Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

RFP-171-260000002517-1 | 751/24128.TAP; Firestone River Bridges - Improvements

Active
RFP-171-260000002517-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation RFP-171-260000002517-1, also identified as File No. 751/24128.TAP, is a request for professional architectural and engineering services to perform a Phase 100 Study for the Firesteel River Bridges Improvements on the Bill Nicholls Trail in Ontonagon County, Michigan. Issued by the Department of Technology, Management and Budget on behalf of the Michigan Department of Natural Resources, the project requires a complete design for bridge improvements, including inspections, scour evaluation, and condition analysis. The scope involves refurbishing three bridges, with specific work including the replacement of wear courses with treated prefab panels, upgrading GlueLam railings to steel, and implementing chip sealing. All work must adhere to Michigan Department of Transportation 1990 Standard Specifications, AASHTO Standard A18.12-99, and EM T770-8 for timber bridge design. The contract is structured as a not-to-exceed fee based on billable hourly rates, with an estimated total contract amount of 12,167.50 dollars. Proposals are due by September 17, 2026, at 2:00 p.m. Eastern Time via the SIGMA VSS portal. Award selection is determined by an Ad Hoc Advisory Committee using a weighted evaluation of 80 percent for the technical proposal and 20 percent for the cost proposal. Qualified firms must provide a designated Project Manager and certify their status as a Michigan-based business. Compliance with federal and state safety and environmental regulations, including OSHA and MIOSHA, is mandatory for all performance activities.

General Info

Michigan DTMB seeks proposals for Firestone River bridge infrastructure improvements by September 17, 2026.

Agency

Michigan → DTMBView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

MI, USA

Set-Aside

NONE

Documents

(20)

8b FRB Site Location Map

PDF1 pageother

File No. 75/01457.HRB – Firesteel River Bridge No. 4 Deck Replacement Plans

PDFsow

B-26-F Bridge Railing, 4 Tube Standard Plan

PDFspecifications

1 FRB Site Location Map

PDF1 pageother

Bridge Superstructure Condition Inspection and Load Ratings Letter

PDF74 pagesother

Bridge details photos - miscellaneous product images

PDFother

Firesteel Bridge Refurbishment Workscope

PDF7 pagessow

Firesteel River Bridges No. 2 & 3 deck replacement plans

PDFspecifications

Firesteel River Bridge No. 4 Deck Replacement Plans

PDFspecifications

T23388 Michigan DNR Multi-Use Trail Bridge Specifications

PDFspecifications

6a W Branch (South) Bridge 2 Photos

PDFother

QNAP Copper Naphthenate Specification Brochure

PDF6 pagesspecifications

Middle Branch Bridge 3 Photos - Span 135 Paces

PDFother

File No. 751/24128.TAP RFP – Bill Nicholls Trail Bridges Improvements

PDF18 pagesrfp

Wood Bridge Deck Chip Sealing response email

PDF1 pageother

File 751/24128.TAP Project Statement - Firesteel River Bridges Improvements

PDF4 pagespresolicitation

Wheeler Panel-Lam Timber Vehicle Bridges brochure

PDF2 pagesother

Firesteel Rehab 2 & 3 Drawings - Detail Notes

PDFspecifications

6c E. Branch (North) Bridge 4 photos

PDFother

Bridge Superstructure Condition Inspection and Load Ratings

PDF74 pagesinspection-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → DTMB
Contacts2 people available
OfficeMI, USA
Organization / Agency
Michigan → DTMB
View Agency Profile
Office AddressMI, USA

Full Description

Show more
751/24128.TAP; Firestone River Bridges - Improvements

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # pier-b-dock-rail-support-facility-west-expansion-pier-b-street-realignment
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE) and Veteran-Owned Small Business Enterprises (VSBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The comprehensive scope of work includes civil and site work, utilities and piping, paving and structures, and specialized electrical and telecommunications systems. Eligible firms must provide certification through the Department of General Services and the Port of Long Beach PlanetBids portal, hold a valid California Contractor's license, and provide acceptable insurance. Subcontractors and material contractors may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, and operating engineers. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested bidders must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Michigan → DTMB

Same awarding agency