This Solicitation opportunity from California was posted on April 12, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Contract 538433 - Boulevard Fire Station Geotechnical Evaluation: Geotechnical evaluation report prepared by Ninyo & Moore for the County of San Diego Department of General Services dated March 30, 2012. The document provides subsurface exploration findings, laboratory testing results, and engineering recommendations for the construction of a new 6,000 square-foot fire station at the SWC Ribbonwood and Manzanita Dulce Roads site.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Addendum No. 1 - Design-Build Boulevard Fire Station: Addendum No. 1 dated July 31, 2013, for RFP 5978 regarding the Design-Build Boulevard Fire Station. This document schedules the 1st Mid Course Presentations for August 5, 2013, providing specific time slots for Harper Construction Company, Erickson-Hall Construction Co., and Hunter-Steel Construction, Inc. It includes an agenda for the presentations covering design development, site logistics, and project-related issues.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Addendum No. 2 - Design-Build Boulevard Fire Station: Issued August 6, 2013, this addendum modifies RFP 5978 for the Design-Build Boulevard Fire Station. It schedules the 2nd Mid Course Presentations for August 20, 2013, clarifies owner-furnished FF&E, specifies Type-V non-rated construction without seismic upgrades, allows for the potential deletion of the fitness room, and provides revisions regarding hardware and insulation requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Addendum No. 3 - Design-Build Boulevard Fire Station: Addendum No. 3 dated August 15, 2013, for RFP 5978 regarding the Design-Build Boulevard Fire Station. It establishes a new proposal due date of September 4, 2013, extends the question deadline to August 22, 2013, and outlines the schedule for proposal presentations on September 9, 2013, for Harper Construction Company, Inc. and Hunter-Steel Construction, Inc.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Addendum No. 4 - Boulevard Fire Station: Addendum No. 4 for RFP 5978 regarding the Design-Build of the Boulevard Fire Station. This document provides critical revisions to performance specifications (flagpole, lockers, interior finishes) and removes the LEED Silver Certification requirement. It also includes 21 detailed clarifications concerning site design, parking, water well infrastructure, building codes, and apparatus bay clearances.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Addendum No. 6 - Design-Build Boulevard Fire Station: Addendum No. 6 dated August 30, 2013, for RFP 5978 regarding the Design-Build Boulevard Fire Station. It establishes a new Price Proposal due date of September 9, 2013, updates performance specifications to include 24 turnout gear lockers in the base contract, and clarifies that costs for telephone/cable wire height adjustments on Ribbonwood Road should be excluded from the proposal.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 5978 Design-Build Boulevard Fire Station: Issued July 22, 2013, by the County of San Diego Department of General Services, this Request for Proposals (RFP) seeks a pre-qualified Design-Build Entity to design and construct a new 7,500 sq ft fire station in Boulevard, California. The project includes an apparatus bay, accessory building, and roadway improvements, with a Guaranteed Maximum Price (GMP) of $2,900,000. Proposals are due August 26, 2013.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5978 Design-Build Boulevard Fire Station - Addendum No. 5: Addendum No. 5 dated August 27, 2013, for RFP 5978 regarding the Design-Build Boulevard Fire Station. This document provides critical revisions to the RFP and Attachment B Performance Specifications, including new requirements for oil/water separators, power distribution, stand-by generators, well water filtration, and specific equipment for report writing and bunk rooms. It also modifies technical specifications for building codes, indoor air quality, and substructure performance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S24236 - Boulevard Fire Station Architectural Program and Basis of Design: This document provides the architectural program and basis of design for a new approximately 7,500 square foot fire station. It details construction standards, space allocations for County Fire and Cal Fire, functional relationships for emergency response efficiency, parking requirements, and special systems including vehicle exhaust removal and SCBA fill stations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S24237 Attachment B - Performance Specifications: This document provides the performance specifications for the construction of a Fire Station facility in San Diego County, California. It outlines the program summary, required interior and exterior spaces, facility performance standards, building codes (including Essential Facilities Requirements), environmentally responsible design goals, and specific thermal, health, and safety requirements.
PDF
PDF, High priority: read this firstsow
HighAI Summary for S24242 RFP Attachment G - Boundary and Topographical Surveys: Attachment G of RFP S24242, providing technical specifications and requirements for boundary and topographical surveys.
PDF
PDF, Low priorityspecifications
LowAI Summary for 2012 Spring Rare Plant Survey Report - Boulevard Fire Station: A biological survey report dated May 14, 2012, prepared by RBF Consulting for the County of San Diego. The document details a focused rare plant survey conducted on April 10, 2012, to comply with Mitigation Measure Bio 2 of the Final Mitigated Negative Declaration for the Boulevard Fire Station project. It identifies the presence of Jacumba milkvetch and desert beauty, and notes a snake cholla within the development footprint.
PDF
PDF, Low priorityspecifications
LowAI Summary for Boulevard Fire Station Hydrogeologic Site Reconnaissance Report: A hydrogeologic site reconnaissance report prepared by Ninyo & Moore for PMC, dated July 15, 2011 (revised July 22, 2011). The document provides preliminary findings, conclusions, and recommendations regarding the geology and hydrogeologic conditions for the proposed Boulevard Fire Station site in San Diego County, California, including analysis of regional settings, site geology, and faulting.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for Boulevard Fire Station - Mitigated Negative Declaration: A CEQA Initial Study and Environmental Checklist dated December 2, 2011, for the Boulevard Fire Station project in San Diego County. The document describes the proposed construction of a 5,000-6,000 sq ft fire station and concludes that a Mitigated Negative Declaration will be prepared as the project's environmental effects can be reduced to less than significant.
PDF
PDF, Low priorityspecifications
LowAI Summary for County of San Diego Board of Supervisors Policy G-15: Board of Supervisors Policy G-15 establishes general principles and design standards for the construction and improvement of County of San Diego facilities. It emphasizes green building practices, LEED certification for projects over 5,000 square feet, energy efficiency, resource conservation, and the creation of safe, healthy, and accessible environments.
PDF
PDF, Low prioritypre-proposal-conference
LowAI Summary for RFP 5978 Boulevard Fire Station Pre-Proposal Conference: Presentation slides from the July 25, 2013, pre-proposal conference for the design-build of the Boulevard Fire Station for the County of San Diego. The document outlines the project scope (approx. 7,500 sf station), a GMP of $2.9 million, the two-step solicitation process, and the schedule for mid-course presentations and final proposal submissions due August 26, 2013.
TXT
TXT, Low priority1 page · award
LowAI Summary for RFP 5978 - Notice of Intent to Award - Boulevard Fire Station: Notice of Intent to Award dated October 25, 2013, for RFP 5978 (Design-Build Boulevard Fire Station) issued by the Department of General Services. Hunter Steel Construction, Inc. has been identified as the selected offeror. The notice specifies a five-day posting period from October 25 to October 31, 2013, during which no award will be made.
PDF
PDF, Low priorityother
LowAI Summary for RFP 5978 Pre-proposal Conference Sign-in Sheet: A sign-in sheet for a pre-proposal conference related to RFP 5978, containing a table for attendee names, company names, emails, and phone numbers.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFSQ 5978 - Revised Notice of Qualified Firms (Boulevard Fire Station): Revised notice dated July 15, 2013, regarding the pre-qualification for the Boulevard Fire Station Design-Build project (RFSQ 5978). The document updates the committee report regarding comparable projects narrative and scoring for two entities, though the final list of three qualified firms (Erickson-Hall Construction Co., Harper Construction Company, Inc., and Hunter-Steel Construction Inc.) remains unchanged.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.