Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on September 17, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP GK021120 Seismic Safety & Modernization CM/GC Services

Closed
GK021120Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia, with potential associated upgrades to Buildings 261 and 263. The scope of work includes comprehensive interior finishes such as replacing corridor and classroom flooring with LVP and carpet tiles, repainting walls to a level 4 finish, and updating signage. Technical upgrades involve renovating restrooms with new vanities and lavatories, installing raised flooring with integrated electrical distribution in classrooms, and replacing variable air volume systems and lighting controls. The project is a Firm Fixed Price contract with a performance period of 425 calendar days, scheduled from January 11, 2027, to March 11, 2028. Award will be determined using a best suited then negotiate methodology, evaluating past performance from the last five years, corporate relevant experience, and price fairness. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the facility's nature, personnel must undergo background checks, including FBI fingerprinting and DHS non-disclosure agreements, and comply with strict security and safety protocols. Proposals must be submitted by November 18, 2026, and include a detailed cost breakdown via Exhibit A, signed Standard Form 1442, and required past performance questionnaires.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new modified bitumen roofing, and interior reconfiguration. Key technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price. Depending on the proposal value, bonding requirements may include bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Contractor deliverables include a comprehensive Quality Control Plan, operation and maintenance manuals, and a 20-year no dollar limit warranty on specific roofing labor and materials.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under the Recharge Master Plan Update. The solicitation is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The response deadline for this opportunity is November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to comprehensive Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical mandates include providing proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day prior to the bid opening. Additionally, bidders must submit evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA) within their bid package. While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, all other GFE certifications must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Bidding is open to various small business designations and covers a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive bid documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, following a fire sprinkler discharge. The project requires the full restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring and rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory pre-bid site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with the latest Wage Rate decisions. Administrative requirements include Net 30 payment terms and a one-year guarantee of workmanship upon substantial completion. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Grafton Job Corps

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting, along with the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Financial requirements include providing payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate, all due within ten days of award. The contractor is responsible for all testing of restored mechanical, plumbing, electrical, and life-safety systems, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is scheduled to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. The infrastructure scope covers primary and secondary electrical distribution, telecommunications, outside lighting, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and access necessary documentation.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in about 11 hours

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Berkeley, CA, 94720-8099, USA

Set-Aside

LAS

Documents

19

GK021120 Representation & Certification Form

DOCX, High priority: read this first4 pages · q-and-a
High

LBNL SSM 3B – THUP B Structural Calculations (Aug. 3, 2020)

PDF, High priority: read this first124 pages · sow
High

LBNL SSM B Building 48 Seismic Upgrade Preliminary Design

PDF, High priority: read this first6 pages · sow
High

RFP GK021120 Addendum 1

PDF, High priority: read this first240 pages · amendment
High

RFP GK021120 - CM-GC Services for SSM Project

PDF, High priority: read this first23 pages · rfp
High

RFP GK021120 Fixed Price Proposal Form

PDF, High priority: read this first7 pages · rfp
High

RFP GKO21120 Addendum No. 2

PDF, High priority: read this first1 page · amendment
High

RFP No. GKO21120 Addendum No. 3

PDF, High priority: read this first4 pages · amendment
High

RFP No. GKO21120 Addendum No. 4

PDF, High priority: read this first1 page · amendment
High

SSM IMS Full Schedule - Seismic Safety and Modernization Project

PDF, High priority: read this first21 pages · schedule
High

SSM Mechanical Calculations – 100% 3A / 50% 3B Submittal

PDF, High priority: read this first290 pages · sow
High

Transit Hub & Utilities Project Preliminary Design Report

PDF, High priority: read this first42 pages · sow
High

Construction Subcontract No. 7###### – SSM CM-GC Sample

PDF, Low priority441 pages · contract-document
Low

SSM IMS Critical Path schedule

PDF, Low priority3 pages · other
Low

20200803+LBNL+SSM-THUP+A+100pPD+Drawings.pdf

PDF

20200803+LBNL+SSM-THUP+B+B48+50pPD+Struct+Calcs.pdf

PDF

20200803+LBNL+SSM-THUP+B+WC+50pPD+Drawings.pdf

PDF

LBNL+SSM+PDR+r0-1.pdf

PDF

SSM+CMGC+bid+conference+-+8-25-2020.pptx

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 14, 2020 to Sep 28, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Berkeley National Labor - DOE Contractor
Contacts1 person available
OfficeBerkeley, CA, 94720, USA
Office AddressBerkeley, CA, 94720, USA

Full Description

Show more
The University seeks to demolish the existing Building 54 (B54) Cafeteria and replace the building with a new facility of approximately 46,000 gross square feet (GSF). The project will include a newly constructed building containing a cafeteria with adjoining space for health services, human resources, and conference rooms. The Project also includes seismic upgrades to the second floor of Building 48 (B48) Firehouse to meet Risk Category IV of the California Building Code (CBC). In addition, the project scope includes site utility improvements, site grading, exterior walkways and planters, landscaping, paving, striping, signage, and a new shuttle bus transit hub for LBNL. SSM Construction Projects consists of three sub-projects, generally described as follows and more specifically described in the Incorporated Documents: Demolition Package (Option), generally described as follows to include: Demolition Earthwork New Retaining Walls Utilities relocation as required All associated General Requirements Seismic Safety Modernization (SSM), generally described as follows to include: Main Building Utilities within 5 feet of building footprint Site grading and Paving All associated General Requirements Traffic Hub and Utilities Project (THUP), generally described as follows to include: Bus stop Utilities beyond 5 feet of the building foorprint Landscaping All associated General Requirements SSM Project Goals include: Facilitate timely and effective team engagement, communication, collaboration, partnership, transparency, and planning to anticipate potential problems and proactively solve them, reduce or eliminate risk, and streamline workflow Utilize innovation to optimize design, maximize scope, accelerate the construction schedule, and provide the best value within the estimated price range Complete the project safely, within or below the estimated subcontract price range, and ahead of schedule The successful Offeror (also designated as - Construction Manager - General Contractor or - CM-GC) will initially perform Phase 1 Construction Manager Services (Phase 1 CM Services) concurrently with the design phase services, in cooperation and collaboration with the LBNL project team and HDR Architecture, the Architect-Engineer (A-E) which is providing SSM design and construction administration services under a separate A-E subcontract between the University and the A-E. During the Phase 1 CM Services, the CM-GC will provide professional subject matter expertise on safety, schedule, cost, constructability, value, risk management, and other administration and execution requirements. The Phase 1 CM Services are more fully described in the incorporated Scope of Work included in Article 23 - Incorporated Documents of the sample subcontract. The University reserves the right to exercise the Phase 2 General Contractor Services (Phase 2 GC Services) Options, and award the Phase 2 General Requirements and Bid Packages that were certified by the University during Phase 1. The Phase 2 GC Services Options are described in the incorporated Scope of Work included in Article 23 - Incorporated Documents of the sample subcontract.

More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor

Same awarding agency

NAICS: 332999
New
Federal
Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project
Solicitation # AA-2027-02
Request for Proposal AA-2027-02, issued by the University of California on behalf of the Lawrence Berkeley National Laboratory, seeks a small business subcontractor for the fabrication, inspection, and delivery of 96 embedded floor plates for the Advanced Light Source Upgrade project. These components serve as critical structural interfaces and leveling surfaces for Storage Ring support plinths. The scope of work includes the production of nine different plate types across multiple batches, with delivery dates spanning from January to August 2027. All fabrication must adhere to LBNL drawings and specific serialization standards, with a strict quality assurance process requiring 100 percent inspection of first article dimensions via CMM or laser tracker. The contract is a total small business set-aside under NAICS code 332999. Award will be granted to the responsive and responsible offeror that is determined to be technically acceptable through a go/no go evaluation and offers the lowest evaluated price. Proposals are due by November 11, 2026, and must include a cover letter, a technical volume addressing manufacturing capacity and past performance, and a business volume containing a price proposal and mandatory representations and certifications. Key administrative requirements include compliance with the Buy American Act, maintenance of full replacement value insurance for stored inventory, and adherence to specific packaging and labeling standards to ensure traceability.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 333517
New
Federal
Large Format Wire Electrical Discharge Machining (EDM) System
Solicitation # KT-2026-03
The Lawrence Berkeley National Laboratory (LBNL) is conducting market research via solicitation KT-2026-03 to identify qualified sources for a Large Format Wire Electrical Discharge Machining (EDM) System. This system will support the Engineering Division in providing high-precision, non-contact machining for complex scientific components, including accelerator structures, detector chassis, and superconducting magnet components. Preliminary technical requirements specify nominal travel targets of approximately 800 mm X, 600 mm Y, and 800 mm Z. The system must adhere to U.S. safety standards, specifically NFPA 79 and UL 508A, with certification from an OSHA-recognized Nationally Recognized Testing Laboratory such as UL, CSA, TÜV, or ETL. This effort is currently a Request for Information (RFI) and not a formal solicitation for proposals; therefore, no subcontracts will be awarded from this specific notice. The primary objective is to establish a list of qualified sources for a future Request for Quotes (RFQ) phase. Interested respondents must submit a completed response form by November 18, 2026, detailing their company information, system capabilities, and lead times. Additionally, LBNL requires the provider to have a West Coast field service organization to support the equipment in Berkeley, California. Respondents must certify their small business status under NAICS 333517 and ensure that no export-controlled or security-sensitive data is included in their submission.
Machine Tool Manufacturing

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 334220
New
Federal
UPDATED ALS SHB pulsed RF HPA
Solicitation # AM202603-25
Solicitation AM202603-25, issued by the University of California Managing and Operating Lawrence Berkeley National Laboratory, seeks proposals for the design, manufacture, and delivery of two 25 kW pulsed Radio Frequency High Power Amplifier (HPA) units for the Advanced Light Source RF Amplifier Replacement Project. The procurement requires one unit operating at approximately 125 MHz and a second at 500 MHz, utilizing modern solid-state LDMOS or GaN FET technology to replace existing tube-based systems. The estimated performance term is 12 months, covering the full product life cycle from preliminary design and NRTL safety certification to installation and site acceptance testing. Proposals are due by November 18, 2026, and will be evaluated based on best overall value, considering technical approach, delivery schedule, quality assurance, past performance, and total price. Awardees must adhere to stringent LBNL safety and build standards, including electrical safety programs, seismic design criteria, and specific packaging and marking requirements. Submissions must include a technical volume, a business volume with a detailed price proposal, and completed representation and certification forms. LBNL has indicated a preference for off-the-shelf systems that meet requirements and will accept closed-loop liquid-cooled solid-state power amplifier bids.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS