This Solicitation opportunity from California was posted on August 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Attachment B: Scope of Preconstruction Services - Epicentre CMAR: This document outlines the scope of preconstruction services for the Epicentre CMAR project. It details the contractor's responsibilities during the design and development phases, including cost estimation, scheduling, risk mitigation, and constructability reviews. It specifically defines the requirements for the Guaranteed Maximum Price (GMP) package, including the necessary documentation, fee structures, and schedules required for submission.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Attachment C: Division of Costs - Epicentre CMAR: Attachment C outlines the division of costs for a Construction Manager at Risk (CMAR) project. It categorizes expenses into Direct Pass-Through Costs, Contractor's Fees, and Owner Conditions Fees across several areas, including project jobsite staff, cost of work, temporary facilities, general requirements, indirect/miscellaneous costs, hoisting, and main office expenses.
DOCX
DOCX, High priority: read this first42 pages · specifications
HighAI Summary for Epicentre CMAR Draft General Conditions: A draft document outlining the General Conditions for a Construction Manager at Risk (CMAR) project for the County. It defines legal requirements, administrative procedures, payment terms, change orders, and contractor responsibilities, including detailed definitions of the Contractor's Fee and Budget Not-To-Exceed.
PDF
PDF, High priority: read this first47 pages · specifications
HighAI Summary for Epicentre CMAR Draft General Conditions: A draft document outlining the General Conditions for a Construction Manager at Risk (CMAR) project for the Epicentre. It defines the roles, responsibilities, and legal obligations of the County and the Contractor, covering project administration, change orders, site conditions, and subcontractor management.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Exhibit F: Insurance and Bonding Requirements - Epicentre CMAR: This document outlines the minimum insurance and bonding requirements for contractors under the Epicentre CMAR project for the County of San Diego. It specifies required coverages including Commercial General Liability, Automobile Liability, Workers' Compensation, Professional Errors and Omissions, Pollution Legal Liability, and Builder's Risk, along with minimum liability limits and mandatory endorsements for additional insureds and primary insurance.
PDF
PDF, High priority: read this first7 pages · contract-document
HighAI Summary for Mira Mesa Epicentre - Construction Manager at Risk Agreement: A draft agreement between the County of San Diego and a Contractor for Construction Manager at Risk (CMAR) services for the Mira Mesa Epicentre project. The contract is structured in two phases: Phase 1 (Pre-Construction) and Phase 2 (Construction), with a total Budget Not-To-Exceed of $6,778,780.00. It defines the scope of work, payment terms, contract timelines, and liquidated damages.
DOCX
DOCX, High priority: read this first7 pages · contract-document
HighAI Summary for Mira Mesa Epicentre - Construction Manager At Risk (CMAR) Contract: Draft agreement between the County of San Diego and a Contractor for Construction Manager At Risk (CMAR) services for the Mira Mesa Epicentre project. The contract is structured in two phases: Pre-Construction Services (Phase 1) and Construction (Phase 2), with a total Budget Not-To-Exceed of $6,778,780.00. It includes provisions for liquidated damages, compensable delays, and a specific timeline for both phases.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Mira Mesa Epicentre Preliminary Schedule: Preliminary project schedule for the Mira Mesa Epicentre, outlining key milestones including the CMAR Phase 1 award bid in November 2023, Phase 1 completion in September 2024, and Phase 2 spanning from September 2024 to March 2026.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFP 12545 Addendum No. 01 - Mira Mesa Epicentre: Addendum No. 01 dated September 13, 2023, for the County of San Diego RFP 12545 regarding Construction Manager-at-Risk services for the Mira Mesa Epicentre. This modification changes the mandatory job walk/site inspection requirement to optional.
PDF
PDF, High priority: read this first5 pages · amendment
HighAI Summary for RFP 12545 Addendum No. 02 - Mira Mesa Epicentre: Addendum No. 02 for RFP 12545 regarding Construction Manager-at-Risk services for the Mira Mesa Epicentre. This document extends the proposal due date to October 12, 2023, and replaces the original Evaluation Criteria, Submittal Items, and Terms and Conditions sections with revised versions, including a detailed scoring breakdown and specific submission requirements.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for RFP 12545 Addendum No. 03 - Mira Mesa Epicentre: Issued October 6, 2023, this addendum for RFP 12545 regarding the Construction Manager-at-Risk (CMAR) for the Mira Mesa Epicentre provides a series of questions and answers. Key clarifications include an updated Phase 1 estimated duration of 275 calendar days, confirmation of a 12-month warranty period after substantial completion, a prohibition on self-performing work, and guidance on the project's permitting process through the City of San Diego.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for RFP 12545 Addendum No. 04 - Mira Mesa Epicentre: Addendum No. 04 dated October 11, 2023, for the County of San Diego RFP 12545 regarding Construction Manager-at-Risk services for the Mira Messa Epicentre. This document extends the proposal due date to October 17, 2023, and provides clarifications via a Q&A section regarding design layout services, permitting, narrative page limits, subcontractor bonding, and DIR Skilled and Trained Workforce requirements.
PDF
PDF, High priority: read this first37 pages · rfp
HighAI Summary for RFP 12545 - Mira Mesa Epicentre CMAR: The County of San Diego, Department of Parks and Recreation, is soliciting proposals for a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the rehabilitation of the Mira Mesa Epicentre facility into a community center. The project budget is not to exceed $6,778,780.00. The RFP includes a mandatory job walk on September 14, 2023, and a proposal submission deadline of October 5, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S75764 - 100 Percent Schematic Drawings: This document contains 100% schematic drawings for project S75764, including exterior elevations (West, South, and East) and a curtain wall legend specifying glazing and aluminum system types. The document is marked as 'Preliminary Not For Construction'.
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for Exhibit G - Warranty Letter (Epicentre CMAR): A warranty letter exhibit for a County Agreement where the Contractor warrants that the plans, specifications, and contract documents are consistent, practical, feasible, and constructible within the specified budget and timeframe.
PDF
PDF, Low priority2 pages · performance-bond
LowAI Summary for RFP 12545 - Exhibit D: Performance Bond (Mira Mesa Epicentre): Exhibit D provides the standard Performance Bond template for the Mira Mesa Epicentre Construction Manager at Risk (CMAR) contract (RFP 12545) for the County of San Diego. It outlines the legal obligations of the Principal and Surety to ensure the faithful performance of the contract and specifies the remedies available to the County in the event of a default.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for RFP 12545 - Exhibit E Payment Bond Form (Mira Mesa Epicentre): A template for a Payment Bond (Exhibit E) required for the Construction Manager at Risk (CMAR) contract for the Mira Mesa Epicentre project (RFP 12545) for the County of San Diego. It outlines the legal obligations of the Principal and Surety to ensure payment to subcontractors and laborers per the California Civil Code.
PDF
PDF, Low priorityother
LowAI Summary for RFP 12545 - Mira Mesa Epicentre Job-Walk Sign-In Sheet: A sign-in sheet from a job-walk conducted on September 14, 2023, for the County of San Diego's RFP 12545 regarding a Construction Manager-at-Risk with a Guaranteed Maximum Price for the Mira Mesa Epicentre. The document lists attending representatives from various general contracting firms.
TXT
TXT, Low priority1 page · special-notice
LowAI Summary for RFP 12545 - Notice of Intent to Award (Mira Mesa Epicentre): Notice of Intent to Award issued by the County of San Diego Department of Parks and Recreation on January 16, 2024, for RFP 12545 (CMAR with a Guaranteed Maximum Price for Mira Mesa Epicentre). The County intends to award the contract to Balfour Beatty Construction, LLC, subject to successful negotiations.
PDF
PDF, Low priority16 pages · industry-day
LowAI Summary for RFP #12545 Pre-Proposal Conference Slides - Mira Mesa Epicentre: Presentation slides from a pre-proposal conference held on September 7, 2023, for the County of San Diego Department of Parks and Recreation RFP #12545. The procurement is for a Construction Manager-at-Risk with a Guaranteed Maximum Price for the Mira Mesa Epicentre. The document outlines the submission process via BuyNet, the evaluation criteria (Experience, Project Plan, Price, etc.), key deadlines (questions by Sept 21, proposals by Oct 5, 2023), and required submittal forms including the PC-600 and Nondisclosure Indemnification Agreement.
PDF
PDF, Low priority1 page · notice-to-proceed
LowAI Summary for Sample Notice to Proceed - Mira Mesa Epicentre CMAR: A sample Notice to Proceed template for the County of San Diego regarding the Mira Mesa Epicentre contract. The document outlines the award date, time of completion, and start/end dates for work, and requires a signed acknowledgment from the contractor.