Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage Basin and Utility Modification

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the 25-foot-wide concrete San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. The project also encompasses the delivery of full electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a Disadvantaged Business Enterprise set-aside. Interested parties should coordinate with the primary point of contact, Andrew Burk, regarding the submission requirements.
Granite Construction Company

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237990
New
SLED
6893
Solicitation # 49749
The Massachusetts Port Authority is soliciting proposals for the advance procurement, furnishing, and delivery of aviation electrical equipment for Logan International Airport in Boston, Massachusetts. The scope of work specifically requires the provision of L-868 Class IB stainless steel light bases (Size B, 12-inch diameter), as well as extensions, spacer rings, and 3/4-inch thick high-tensile machine steel flange rings with pavement dams. All equipment must comply with FAA Advisory Circulars 150/5345-53D and 150/5345-42K. Deliveries must be made to the Massport Central Stockroom no later than February 1, 2027, with a requirement for the supplier to provide at least seven calendar days of advance notice prior to shipment. Award selection is based on the best interest of the Authority, focusing on the responsiveness, capability, and responsibility of the proposer rather than solely on the lowest cost. As an Airport Improvement Program project, the contract is subject to extensive federal regulations, including Buy American preferences, Davis-Bacon wage requirements, and Civil Rights Title VI nondiscrimination assurances. Additionally, contractors must adhere to the Occupational Safety and Health Act of 1970, the Federal Fair Labor Standards Act, and specific prohibitions regarding certain telecommunications and video surveillance equipment. Proposers are required to submit unit pricing via Bid Express and provide necessary certifications regarding tax delinquency and felony convictions.
Massachusetts Port Authority - Goods & Services

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
Gonyea Playfield
Solicitation # 2026-MPW-244
The Gonyea Playfield project, solicitation number 2026-MPW-244, is a community park improvement initiative for Pierce County Parks and Recreation in Parkland, Washington. The scope of work includes the construction of an inclusive play area, a nature play area, basketball courts, a perimeter loop path, flexible lawn areas, and a comfort station. Additional requirements involve stormwater management, utility and right-of-way improvements, site furnishings, signage, and landscape enhancements. The project is estimated at 3,390,000 dollars for the base bid and 1,385,000 dollars for additive alternates, which include a picnic shelter, skate spot, roly poly, site irrigation/trees, and right-of-way work. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bids were due by November 18, 2026, and must have been submitted via the OpenGov Procurement Portal with a 5 percent bid bond. The successful contractor is required to provide a 100 percent payment and performance bond. Performance timelines mandate substantial completion of all base and alternate bid work within 275 calendar days of the Notice to Proceed, with final completion and acceptance required within a total of 305 calendar days. Compliance requirements include adhering to Washington State prevailing wage laws and ensuring that at least 15 percent of labor hours are performed by apprentices. The contractor must follow strict safety and environmental protocols, including the Pierce County Hot Work Procedure, ADA requirements for walkways, and specific hazardous material handling and disposal procedures for asbestos, lead, PCBs, and mercury. Quality assurance is managed through a mandatory testing and inspection program, with the contractor providing three days' notice to the County before work is ready for inspection.
Parks and Recreation

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 10 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
2027 Mass Trails Grants
Solicitation # BD-27-1020-DCRCU-DC250-135070
The Department of Conservation and Recreation is offering grant funding through the 2027 MassTrails Grant Program to support the planning, design, engineering, permitting, construction, and maintenance of off-road linear corridors in Massachusetts. Eligible applicants include municipalities, non-profit organizations, state and federally recognized Native nations, and state and federal agencies. Funding is available for Recreational Trail Program projects, ranging from 5,000 to 100,000 dollars, and regional shared-use path projects, which may receive up to 500,000 dollars. Projects must be completed within a one- to two-year contract period, with start dates beginning July 1 for state-funded grants and October 1 for federally funded grants. Applications must be submitted online by February 2, 2027, and are evaluated based on connectivity, equity, accessibility, efficiency, readiness, safety, and the quality of the recreational experience. The award process involves review by the Inter-Agency MassTrails Team or the Massachusetts Recreational Trails Advisory Board, with final approval from the Secretary and the Governor. Grantees must operate on a reimbursement basis, paying 100 percent of costs before requesting funds. Compliance with the Build America, Buy America Act, the FAST Act, the 2018 Environmental Bond Bill, and various civil rights and accessibility guidelines, including the ADA and Forest Service Trail Accessibility Guidelines, is mandatory.
Department of Conservation and Recreation

POSTED

about 11 hours ago

DEADLINE

in 3 months

AI Contract Overview

Show more

This subcontract for the Nipomo Community Services District involves the installation of storm drain infrastructure and the modification of site utilities at water tank site projects in Nipomo, California. The scope of work includes installing a drainage basin, discharge piping, and storm drain piping, as well as lowering existing utility lines to ensure a fully functional system. The project requires the contractor to be registered with the DIR and strictly comply with California prevailing wage laws. Interested parties must submit their responses by September 22, 2026, for this project categorized under NAICS code 237990.

General Info

Subcontract for storm drain and utility installation in Nipomo, California by September 22, 2026.

Documents

This scope was carved out of 20260917025.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Foothill Water Tank Site Grading Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Nipomo Community Services District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs storm drain infrastructure and modifies site utilities for prime contractors on Nipomo Community Services District water tank site projects. Installs a drainage basin, discharge piping, and storm drain piping, and performs the lowering of existing utilities. Requires DIR Registration and compliance with California prevailing wage laws. Delivers a functional storm drain system and lowered utility lines.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS