This Solicitation opportunity from California was posted on November 24, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Contract 538433 - New Imperial Beach Library Geotechnical Data Report: A preliminary geotechnical data report dated March 14, 2014, prepared by Ninyo & Moore for the County of San Diego. The document provides soil and geologic condition data, subsurface exploration results (borings and CPT soundings), and hazard evaluations (seismicity, liquefaction, and flooding) to support the design-build team for the construction of a new 12,000 square-foot library facility in Imperial Beach, California.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Imperial Beach Adjacency Diagram (RFP 6719 Exhibit B): Exhibit B for RFP 6719, providing an adjacency diagram for the Imperial Beach project to define spatial relationships and layout requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Imperial Beach Branch Library - Net Zero Energy Feasibility Report: A feasibility report dated September 24, 2014, for the Imperial Beach Branch Library project. The document outlines the path to achieving a Net Zero Energy Capable (NZEC) all-electric building, providing energy use intensity (EUI) metrics, renewable energy potential, and specific technical assumptions regarding the building envelope, lighting, HVAC, and plumbing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Imperial Beach Branch Library Project - Mitigated Negative Declaration: A Mitigated Negative Declaration for the Imperial Beach Branch Library Project (Project No. 1014143) by the County of San Diego. The document outlines environmental findings under CEQA and specifies mandatory mitigation measures regarding air quality, biological resources (nesting birds), erosion control, and hazardous materials (asbestos and lead-based paint abatement).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Imperial Beach Community Center Hazardous Materials Report: An asbestos and lead evaluation report dated December 27, 2013, for the Imperial Beach Community Center. The document identifies asbestos-containing materials (acoustic spray ceiling, floor tiles, mastic, plaster) and high concentrations of lead in bathroom walls and floor tiles. It provides critical technical data and recommendations for hazardous material management prior to proposed demolition or renovation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Imperial Beach Library Pre-Demolition Hazardous Materials Report: A pre-demolition asbestos and lead survey report for the Imperial Beach Library dated December 20, 2013. The document identifies asbestos-containing materials (acoustic ceiling and gray duct mastic) and high concentrations of lead in exterior white stucco. It provides critical technical data and recommendations for contractor compliance with Cal/OSHA and Cal/EPA regulations during demolition.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 6575 Imperial Beach Branch Library - Basis of Design: This document provides the Basis of Design (BOD) guidelines for the design-build project of the Imperial Beach Branch Library. It outlines general design requirements, including LEED Gold and Net Zero Energy certifications, spatial needs, interior design considerations, and mechanical/electrical system flexibility. It specifies requirements for public plazas, interior finishes, ADA-compliant signage, and budget allowances for furnishings and public art.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 6575 Imperial Beach Branch Library Program Requirements: This document outlines the program requirements for the design-build construction of the new Imperial Beach Branch Library for the County of San Diego. It specifies a freestanding, one-story structure of approximately 14,000 square feet, targeting LEED Gold certification and Net Zero Energy initiatives. The document details general program requirements, sustainable design goals, site design considerations, and the process for design modifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 10 - Design-Build Imperial Beach Library: Addendum No. 10 dated January 20, 2015, for RFP 6719 regarding the Design-Build of the Imperial Beach Library. It provides the schedule for final presentations on January 30, 2015, updates roof warranty requirements to 20 years, and provides clarifications on ZNE reporting, site property boundaries, parking improvements, SWPPP responsibilities, permitting, and PV allowances.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 11 - Imperial Beach Library: Addendum No. 11 dated January 22, 2015, for RFP 6719 (Design-Build Imperial Beach Library). This document provides a revised schedule for final presentations on January 30, 2015, including specific time slots for T.B. Penick & Sons, Inc., McCarthy Building Companies, Inc., and C.W. Driver, Inc.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 2 - Imperial Beach Library Design-Build: Addendum No. 2 dated December 12, 2014, for RFP 6719 regarding the Design-Build Imperial Beach Library. This document provides the schedule and logistics for the first mid-course presentations occurring on December 19, 2014, for T.B. Penick & Sons, Inc., McCarthy Building Companies, Inc., and C.W. Driver, Inc.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 3 - Design-Build Imperial Beach Library: Addendum No. 3 to RFP 6719 for the Design-Build Imperial Beach Library project, dated December 16, 2014. This document provides the schedule and logistics for the first mid-course presentations occurring on December 19, 2014, including specific time slots for T.B. Penick & Sons, Inc., McCarthy Building Companies, Inc., and C. W. Driver, Inc.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 4 - Design-Build Imperial Beach Library: Addendum No. 4 issued on December 17, 2014, for RFP 6719 regarding the Design-Build of the Imperial Beach Library. This document revises the project schedule to 405 calendar days from the Notice to Proceed and provides instructions for the Project Schedule Form and Gantt-type schedule requirements. It also notifies bidders that Appendix R (County Site Survey) and Appendix S (As-Builds for the Marina Vista Room) will be issued via BuyNet.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 5 - Design-Build Imperial Beach Library: Addendum No. 5 dated December 18, 2014, for Request for Proposals (RFP) 6719 regarding the Design-Build of the Imperial Beach Library for the County of San Diego. This amendment provides notice regarding the availability of Appendix R (County Site Survey) on CD for Design-Build Entities (D-BEs) and provides contact information for the Project Manager and Procurement Contracting Officer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 6 - Design-Build Imperial Beach Library: Issued December 23, 2014, by the County of San Diego, Addendum No. 6 modifies RFP 6719 for the Design-Build Imperial Beach Library. Key changes include a revised Skilled Labor Force Form, clarifications on code compliance for the Marina Vista Complex, stormwater treatment considerations for Veterans Park, and updates to proposal page limit exclusions. It also provides details on the County's Commissioning Agent and schedules the second mid-course presentations for January 8, 2015.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 7 - Design-Build Imperial Beach Library: Addendum No. 7 dated December 30, 2014, for RFP 6719 regarding the Design-Build Imperial Beach Library. This document revises headers in Section C (Contract Requirements) and inserts a mandatory SB 854 Notice concerning DIR registration requirements for contractors and subcontractors on public works projects.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 8 - Imperial Beach Library: Issued January 5, 2015, by the County of San Diego, Addendum No. 8 modifies RFP 6719 for the Design-Build Imperial Beach Library. Key changes include the replacement of the Price Proposal Form (Page A-9) to incorporate a $300,000 allowance for a ZNE Photo Voltaic system and provides clarification regarding the use of the LEED checklist to achieve LEED Gold certification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Addendum No. 9 - Imperial Beach Library Design-Build: Addendum No. 9 dated January 13, 2015, for RFP 6719 regarding the Design-Build of the Imperial Beach Library. Key changes include the County assuming responsibility for permitting and special inspection fees, extending the contract duration from 405 to 485 calendar days, and clarifying that the Design-Builder provides only infrastructure for EV charging stations. It also establishes a $300,000 allowance for ZNE Photo Voltaic systems outside the base GMP.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix A - Site Maps: This document is Appendix A (Site Maps) for RFP 6719, detailing the proposed 12,000 SF Imperial Beach Branch Library and 2,500 SF community room renovation. It includes building data, lot area calculations, parking requirements (38 spaces), and specific instructions for curb demolition, paving, and parking stall reconfiguration on East 8th Street.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for RFP 6719 Appendix B - Imperial Beach Branch Library Concept Floor Plan: A conceptual floor plan for the Imperial Beach Branch Library, part of RFP 6719 for the County of San Diego Department of General Services. The document outlines a 12,000 SF library layout including a community room, children's area, teen area, and parking specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix E: Libris Design Planning Documentation: This document is Appendix E of RFP 6719, providing detailed technical design and planning specifications for library lighting. It outlines standards for bookstack illumination (minimum 6 ft-c), compares lighting schemes (parallel, perpendicular, indirect, and hybrid), and provides guidelines for general reading and staff areas, including glare reduction and maintenance accessibility.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix G - Imperial Beach Branch Library FF&E List: Appendix G of RFP 6719 provides a detailed proposed Furniture, Fixtures, and Equipment (FF&E) list for the Imperial Beach Branch Library. The document specifies quantities and items for various zones, including the Lobby, Marketplace, Great Room, Public Computer Center, and Staff Areas.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix J - LEED Information: This document is Appendix J of RFP 6719, detailing the LEED 2009 requirements for New Construction and Major Renovation. It specifies mandatory prerequisites and optional credits across categories including Sustainable Sites, Water Efficiency, Energy & Atmosphere, and Materials & Resources to guide project certification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix L - Recommended Furniture Movers: Appendix L of RFP 6719 provides a list of approved moving subcontractors authorized to perform library book relocation services between existing, temporary, and newly constructed library facilities. The document lists four approved vendors: Hallett and Sons Expert Movers, National Library Relocations, Clancy-Cullen Library Relocation, and William B Meyer INC.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix Q - Library Branded Signage: This document consists of production-ready graphic design specifications and approval sheets for branded signage for the San Diego County Library, dated February 21, 2012. It includes design details from Motivational Systems Inc (MSI) and requires client signature for final approval of the designs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix S - Marina Vista Park Original Plans: This document is an index of drawings and architectural plans for Marina Vista Park in Imperial Beach, California, dated August 1969. It lists various existing sections and identifies the landscape architects and consultants involved in the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix S - Marina Vista Park Original Vet Park Plans: This document consists of the original park plans for Marina Vista Park, provided as Appendix S to RFP 6719. It contains technical drawings and site specifications necessary for the procurement project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix S - Marina Vista Park Original Vet Park Plans: This document consists of the original design plans for the Veteran's Park at Marina Vista Park, provided as Appendix S to RFP 6719. It contains technical site plans and specifications necessary for the procurement project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix S - Marina Vista Park Original Vet Park Plans: This document consists of the original veteran park plans for Marina Vista Park, provided as Appendix S to RFP 6719. It contains technical site plans and design specifications necessary for the procurement project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 6719 Appendix S: Marina Vista Park Plans: Technical plans and specifications for the Marina Vista Park project, provided as Appendix S to RFP 6719. The document contains detailed architectural and engineering drawings for the park's development.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 6719 Design-Build Imperial Beach Library: The County of San Diego is soliciting proposals from pre-qualified Design-Build Entities to design and construct a new branch library in Imperial Beach. The project includes the demolition of an existing 5,100 sq ft facility and the construction of approximately 14,000 sq ft of new and remodeled space. The project has a Guaranteed Maximum Price (GMP) of $7,900,000, including LEED Gold and ZNE certifications. Technical proposals are due January 26, 2015, and price proposals are due January 29, 2015.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6719 Imperial Beach Library - Addendum 1: Addendum No. 1 dated December 5, 2014, for RFP 6719 regarding the Design-Build of the Imperial Beach Library. This document modifies the pre-proposal conference start time and location, and provides a revised schedule for proprietary meetings with specific Design-Build Entities on December 9, 2014.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for RFP 6719: Imperial Beach Library Design-Build Contract: This is a design-build contract between the County of San Diego and a Contractor for the construction of the Imperial Beach Library. The document outlines the agreement terms, including scope of design-build responsibility, payment terms, bonds, insurance, and project administration. It references RFP No. 6719 and includes a comprehensive table of contents covering technical specifications, legal provisions, and performance requirements.
PDF
PDF, Low priorityspecifications
LowAI Summary for 2013 Savings By Design Participant Handbook: The 2013 Participant Handbook outlines the policies and procedures for the Statewide Savings By Design (SBD) program, a nonresidential new construction energy efficiency program administered by PG&E, SMUD, SDG&E, and SCE. It details program eligibility, design assistance, financial incentives for whole-building and systems approaches, and key definitions for participants.
PDF
PDF, Low priorityspecifications
LowAI Summary for City of Imperial Beach General Plan & Local Coastal Plan: A comprehensive planning document for the City of Imperial Beach, updated October 2010 and adopted October 19, 1994. It serves as the city's constitution for physical development, combining the General Plan and Local Coastal Plan. The document outlines mandatory and optional elements including Circulation, Conservation, Housing, Land Use, Noise, Open Space, Safety, Design, and Facilities and Services.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy F-23: Public Art: Board of Supervisors Policy F-23 establishes guidelines for including original works of art in County-owned public buildings with construction costs of $10 million or more. It defines an artwork allowance of 0.5% of estimated project costs (up to $500,000) and outlines the selection process via a three-member committee.
PDF
PDF, Low priorityspecifications
LowAI Summary for County of San Diego Board of Supervisors Policy G-15: This document outlines Policy G-15 of the County of San Diego Board of Supervisors, which establishes general principles and design standards for the construction, improvement, and management of County-owned or leased facilities. It emphasizes green building practices, energy efficiency, LEED certification for projects over 5,000 square feet, and the integration of sustainable materials and technologies to reduce environmental impact and operational costs.
PDF
PDF, Low priorityenvironmental-reports
LowAI Summary for Imperial Beach Branch Library Project - CEQA Initial Study: A CEQA Initial Study and Environmental Checklist Form dated May 2014 (revised July 17, 2014) for the Imperial Beach Branch Library Project (Project No. 1014143). The document describes the demolition of an existing 5,000 sq ft library and construction of a new 12,000 sq ft facility, including LEED silver features and asbestos/lead abatement. It identifies the project location, land use, and required permits from the City of Imperial Beach.
PDF
PDF, Low prioritysupporting-documents
LowAI Summary for RFP 6719 Appendix F - County of San Diego Holidays: Appendix F for RFP 6719, providing a schedule of recognized holidays for the County of San Diego for the years 2014 and 2015.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFP 6719 Appendix M - Electronic Certified Payroll Q&A: A question-and-answer document from a webinar regarding the Electronic Certified Payroll Reporting (eCPR) overview. It provides guidance to contractors and awarding bodies on uploading certified payroll records, fringe benefit statements (PW-26), and handling corrections within the DIR/CMU system.
PDF
PDF, Low priority2 pages · industry-day
LowAI Summary for RFP 6719 - Design-Build Imperial Beach Library Pre-Qualification Conference Sign-in Sheet: Attendance sign-in sheets from a Pre-Qualification Conference held on December 9, 2014, for RFP 6719 regarding the Design-Build of the Imperial Beach Library.
PDF
PDF, Low priorityindustry-day
LowAI Summary for RFP 6719 Imperial Beach Library Pre-Proposal Conference Slides: Presentation slides from a December 9, 2014, pre-proposal conference for the design-build of the Imperial Beach Library for the County of San Diego. The document outlines the project scope (approx. 14,000 sq ft of construction/remodel), a GMP of $7.9M, the two-step solicitation process, and key dates for mid-course presentations, question deadlines, and final proposal submissions due in January 2015.
TXT
TXT, Low priority1 page · award
LowAI Summary for RFP 6719 - Notice of Intent to Award - Imperial Beach Library: Notice of Intent to Award dated March 19, 2015, for RFP 6719 (Design-Build Imperial Beach Library). The Department of General Services has selected T.B. Penick & Sons, Inc. as the recommended offeror. The notice will remain posted until March 26, 2015, before the final award is made.
DWG
DWG
DWG
DWG
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.