This Solicitation opportunity from California was posted on July 13, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to RFB 11037 Ridgehaven Tenant Improvement Elevator Upgrades: This document is Addendum No. 1 to Request for Bid (RFB) 11037 for Ridgehaven Tenant Improvement Elevator Upgrades issued by the County of San Diego Department of Purchasing and Contracting. Dated July 19, 2021, it modifies the original contract documents as specified. The addendum includes virtual bid opening information with Webex access details and contact information for the procurement specialist Angie Kang for questions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment A-1 Interior Finish Keynotes for John Duffy Admin Bldg: This document is Attachment A-1 for the John Duffy Administration Building project, containing interior finish keynotes. It lists various construction and finish details such as finish floor and ceiling lines, casework materials, gate finishes, hall materials, base finishes, plumbing fixtures, glass specifications, door and frame schemes, and other interior elements. The notes provide specific references to materials, dimensions, and installation instructions relevant to the interior finishes. This document is essential for understanding the technical specifications and finish requirements for the building's interior.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for John Duffy Admin Bldg Plumbing and Electrical Notes: This document contains detailed plumbing and electrical notes for the John Duffy Administration Building project. It includes instructions for removing and replacing plumbing fixtures, piping, and connections, as well as electrical conduit routing, device locations, and coordination requirements with mechanical equipment and furniture suppliers. The document outlines key points of connection for water, waste, and vent lines, and special notes for electrical contractor coordination. It serves as a technical specification guide for contractors to follow local, state, and national codes during installation and rough-in phases.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for John Duffy Admin Bldg Plumbing Fixture Removal and Replacement Notes: This document provides key notes for plumbing fixture removal and replacement at the John Duffy Administration Building. It includes instructions to remove existing plumbing fixtures and associated piping, cap lines, replace lavatory faucets with ADA-compliant insulation, and details points of connection for vent, cold water, waste, and condensate drain lines. The notes also specify coordination for shower stall floor drain locations and routing of hot and cold water lines to fixtures. The document is essential for understanding plumbing modifications and connections in the building renovation project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 11037 Ridgehaven Tenant Improvement Elevator Upgrades: This document is the Request for Bid (RFB) 11037 for the Ridgehaven Tenant Improvement Elevator Upgrades project issued by the County of San Diego on behalf of the San Diego Regional Building Authority. The bid opening date was July 27, 2021. It includes bid schedules, bidder information, project description, and requirements such as contractor licensing and Disabled Veterans Business participation. The project involves modernization and upgrading of two public elevators, including controls, hoist ways, and associated equipment. The document also contains the apparent low bidder's information and bid amounts. It outlines submission instructions, contract duration, and compliance conditions.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 11037 Ridgehaven Tenant Improvement Elevator Upgrades: This document is the Request for Bids (RFB) No. 11037 for the Ridgehaven Tenant Improvement Elevator Upgrades, Oracle Project No. 1022825, issued by the County of San Diego Department of General Services. The bid opening date is July 27, 2021, at 2:00 p.m. The document includes bidding information, special notices regarding Disabled Veterans Business participation requirements, instructions for submitting bids, and contract documents. The project involves modernization and upgrading of two public elevators including hoist ways, controls, car enclosure, corridor elevator control upgrades, machine room equipment, and associated elevator and fire accessories. The contract duration shall not exceed 225 calendar days, and the estimated project cost is between $595,000 and $650,000. The document also outlines requirements for subcontractors and licensing.
PDF
PDF, Low priorityother
LowAI Summary for 2906297 S63712 Attachment D 1 Original Ridgehaven: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 2906297 S63713 Attachment D-2 Original Ridgehaven: The document named '2906297___S63713___attachment_d_2._original_ridgehaven.pdf' appears to be empty or unreadable as no content is provided within the document content sections.
PDF
PDF, Low priorityother
LowAI Summary for Attachment B John Duffy Admin Bldg Fire Alarm: The document titled 'Attachment B John Duffy Admin Bldg Fire Alarm' appears to be an attachment related to a fire alarm system for the John Duffy Administration Building. The content is not available or is empty, so no further details can be provided.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Planholders List for RFB 11037 Ridgehaven Elevator Upgrades: This document is a planholder's list for the Ridgehaven Tenant Improvement Elevator Upgrades project, bid number 11037, with a bid date of July 27, 2021 at 2:00 p.m. It includes details of companies and contacts who have obtained the bid documents, such as Benesh Electric DVBE, including contact information and addresses. The list serves as a record of interested subcontractors or general contractors for this specific Request for Bid (RFB).
PDF
PDF, Low priorityother
LowAI Summary for S63715 Ridgehaven Floor Plan 1999: The document titled 'S63715 Ridgehaven Floor Plan 1999' appears to be a floor plan attachment from 1999. The content is not readable or extractable, and no further details are available.