RFP884 (abbr.) - Uninterruptible Power Supply (UPS) Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Atlanta Regional Commission (ARC) is soliciting proposals for a turnkey replacement of its discontinued Schneider Electric MGE Galaxy 5000 UPS system at its offices located at 229 Peachtree Street NE, Suite 100. The project requires the furnishing, delivery, installation, and commissioning of one three-phase, double-conversion UPS with a minimum 40 kVA capacity and 480 VAC input/output, including a battery system equal to or greater than 70 Ah and a maintenance bypass panel. The scope of work encompasses a site survey, rigging through a 36-inch-wide doorway, the lawful disposal of the existing unit, and electrical installation performed by a Georgia-licensed contractor. This is a firm fixed price contract with a strict pass/fail requirement for completion and written acceptance by December 31, 2026. Proposals must be submitted as a single PDF or Word file via the ARC procurement portal by November 19, 2026, following site registration and application approval. Required documentation includes technical specifications, a completed price form, three references from the last five years, a notarized Georgia Security and Immigration Compliance Act Affidavit with an E-Verify number, and proof of insurance meeting specific liability limits. Award decisions will be based on the best value, with a focus on technical compliance with Exhibit A and the ability to meet the year-end deadline.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
**All documents must be combined and submitted as one complete proposal.**
The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination agency for the metro Atlanta region. The ARC Office of Information Technology provides technology services to internal departments and partner agencies, with a focus on maintaining a secure, reliable, and highly available network infrastructure that protects the Agency¿s data assets. The offices at 229 Peachtree Street NE, Suite 100 rely on a centralized UPS to maintain the server room and IDF closets during a loss of electrical power supply.
The existing unit is a Schneider Electric MGE Galaxy 5000, 40 kVA, with a 480 VAC three-phase input and output. Schneider discontinued the Galaxy 5000 line in July 2021, so parts and service support are limited. Therefore, ARC is requesting proposals to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) to replace its existing unit, with the work complete by December 31, 2026.
Because the unit must be delivered and installed by year end, every proposal must state the lead time for delivery and for installation, and proposals that cannot meet December 31, 2026 may be found non-responsive.
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → Atlanta Regional Commission
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
