This Solicitation opportunity from Texas was posted on October 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The University of Texas at Austin is seeking proposals from qualified Construction Manager-at-Risk firms for the renovation of Floors 7 and 8 of the Ernest Cockrell Jr. Hall, with a project budget capped at $24 million. The solicitation, identified as RFP-CMR1576-250005, emphasizes a best value selection process and requires comprehensive submissions that demonstrate expertise in construction safety, past performance, budget management, scheduling, and warranty support. The project aims to modernize and upgrade the specified floors, with key dates including a proposal response deadline of November 10, 2025, and a pre-submittal conference and site tour scheduled prior to that. Respondents are instructed to follow detailed submission guidelines, including file formats, technical requirements, and deadlines, to ensure compliance and competitiveness.
The RFP package provides extensive instructions for proposal preparation, evaluation criteria, and the overall project scope, emphasizing transparency and thoroughness in the selection process. The procurement process is structured to identify a construction management firm that can deliver quality work within the established budget and schedule, supporting the university’s infrastructure development goals. The contract will be managed through a formal electronic submission portal, with support contact available for technical assistance. This initiative reflects the university’s commitment to leveraging competitive bidding to secure a highly qualified construction partner for this significant renovation project.
HighAI Summary for Addenda Acknowledgement Form - UT Austin: A formal acknowledgement form for proposers to certify receipt of addenda issued by The University of Texas at Austin in response to an RFP.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Appendix 2 Exhibit H - Policy on HUB: This document outlines the University of Texas at Austin's policy regarding Historically Underutilized Businesses (HUB) for Construction Manager at Risk (CMR) and Competitive Sealed Proposal (CSP) procurements. It defines HUB eligibility, lists statewide utilization goals, and provides mandatory instructions for the Electronic HUB Subcontracting Plan (E-HSP). Failure to include an E-HSP results in rejection of the response. It details the 'good-faith effort' requirements, including notification protocols via B2Gnow and the use of the Centralized Master Bidders List (CMBL).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix 4: Design Development Document Request: A supporting document titled 'Appendix 4: Design Development Document Request' outlining the requirements for design development documentation.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Attachment A: Prevailing Wage Determination - Austin Area: Issued by The University of Texas System Office of Capital Projects on June 25, 2020, this document specifies the prevailing wage rates for various building and exterior improvement trade classifications in the Austin area. It includes a detailed rate table and eleven explanatory notes regarding worker classification and wage requirements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP-CMR1576-250005 Ernest Cockrell Jr. Hall Renovation, Floors 7 and 8: Request for Proposals (RFP) issued by The University of Texas at Austin to select a Construction Manager-at-Risk (CMAR) firm for the renovation of floors 7 and 8 of Ernest Cockrell Jr. Hall. The document outlines the submission process, evaluation criteria based on 'best value,' and a detailed solicitation schedule with a proposal deadline of November 10, 2025.
PDF
PDF, High priority: read this first31 pages · rfp
HighAI Summary for RFP-CMR1576-250005 Ernest Cockrell Jr. Hall Renovation, Floors 7 and 8: This document is a Request for Proposals (RFP) issued by The University of Texas at Austin for the Construction Manager-at-Risk services for the Ernest Cockrell Jr. Hall Renovation, Floors 7 and 8, Project No: 102-1576. The RFP number is RFP-CMR1576-250005, with proposals and electronic HUB subcontracting plan submissions due by November 10, 2025, at 2:30 PM. The document includes general information, submission requirements, evaluation criteria, project scope, schedule, and instructions for respondents. It outlines the solicitation schedule, including pre-submittal conference, site tour, question deadlines, and public opening details. The RFP aims to select a Construction Manager at Risk firm through a one-step process based on best value evaluation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00 73 16 - Project Insurance Requirements: This document outlines the project insurance requirements, specifically detailing the Owner Controlled Insurance Program (OCIP). It defines the roles of the OCIP Administrator and Loss Control Representative and specifies the coverage provided by the Owner, including Workers' Compensation, Employer's Liability, Commercial General Liability, and Builder's Risk insurance, including specific policy limits and deductibles.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 00 - Construction Progress Documentation: Technical specification document from The University of Texas at Austin Design and Construction Standards (DCS) regarding Construction Progress Documentation. The document defines key scheduling terminology (CPM, Baseline Schedule, Total Float, etc.) and establishes the purpose and requirements for project planning and scheduling to ensure timely completion of work. Latest revision date noted as 1/22/2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 35 23 Project Safety Requirements - CIP: Technical specification document from The University of Texas at Austin detailing project safety requirements for Capital Improvement Projects (CIP). The document establishes safety management roles (OSR, PSC, PSA, SSR), defines 'Qualified' and 'Competent' personnel per OSHA standards, and mandates adherence to safety protocols that exceed OSHA requirements. Last updated September 1, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 45 00 - Project Quality Control: Technical specification document from the University of Texas at Austin Office of Campus Planning regarding Project Quality Control (Section 01 45 00). Revised as of November 30, 2023, it outlines administrative and procedural requirements for contractor quality control, quality assurance, testing agency qualifications, and inspection protocols for renovation and new construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 77 00 - Project Closeout Procedures: This document outlines the technical specifications and administrative requirements for project closeout for University of Texas System Building Construction Contracts. It details the criteria for substantial completion, final acceptance, the release of retainage, and the required record documents, including as-built drawings, O&M manuals, and final lien releases.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 10 14 16.11 Cast Bronze Dedicatory Building Plaque: Technical specification document from The University of Texas at Austin for the furnishing and installation of a cast bronze (or aluminum) dedicatory building plaque. The document details material requirements (85-5-5-5 bronze alloy or aluminum 356.1), dimensions (36x24 inches), finish requirements, and installation procedures. It includes a revision history with the latest update dated 9/1/2025.
PDF
PDF, High priority: read this first6 pages · other
HighAI Summary for Submission Instructions for RFP-CMR1576-250005: This document provides detailed submission instructions for suppliers responding to RFP-CMR1576-250005. It outlines the required information and file types for various evaluation criteria including construction safety risk management, past performance, budget control, schedules, and warranty programs. The instructions specify file formats, number of files, and data types required for submission. It includes important dates such as the intent to bid deadline (Nov 10, 2025, 2:30 PM CST) and question period (Oct 20-24, 2025). The document also provides the submission portal URL, technical requirements, and contact information for support. The maximum upload size is 1000 MB, and respondents are advised to prepare responses within character limits. This guidance is essential for compliant and timely proposal submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for University of Texas System 2013 Uniform General Conditions: Standardized general conditions for University of Texas System building construction contracts, revised 12/16/2024. The document establishes the legal and operational framework for construction projects, including definitions of key terms (e.g., Contract Sum, Baseline Schedule, Design-Build), roles of the Architect/Engineer, and administrative procedures for payments, changes, and project completion.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for University of Texas System - Construction Manager-at-Risk Sample Draft Agreement: A sample draft agreement between the Board of Regents of The University of Texas System and a Construction Manager-at-Risk. Revised September 1, 2025, the document outlines the scope of work, pre-construction and construction phase services, payment terms, and the Guaranteed Maximum Price (GMP) structure. It includes detailed articles on compensation, direct construction costs, and a comprehensive list of exhibits ranging from general conditions to BIM processes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UT Austin Capital Projects - Owner's Special Conditions: This document outlines the Owner's Special Conditions for capital projects at the University of Texas at Austin. It supplements the Uniform General Conditions (UGC) and provides specific requirements regarding the Owner's Designated Representative (ODR), prevailing wage rate determinations for Travis County, cash allowances, site restrictions (animals/livestock), and requirements for temporary field offices and project fencing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UT Austin Design and Construction Standards Website Notice: A guidance document dated February 1, 2025, directing architect/engineer teams to the UT Austin Design and Construction Standards website. It mandates that standards be downloaded at the time of Agreement execution and requires coordination with the PDC Project Manager regarding any updates to the standards during the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UT Austin Section 01 31 00 Project Administration - CIP: Technical specification document from the University of Texas at Austin Design and Construction Standards (DCS) regarding Project Administration for Capital Improvement Projects (CIP). The document defines roles, related documents, substantial completion terms, and detailed procurement strategies for subcontracts under Construction Manager at Risk (CMAR) and Design-Build (DB) agreements, including competitive bidding requirements and HUB utilization.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UT Austin Section 01 57 23 - Temporary Storm Water Pollution Control: Technical specification document from the University of Texas at Austin Design and Construction Standards (DCS) regarding Temporary Storm Water Pollution Control. It defines requirements for Best Management Practices (BMP), TPDES permits, and Storm Water Pollution Prevention Plans (SWPPP) for construction activities based on land disturbance size. The document outlines contractor responsibilities for regulatory compliance, filing notices (NOI/NOT), and site signage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UT Austin Section 01 91 00 - General Commissioning Requirements: Technical specification document from the University of Texas at Austin Design and Construction Standards (DCS), revised February 28, 2023. It outlines the general requirements for the commissioning (Cx) process for new construction and renovation projects, including the role of the Commissioning Provider (CxA), systems to be commissioned (HVAC, BAS, electrical, building envelope, etc.), and adherence to ASHRAE and LEED standards.
PDF
PDF, Low priorityother
LowAI Summary for Appendix Three: Certificate of Interested Parties (Form 1295): A sample Texas Ethics Commission Form 1295 (Certificate of Interested Parties) provided as Appendix Three. It instructs contractors on the electronic filing requirements via the Texas Ethics Commission website and the submission process to the University.
DOCX
DOCX, Low prioritybond-form
LowAI Summary for Exhibit E - Security Bond: A template for a Security Bond (Exhibit E) used by The Board of Regents of The University of Texas System. The document ensures that the Principal provides Performance and Payment Bonds upon execution of a Guaranteed Maximum Price (GMP) Proposal, or otherwise pays the difference if the project is contracted to another party at a higher cost.
The University of Texas at Austin (Owner) is soliciting proposals (Proposals) for the selection of a Construction Manager-at-Risk for Campus Construction (CC) RFP-CMR1576-250005 Ernest Cockrell Jr. Hall Renovation, Floors 7 and 8 (Project), in accordance with the terms, conditions, and requirements set forth in this Request for Proposals (RFP). The Construction Cost Limitation (CCL) for the Project is $24,000,000.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award