Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP 25-26-023 Architectural and Construction Management

Closed
RFP 25-26-023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia, with additional lighting and finish upgrades for Buildings 261 and 263. The comprehensive scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new vanities and lavatories, and installing raised flooring with integrated electrical distribution in classrooms. Technical upgrades involve replacing variable air volume systems, updating lighting controls and ballasts, replacing ceiling fans, and installing new fire-rated smoke doors and signage. The project is governed by a firm-fixed-price structure across three primary line items: finishings, electrical, and HVAC. The period of performance is 425 calendar days, scheduled from January 11, 2027, to March 11, 2028. Proposals are due by November 18, 2026, and will be evaluated based on price, past performance, and corporate relevant experience, with non-cost factors holding equal importance to price. Awardees must provide performance and payment bonds totaling 100 percent of the contract price and a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the facility's nature, personnel must undergo background checks via FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price for two primary exhibit line items: building renovation and paving work. Award requirements include specific bonding based on proposal value, with projects over 150 thousand dollars requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Quality control is managed through a three-phase process, and final acceptance requires a multi-stage inspection involving the Quality Control Manager and the Contracting Officer.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project is required following a fire sprinkler discharge that affected the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, and rubber wall base replacement, as well as necessary plumbing and electrical work and the replacement of vanities and cabinets. All work must adhere to strict material standards, including ASTM specifications for flooring and insulation, and comply with ADA, OSHA, EPA, and NFPA-101 life safety codes. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. This is an SBA set-aside solicitation open to various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone businesses. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must have a valid Massachusetts Contractor's License, attend a mandatory pre-bid site visit, and provide a detailed cost breakdown and a 90-day bid guarantee. The contract is subject to Davis-Bacon Act labor standards, including specific minimum wage requirements and paid sick leave provisions, with payment terms set at Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical rooms. Key technical requirements include the installation of drywall in approximately 300 square feet of mechanical room floor area and the coordination of temporary disconnection and reconnection of furnaces, water heaters, and HVAC equipment. The contractor is responsible for all labor, materials, and equipment, while ensuring occupied-building protection, dust control, and the testing of all restored mechanical, plumbing, electrical, and fire-life safety systems. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan with phasing and timelines, and itemized pricing by room and trade. Final acceptance by CSD requires the removal of all debris and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

Documents

2
PDF, High priority: read this first18 pages · rfp
High
PDF, Low prioritypre-bid-attendees
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → City of Danville
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia → City of Danville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
RFP 25-26-023 Architectural and Construction Management

More opportunities from Virginia → City of Danville

Same awarding agency

NAICS: 332323
New
SLED
IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements
Solicitation # IFB-26-27-031
The City of Danville, Virginia, issued Invitation for Bids IFB-26-27-031 for the construction of decorative guardrail and fence improvements at Riverfront Park near the Martin Luther King Jr. Memorial Bridge. The scope of work includes the installation of custom fabricated decorative guardrail systems featuring steel posts and rails with stainless steel mesh infill panels, as well as a 48-inch-high decorative welded-wire fence system including gates and concrete footings. Additional requirements involve core drilling guardrail posts with a minimum 6-inch embedment using non-shrink epoxy grout and performing site restoration, including minor grading and mulch replacement. The project must be completed within 60 consecutive calendar days from the Notice to Proceed and must adhere to OSHA and all applicable local, state, and federal safety and environmental codes. The contract will be awarded to the lowest responsible and responsive bidder, with evaluation factors including price, proposed completion time, and evidence of the bidder's practical knowledge, equipment, and financial resources. Bidders are required to provide a 5% bid bond, and the successful contractor must provide 100% performance and payment bonds. Financial terms include a 5% retainage withheld from each invoice until final acceptance. Contractors must comply with the City of Danville Procurement Code and maintain a drug-free workplace and equal employment practices. Required submissions include a Federal Tax ID, Virginia SCC registration, a City of Danville business license, and a certification that employees have not been convicted of a felony in the past seven years.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
SLED
IFB-26-27-020-FY-2027 Neighborhood Street Resurfacing Program
Solicitation # 26-27-020
The City of Danville, Virginia, is soliciting sealed bids under IFB 26-27-020 for its FY2027 Neighborhood Street Resurfacing Program. The scope of work involves asphalt concrete pavement planing and resurfacing for multiple city streets, including incidental tasks such as traffic control, shoulder renovation, and coordination with other contractors. The contract will be awarded to the lowest responsive and responsible bidder, with responsibility requiring VDOT prequalification in accordance with Section 102.01 of the VDOT Specifications. Bids must be submitted by December 3, 2026, via the eVA portal as a signed static PDF or as a sealed paper submission. The project requires strict adherence to VDOT Specifications, VDOT Standard Drawings, and the City of Danville's Standard Requirements and Instructions for Bidding Version 3.0. Awarded contractors must provide a 5% bid bond, as well as performance and labor and material bonds each totaling 100% of the contract price, within ten calendar days of receiving the contract documents. Insurance requirements include worker's compensation, comprehensive general liability, a minimum of 1,000,000 dollars in automobile liability, and an umbrella policy of at least 3,000,000 dollars. Work must commence within five calendar days of a written Notice to Proceed. The Project Manager holds final authority over the inspection and approval of all materials and work.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS