This Solicitation opportunity from Georgia was posted on September 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RFP - Stairs Replacement for Orange Crush Attraction for Aquatic Center
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of St. Marys is seeking proposals from qualified contractors or firms to replace the existing stair system at the Orange Crush Tube Slide Attraction within the St. Marys Aquatic Center. The project aims to install a safe, durable, and low-maintenance staircase that connects the ground level to the mid-platform and then to the final platform where riders access the slide. The current stairs are to be replaced to enhance safety and longevity, ensuring a better experience for patrons. The solicitation, identified as "RFP - Stairs Replacement for Orange Crush Attraction," was posted on September 15, 2025, with a response deadline of October 23, 2025. The contract size is estimated to range from $50,000 to $150,000, and the project falls under NAICS code 333924, which pertains to industrial machinery manufacturing. Interested contractors must submit their proposals in accordance with detailed instructions, including five hard copies and one electronic copy, by the specified deadline. The process requires a bid bond of at least 5% of the contract value, along with compliance with insurance, nondiscrimination policies, and Georgia law. The City emphasizes the importance of responsible and responsive bidding, with the right to reject any proposals that do not meet the criteria. The primary point of contact for inquiries is Sarah Lee, reachable via email or phone. The project underscores the City’s commitment to safety, quality, and responsible procurement practices, with all communications and submissions governed by the outlined procedures to ensure fairness and transparency.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The current stair system extends from the ground level to a mid-platform, and from the mid- platform to a final platform, where riders access the slide. The city seeks to replace the stairs with a safe, durable, and low-maintenance solution.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
