US Army Corps of Engineers, New York District, intends to award one Indefinite Delivery Indefinite Quantity contract for the chemical sampling and testing of dredged material. The scope of work includes sampling for placement at the Historic Area Remediation Site and other upland locations, adhering to specific USACE, EPA, and state regulations for New York and New Jersey. Task orders may encompass sediment and water collection via contractor-supplied ships, sample processing, physical and chemical analyses, and the delivery of detailed reports including quality assurance and quality control data. Additional requirements include the ability to perform specialized tests such as SPLP, TCLP, and MET, as well as potential environmental DNA and metagenomic analyses. The contract has a five-year period of performance with a total magnitude of up to 10 million dollars, averaging 2 million dollars annually. Work will be conducted within the Port of New York and New Jersey, Federal Navigation Channels, the Hudson River, and the Atlantic Ocean. This is an unrestricted full and open competition award to the lowest bidder who can demonstrate capability to EPA Region 2. Bidders must provide a Work/Quality Assurance Plan and an Accident Prevention Plan for approval prior to starting work.
Testing Laboratories and Services

POSTED

7 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS