RFP 26-025 7001 East 163rd Street Roof Replacement - Belton, MO
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Belton is soliciting sealed proposals for RFP 26-025, which involves the complete removal and replacement of the roofing system at 7001 East 163rd Street. The scope of work includes installing a fully-adhered TPO membrane and replacing all membranes, insulation, flashings, and associated accessories. Additionally, the project requires the temporary removal and reinstallation of rooftop mechanical equipment, with alternate bid items available for the replacement of specific mechanical units and their associated connections. Proposals must be submitted to the Assistant City Manager/Public Works Director by 10:00 a.m. on October 2, 2026. A mandatory pre-bid meeting will be held on either September 14 or September 16, 2026, and attendance is required for bid eligibility. Submissions must include a bid bond or certified check for at least 5% of the total bid price. Contractors are required to comply with Missouri prevailing wage laws and ensure all on-site employees have completed a ten-hour OSHA construction safety program.
General Info
Agency
NAICS
Place of Performance
Belton, MO, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (9)
See All 9 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Sealed proposals will be received by the Assistant City Manager/Public Works Director of the City of Belton at the City of Belton Public Works Facility located at 700 Seabee Road, Belton, Missouri, 64012 at the Administration Building (Building A) until 10:00 a.m., local time, on October 2, 2026, at which bidding will be closed. All bids will be opened and read aloud. A late Proposal Packet is one received after 10:00 a.m., local time, at the time and place of the opening as stated. The decision as to the correct time for the openings shall be made by the Assistant City Manager/Public Works Director of the City of Belton and that decision shall be final. Proposals received after the deadline date and time will be returned unopened. It shall be the responsibility of those submitting a proposal to assure themselves that their proposal has been received by the City of Belton.
Project Description
The project shall consist of the complete removal and replacement of the existing roofing system to the top of the existing roof deck, including removal and replacement of all roof membranes, insulation, flashings, edge metal, expansion joints, transitions, penetration flashings, and associated roofing accessories. The new roofing system shall consist of a fully-adheredtpo membrane and all components necessary to provide a complete, watertight assembly.
The work shall also include the temporary removal and reinstallation of rooftop mechanical equipment as required to facilitate roofing operations, together with alternate bid items for the replacement of designated rooftop mechanical units, including all associated curbs, flashing modifications, and mechanical and electrical connections necessary for a complete and operational installation.
The specific locations of the work to be done shall be contained in the special provisions section of the bid document. The Contractor shall bid on all work.
All equipment, materials, and workmanship must be in accordance with the Specifications and other Contract Documents.
RFP documents can be seen (viewing low resolution images online is free) or purchased for a non-refundable fee online at www.drexeltech.com in their online Plan Room. For access assistance, please contact Drexel directly by phone at 913-471-4430 or by email at distribution@drexeltech.com. Information regarding this RFP can be found in the “Public Jobs” link on Drexel’s website.
A copy of the City of Belton Design and Construction Manual may be downloaded at no cost from the City’s website at https://www.belton.org/Departments/Public-Works-Department/Design-and-Construction-Manual.
A mandatory Pre-Bid Meeting will be held on September 14, 2026, at 10:00 a.m., local time, and September 16, 2026, at 10:00 a.m., local time, at the City of Belton Police Station located at 7001 East 163rd Street, Belton, Missouri 64012. Due to the importance of all bidders having a clear understanding of the specifications and scope of work requirements, bids will only be accepted from those who are represented at one of the Pre-Bid Meetings. Attendance at the Pre-Bid Meeting will be evidenced by the representative’s signature on the attendance roster.
All bids must be accompanied by a Bid Bond from a surety or certified check from a bank acceptable to the Assistant City Manager/Public Works Director in the amount equal to or greater than 5% of the maximum total bid price. Prior acceptability of the proposed surety or bank furnishing the bid security before the bid date is recommended. An unacceptable bid security may be cause for rejection of the proposal. No bidder may withdraw his bid for a period of sixty (60) days after the date of opening of bids.
Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction safety program for all employees who will be on-site at the project. The construction safety program shall include a course in construction safety and health that is approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations that is at least as stringent as an approved OSHA program as required by Section 292.675, RSMo.
All wages paid for work under this contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through 290.340, RSMo 1969, as amended.
Pursuant to 610.021 RSMo Item 12, all documents within a request for proposal will become open record to the public upon a negotiated contract being executed. All documents within a request for bid become open record as soon as the bid is opened. Bidders and proposers should be aware that all documents within a submittal will become open records.
The Owner reserves the right to reject any or all proposals and to waive informalities or deficiencies therein to negotiate with any or all bidders or others for more favorable terms or prices and to award a contract to other than the bidder submitting the lowest cost bid proposal with or without negotiation and to determine which is the lowest, best, and most responsive to accept, at its option, any alternates and to approve the bond.
On all requests and correspondence, please reference RFP Number 26-025.
Requests for information related to this RFP should be directed to:
Greg Rokos, Assistant City Manager/Public Works Director
Telephone: 816-892-1269
E-Mail: grokos@belton.org
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS