Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kentucky was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP-605-2600000371-3 | Electric Vehicle Charging Program RFP 4

Closed
RFP-605-2600000371-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Kentucky Transportation Cabinet Division of Planning is soliciting proposals for an Electric Vehicle Charging Program under RFP-605-2600000371-3, with a response deadline of July 13, 2026, at 3:00 PM Eastern Time. This solicitation is open to all eligible entities and is intended to advance the development and deployment of electric vehicle infrastructure across the state of Kentucky. Proposals must be submitted through the Kentucky VSS portal at the provided link, and all responses are expected to align with the state’s broader goals for sustainable transportation and reduced emissions. The program will focus on creating a coordinated, accessible, and resilient public charging network that supports electric vehicle adoption statewide. Point of contact for questions and submissions is Laura Hagan, who can be reached via phone or email, with additional support available through the Division of Planning and Division of Purchases. The place of performance is statewide, with no specific location restricted, and the procurement is classified under a SLED-type organization, indicating it is intended for state, local, or educational entities. Interested parties should ensure their submissions meet all technical and compliance requirements outlined in the solicitation, as failure to do so may result in disqualification. The opportunity reflects Kentucky’s strategic investment in modernizing transportation infrastructure to meet evolving environmental and mobility needs.

General Info

Kentucky seeks proposals for statewide EV charging infrastructure by July 13, 2026, to support sustainable transportation.

Documents

19

KYTC NEVI Program Attachment 6 - Site Host Owner Letter of Intent v10 20260428

DOWNLOAD, High priority: read this firstattachment
High

KYTC NEVI Program Round 4 Request for Proposal May 29, 2026

DOWNLOAD, High priority: read this firstrfp
High

KYTC NEVI RFP 4 Q&A Revision 1 062626

PDF, High priority: read this firstq-and-a
High

KYTC RFP 4 Attachment 01 Technical Requirements v10 20260428

DOWNLOAD, High priority: read this firstsow
High

KYTC RFP 4 Attachment 02 Scope of Work v10 20260428

DOWNLOAD, High priority: read this firstsow
High

KYTC RFP 4 Attachment 05 Cost Proposal Form v10 20260428

DOWNLOAD, High priority: read this firstcost-proposal
High

KYTC RFP 4 Attachment 07 Draft Project Agreement v10 20260428

DOWNLOAD, High priority: read this firstcontract-document
High

KYTC RFP 4 Attachment 08 FHWA Form 1273 Acknowledgement

DOWNLOAD, High priority: read this firstcontract-document
High

KYTC RFP 4 Attachment 09 Wage Rates v10 20260429

DOWNLOAD, High priority: read this firstwage-determination
High

KYTC RFP Attachment 04b Proposed Project Schedule v10

DOWNLOAD, High priority: read this firstproposed-project-schedule
High

KYTC RFP Attachment 11 Utility Data Request Form v10 20260428

DOWNLOAD, High priority: read this firstutility-data-request-form
High

KYTC RFP Attachment 12 Transmittal Letter Requirements v10 20260428

DOWNLOAD, High priority: read this firstsow
High

KYTC RFP Attachment 3a Administrative Proposal Form v10 20260428

DOWNLOAD, High priority: read this firstadministrative-proposal-form
High

KYTC RFP Attachment 4a Technical Proposal Form v10 20260428

DOWNLOAD, High priority: read this firsttechnical-proposal-form
High

Modification 3 to Electric Vehicle Charging Program RFP 4

PDF, High priority: read this firstamendment
High

RFP 605 2600000371 Electric Vehicle Charging Program RFP 4

DOWNLOAD, High priority: read this firstrfp
High

RFP 605 Electric Vehicle Charging Program Modification 2

DOWNLOAD, High priority: read this firstamendment
High

KYTC Affidavit for Bidders and Offerors v10 20260320

DOWNLOAD, Low priorityaffidavit
Low

KYTC RFP Attachment 10 Example Irrevocable Letter of Credit

DOWNLOAD, Low priorityexample-letter-of-credit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → KYTC-Div of Planning
Contacts3 people available
OfficeOther, KY, USA
Office AddressOther, KY, USA
Contacts
KYTC-Div of Planning
KYTC Division of Purchases

Full Description

Show more
Electric Vehicle Charging Program RFP 4

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS