This Solicitation opportunity from Virginia was posted on September 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
XLSX, High priority: read this firstspecifications
HighAI Summary for Attachment C4 - Monthly Interval Data Transit Building 2022-2025: This document provides historical monthly energy usage data for the Transit Building from 2022 through 2025. It includes detailed metrics such as metered/billed KW and KWH, load factors, bill totals, and cost per day for account 020-182-017-0-3 under the GS-PUBLIC AUTHORITY-SECONDARY tariff.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for Attachment E - Blacksburg Transit Terms and Pricing Model: A pricing model and cash flow template for a Power Purchase Agreement (PPA) project for Blacksburg Transit. The document includes fixed assumptions regarding electricity consumption, grid rates, and lease terms, and provides a structured input sheet for proposers to calculate PPA rates, solar production, and annual cash flows over a 35-year period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Blacksburg Transit Facility Expansion - As-Built Drawings: As-built drawings and technical specifications for the Blacksburg Transit Facility expansion, dated April 27, 2005. The document includes a drawing list, site summary, detailed electrical plan notes, and add-alternate requirements for generator power.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 1220-25 Solar Power Purchase Agreement Services: Request for Proposal (RFP 1220-25) issued by the Town of Blacksburg on August 29, 2025, for Solar Power Purchase Agreement Services. The document outlines the proposal schedule, submission instructions via eVA or physical delivery by September 30, 2025, general and federal terms and conditions, and a scope of services. It includes various attachments such as structural engineering reports, AEP energy data, and a pricing model template.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 1220-25 Solar Power Purchase Agreement Services - Addendum #1: Addendum #1 issued on September 18, 2025, for RFP 1220-25 regarding Solar Power Purchase Agreement Services for the Town of Blacksburg. The document provides formal responses to 14 vendor inquiries covering municipal lease requirements, PPA terms, selection criteria, roof penetration standards, SREC handling, and the anticipated award timeline (targeting early December execution). It also clarifies that certain proposal sections are exempt from the 15-page narrative limit.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 1220-25 Solar Power Purchase Agreement Services - Addendum #2: Addendum #2 dated September 23, 2025, for RFP 1220-25 regarding Solar Power Purchase Agreement Services. This modification revises Attachment E (Terms and Pricing Model Cash Flow) to correct data presentation. Bidders are required to sign and return this addendum with their proposal.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 1220-25: Solar Power Purchase Franchise Agreement: A Request for Proposal (RFP 1220-25) issued by the Town of Blacksburg, Virginia, dated August 29, 2025. The document includes a draft ordinance and a template Solar Power Purchase Agreement for the procurement of solar power purchase services for Town-owned facilities, including definitions and legal frameworks for the franchise agreement.
PDF
PDF, High priority: read this first7 pages · contract-document
HighAI Summary for Structural Roof Capacity Report for Blacksburg Transit Facility Solar Array Installation: This structural engineering report evaluates the roof capacity of the Blacksburg Transit Facility to support an additional dead load of 3.5 psf from mechanically attached photovoltaic solar arrays. The analysis includes review of original and expansion building plans, field measurements, and load estimations including roof dead loads, snow loads, and mechanical equipment loads. The report identifies specific roof areas where solar arrays can be safely installed (green zones) and areas where installation is not permitted (red zones). Recommendations include designing the solar array system to withstand specified wind loads and obtaining written approval from the roof guarantor prior to installation. The report serves as a key technical document to ensure safe and compliant solar array installation on the facility's roof.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Tariff 347 - Large General Service Time of Day - Public Authority: Public Authority Tariff No. 18, Schedule L.G.S.-T.O.D. P.A., detailing electricity rates for municipal and state governmental entities with capacity requirements between 100 kW and 1,000 kW. Includes pricing for secondary and primary voltages, on-peak/off-peak energy charges, billing demand measurements, and payment terms. Effective per Final Orders from 2019 and 2020.
PDF
PDF, Low priorityother
LowAI Summary for APCO Bill - Town of Blacksburg - July 2025: Utility invoice from Appalachian Power (APCO) for the Town of Blacksburg, account #025-158-046-0-3, covering the billing period from 06/24/25 to 07/23/25. The document details electricity usage, line item charges including generation and distribution services, and a total balance due of $9,018.01.
PDF
PDF, Low priority3 pages · other
LowAI Summary for Appalachian Power Company Public Authority Tariff No. 18 - Schedule G.S.P.A. Rates and Terms: This document details the Public Authority Tariff No. 18, Schedule G.S.P.A., issued by Appalachian Power Company pursuant to the Virginia Public Authorities Agreement for the Purchase of Electricity. Effective January 1, 2021, it outlines the availability of electric service to municipal corporations and state governmental entities (excluding Public Housing Authorities and the Commonwealth of Virginia) with normal maximum electrical capacity requirements exceeding 25 kW per month. The tariff specifies monthly rates including basic service charges, demand charges, off-peak excess demand charges, and energy charges for various voltage levels (secondary, primary, subtransmission, and transmission). It also includes provisions for minimum charges, payment terms, measurement and determination of billing demand, optional time-of-day metering, metered voltage adjustments, and contract terms. The document serves as a rate schedule and service terms reference rather than a solicitation or contract opportunity.
XLSX
XLSX, Low priorityspecifications
LowAI Summary for Attachment D4 - Monthly Interval Data EV Bus Chargers 2022-2025: This document contains historical monthly energy consumption and billing data for EV Bus Chargers from 2022 through 2025. It includes metrics such as metered/billed KW and KWH, load factors, and total costs associated with account 025-158-046-0-3.
CSV
CSV, Low priority122 pages · other
LowAI Summary for Electricity Usage Data Report for Premise 20182017 on 9/1/2024: This document contains detailed electricity usage data for premise number 20182017, recorded in 15-minute intervals on September 1, 2024. The data includes timestamps, usage dates, interval times, and kilowatt (KW) consumption values. The dataset shows continuous delivered power usage throughout the day, capturing fluctuations in energy consumption at quarter-hour increments. This information appears to be raw metering or consumption data rather than a solicitation or contract-related narrative. It is likely intended for monitoring, analysis, or reporting purposes rather than for direct contract response.
CSV
CSV, Low priority59 pages · other
LowAI Summary for Electricity Usage Data Report for Premise 20182017 on July 7-8, 2025: This document contains detailed electricity usage data for premise number 20182017, recorded in 15-minute intervals on July 7 and early July 8, 2025. The data includes timestamps, usage dates, interval times, and kilowatt (KW) consumption values. The dataset shows fluctuations in power consumption throughout the day and night, with peak usage occurring during daytime hours. The information appears to be raw metering data rather than a government contract or solicitation document. It does not contain any contract terms, requirements, or instructions for responding to a government procurement. Therefore, it is classified as 'other' and assigned a low priority for contract response purposes.
CSV
CSV, Low priority122 pages · other
LowAI Summary for Electricity Usage Data Report for Premise 25158046 on 9/1-9/2/2024: This document contains detailed electricity usage data for premise number 25158046, recorded in 15-minute intervals over the dates of September 1 and 2, 2024. The data includes timestamps, usage dates, interval times, and kilowatt (KW) consumption values. The usage pattern shows mostly low consumption values throughout the day with a significant spike in electricity usage during the evening hours on September 1, 2024, between 19:30 and 21:00. The dataset appears to be a raw or processed meter reading report rather than a contract or solicitation document. It provides granular energy consumption information likely for monitoring or billing purposes.
CSV
CSV, Low priority59 pages · other
LowAI Summary for Electricity Usage Data Report for Premise 25158046 on July 7-8, 2025: This document contains detailed electricity usage data for premise number 25158046, recorded in 15-minute intervals on July 7 and early July 8, 2025. The data includes timestamps, usage dates, interval times, and kilowatt (KW) consumption values. Usage varies significantly throughout the day, with low consumption during early morning hours and peaks occurring in the late afternoon and evening. The dataset appears to be a raw or processed energy consumption log, likely used for monitoring, analysis, or billing purposes. There is no solicitation, contract, or procurement-related information present.
PDF
PDF, Low priority4 pages · other
LowAI Summary for Town of Blacksburg Electric Service Bill and Usage Summary from Appalachian Power: This document is an electric service bill issued by Appalachian Power to the Town of Blacksburg Author for the service address at 2800 Commerce St, Blacksburg, VA. It details the billing period from June 24, 2025, to July 23, 2025, with a total current charge of $7,412.27 and a total amount due by August 13, 2025, of $13,894.64. The bill includes line item charges for generation, transmission, distribution services, fuel factor, and applicable taxes. Usage history over the past 12 months is provided, showing an average monthly consumption of 53,187 kWh. Additional information includes payment methods, meter reading details, and customer service contacts. The document also explains service definitions, tax information, and payment processing details. This is a utility billing statement and not a government contract solicitation or related document.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.