Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFQ (LAVC) - Central Plant Improvement & Hydronic Line Replacement

Closed
CS-26-13-VState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
Federal
Retamal Dam Buoy System
Solicitation # 191BWC26R0006
The International Boundary and Water Commission (IBWC) is soliciting a firm-fixed-price design-build contract for the Retamal Dam Buoy System in Hidalgo County, Texas. The project aims to establish a new waterway barrier line featuring anchors, an alert system, and warning signs to prevent public access to dangerous hydraulics and reduce structural impacts from debris. The scope is divided into two phases: the preparation of design documents and the subsequent construction and commissioning of the system. The estimated project magnitude is between 5 million and 10 million dollars, with a total performance period of 485 calendar days from the notice to proceed. The procurement follows a two-phase design-build selection procedure under FAR Subpart 36.3, where award is based on a rational tradeoff between cost and non-price evaluation factors, including technical plans, past performance, and financial condition. Bidders must meet strict qualification requirements, including the submission of IBWC Form 245 and evidence of professional licensure for design engineers. Site access is restricted to specific working hours, and contractors must coordinate with Border Patrol and avoid US Fish and Wildlife property. Proposals must be submitted exclusively via a secure SharePoint portal by the extended deadline of September 16, 2026.
Internat Boundary And Water Commission

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Federal
Forest wide Decommissioning, Gunnison National Forest Colorado
Solicitation # 1240LT26Q0177
Solicitation 1240LT26Q0177 is a sealed bid for the removal of unusable structures and the decommissioning of water wells within the Grand Mesa, Uncompahgre, and Gunnison National Forests in Colorado. The scope of work is concentrated at three specific sites: the removal of a toilet building and sewer tank at Ward Lake Campground in Delta County, the abandonment of a water well at Lakeview Campground in Gunnison County, and the abandonment of a water well and removal of a concrete water tank at Beaver Lake Campground in Gunnison County. All work must comply with the Code of Colorado Regulations for water well construction and abandonment. The project is a 100 percent total small business set-aside under NAICS 237990, with a performance period scheduled from October 15, 2026, through June 15, 2027. The contract is awarded based on best value, evaluating price and a technical approach that must include a construction schedule such as a Gantt chart. Awardees are required to provide payment protections, such as payment bonds or an irrevocable letter of credit, covering 100 percent of the contract price for the duration of the performance period plus one year. Labor is subject to the Davis-Bacon Act and specific wage determinations for Colorado heavy construction. Quotes must be submitted via email to Jordan Carlsen by September 22, 2026, at 14:00 EST, and must include a technical narrative of one to three pages and pricing submitted on the provided Excel schedule of items.
Csa Intermountain 8 Usda-Fs

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Central Plant Improvement project aims to enhance the campus cooling infrastructure by upgrading the Central Utility Plant to increase cooling capacity. This involves replacing the existing 1000-ton centrifugal chiller with expanded capabilities, decommissioning and demolishing the solar thermal storage tanks and ice storage system, and draining the solar thermal system. New chilled water pumps will be installed to support higher demand, while condenser pumps and portions of the condenser piping will be replaced to optimize performance of the existing cooling towers. The project also includes broad modernization efforts to bring the facility into compliance with current codes and standards, encompassing life safety system enhancements, improved acoustics in the CUP office, and necessary structural upgrades to the building. Simultaneously, the Hydronic Line Replacement project will comprehensively replace all chilled water and hot water distribution piping across campus using a phased construction approach to minimize disruptions. The existing piping, mostly routed through an underground tunnel system with some direct-buried segments, will be removed and replaced in coordination with the latest plans for infrastructure work referenced as 40J-829.02. A specific section of piping that has repeatedly failed will be prioritized for replacement under a separate scope. Alongside piping replacement, minor repairs to the tunnel infrastructure and an upgrade of tunnel lighting to LED fixtures are included. Any areas of landscaping disturbed by excavation for direct-buried piping will be restored to match the original condition. Both projects are solicited under RFQ CS-26-13-V by the Los Angeles Community College District, with responses due by August 12, 2026.

General Info

Upgrade central cooling plant, replace piping campus-wide, modernize systems, comply with codes, minimize disruptions.

Agency

California → Contracts Department of Los Angeles Community College DistrictView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

1055 Corporate Center Drive 5th Floor Monterey Park, California 91754, CA, USA

Set-Aside

NONE

Documents

(14)

Applicant Declaration for Los Angeles Valley College Central Plant Improvement SOQ

PDFapplicant-declaration

Acknowledgement of Addenda for LA Valley College RFQ

PDFacknowledgement-of-addenda

SOQ Responsiveness Check List Attachment 8

PDFchecklist

Non-Discrimination Declaration for District Services

PDFnon-discrimination-declaration

Conflict of Interest Certification for LA Valley College Project

PDFconflict-of-interest-certification

Pre-SOQ Presentation_Central Plant 7-15-26.pptx

PPTX

DIR Pre-Qualification Questionnaire for Design-Build Services at Los Angeles Valley College

PDFqualification-questionnaire

BuildLACCD Vendor Code of Conduct

PDFvendor-code-of-conduct

RFQ Document Chart for Two-Step Design-Build Procurement

PDFrfq

RFQ Design Build Services Central Plant Improvement & Hydronic Line Replacement CS-26-13-V

PDFrfq

PP-04-09 Bid Protests and Appeals Procedures

PDFspecial-notice

Levine Act Campaign Contribution Notice Acknowledgment

PDFspecial-notice

Authorization To Release Information - Los Angeles Valley College Project

PDFauthorization-to-release-information

Non-Collusion Declaration for Los Angeles Valley College Central Plant Improvement

PDFnon-collusion-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Contracts Department of Los Angeles Community College District
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Contracts Department of Los Angeles Community College District
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: Project 1 – Central Plant Improvement
CUP Upgrade: The Central Utility Plant (CUP) Upgrade includes increasing cooling capacity. The current CUP utilizes a 1000-ton centrifugal chiller as well as a chilled water thermal energy storage tank to serve the campus cooling loads. The solar thermal storage tanks and ice storage system will be demolished. The current solar thermal system will be drained and decommissioned. The chilled water pumps will be replaced to supply the added capacity. The condenser pumps and portions of the condenser piping will be replaced to maximize the capacity of the existing cooling towers. Finally, this project will include upgrades to the CUP to meet current codes and standards, including life safety systems, improved acoustical performance of the CUP office, and building structural upgrades.
Project 2 – Hydronic Line Replacement
Hydronic Line Replacement: The goal of the Hydronics Infrastructure Upgrade project is to replace the entirety of the chilled water and hot water distribution piping. A phased approach will be utilized including the use of temporary heating and cooling equipment to minimize building shutdowns and system outages during construction. The existing distribution system is located primarily within an underground tunnel system with some portions of direct buried piping. During the design of the PPC, a segment of the chilled water piping failed multiple times. As a result, this segment will be replaced under a separate scope of work. The DBE shall coordinate with the latest plans or scope of work for 40J-829.02 Infrastructure – Hydronic Line Replacement. In addition to replacing piping, minor tunnel repairs will be completed, and tunnel lighting will be upgraded to LED fixtures. Areas of direct-buried disturbed by piping replacement will be landscaped to match the existing condition.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS