Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

RFP 26-139 - Wastewater Treatment Plant & Recycled Water Upgrades

Active
RFP-26-139State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Banning is seeking a consultant through RFP 26-139 to design and implement upgrades for its Wastewater Treatment Plant located at 2242 East Charles Street. The project aims to increase the facility's treatment capacity from 3.6 million gallons per day to approximately 4.8 million gallons per day while ensuring compliance with regional water quality control board standards. Key objectives include the removal of nitrogen and the production of Title 22 tertiary recycled water, with the infrastructure designed to support future reverse osmosis and brine management improvements. The selected consultant will leverage existing planning studies, geotechnical investigations, and preliminary engineering data to develop a treatment alternative that meets the city's current and future goals. Interested parties must submit their responses by September 18, 2026. The procurement process is managed by the Purchasing Division of the City of Banning, with Ellen Clifford serving as the primary point of contact.

General Info

City of Banning seeks consultant to upgrade wastewater plant capacity to 4.8 MGD.

Agency

California → Purchasing DivisionView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(4)

AGREEMENT_FOR_PROFESSIONAL_SERVICES_-_Sample.docx

DOCX

RFP 26-139 - Wastewater Treatment Plant _ Recycled Water Upgrades.pdf

PDF

Previous_Draft_Basis-of-Design_Report_-_For_refrence_purposes_only.pdf

PDF

Grant_Agreement_R25AP00588_ISSUED.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Purchasing Division
Contacts1 person available
OfficeBanning, CA, 92220, USA
Organization / Agency
California → Purchasing Division
View Agency Profile
Office AddressBanning, CA, 92220, USA
Contacts
Ellen CliffordPurchasing Manager

Interested Companies (45)

Show more
Entram
PORT CHARLOTTE, FL
Woodard & Curran
Tampa, FL
DXP Enterprises
Anaheim, CA

See All 45 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City owns and operates a WWTP located at 2242 East Charles Street, Banning, California 92220. The WWTP has a design treatment capacity of 3.6 million gallons per day (MGD) and currently discharges approximately 2.1 MGD into 10 unlined evaporation/percolation ponds. The treated effluent then percolates into the groundwater of the San Gorgonio Hydrologic Unit. Groundwater from this basin is used for municipal, industrial, and agricultural applications. The WWTP consists of preliminary treatment, primary treatment, secondary treatment (trickling filters), solids handling, disinfection (currently not in use), and evaporation/percolation ponds. The City's end goal is to select and construct a treatment alternative for the removal of nitrogen and the production of Title 22 recycled water that is the best fit for the City's current and future goals. The City's existing WWTP requires significant upgrades to meet the regional water quality control board's impending effluent water quality standards, increase capacity to approximately 4.8 million gallons per day (MGD), produce Title 22 tertiary recycled water, and position the facility for future reverse osmosis (RO) and brine management improvements. The City has previously completed planning studies, basis of design, preliminary engineering, surveying, geotechnical investigations, and other technical work that will be made available to the successful Consultant.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → Purchasing Division

Same awarding agency