Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFQ - LASC - Central Plant Improvements - Phase 2, Infrastructure - Campus-Wide Hydronic Lines Replacement

Closed
CS-25-12-SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Los Angeles Southwest College Central Plant Improvements Phase 2 and Infrastructure Campus-Wide Hydronic Lines Replacement project aims to enhance the campus's mechanical and electrical systems to support current and future operational demands. The project involves expanding the Central Utility Plant to improve reliability, capacity, and efficiency, including integrating a new swimming pool into the heating system. Additionally, it includes replacing the existing campus-wide hydronic lines to ensure a consistent and efficient supply of hot and chilled water across the campus. Key objectives are to build redundancy, increase system capacity, improve control systems at both building and system levels, and adhere to sustainability and clean energy standards set by the Los Angeles Community College District. The scope encompasses site preparation, excavation, installation of new hydronic lines, connection to existing systems, testing, quality assurance, and site restoration, all while minimizing disruptions to campus activities. The project also involves constructing a new small building (1,074 SF) with associated telecommunications and electrical services, surrounded by a new fence and gates on the East and South sides of the site. The contract, with a value estimated between five and fifteen million dollars, is managed by the Los Angeles Community College District and emphasizes sustainable practices aligned with district policies. The response deadline for this solicitation is October 29, 2025, with primary contact being Carolyn Som via email or phone.

General Info

Agency

California → Los Angeles Community College District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles Community College District
Office AddressN/A
Contacts

Full Description

Show more
The Los Angeles Southwest College Central Plant Improvements Phase 2 and Infrastructure Campus-Wide Hydronic Lines Replacement - Southwest Projects will support future capacities for new projects and continued operation for existing buildings. Central Utility Plant expansion will provide mechanical and electrical system upgrades to enable a reliable, high-performance utility service for the campus in order to accommodate current and projected future loads, including adding the swimming pool to the central heating system.Also, the project includes the replacement of the existing campus-wide hydronic lines to ensure adequate, efficient, and reliable hot and chilled water supply throughout the campus.In summary, the project’s goals are as follows:• The enhanced system will increase the plant and campus hydronic distribution system reliability and capacity.• Build redundancy into the plant.• Increase efficiency of the plant.• Improve control systems at a building and system level.• A new fence and gates around the East and South side of the site will also be installed around the newly configured small building (1,074 SF) and equipment yard. A new telecommunications and electrical services will be installed into the new building.• Site preparation, excavation, installation of new hydronic lines, connection to existing building systems, testing, quality assurance, site restoration, and project closeout. Minimizing disruptions to campus activities will be crucial to the success of this project.• Adhere to the LACCD Board of Trustees clean energy and sustainability

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS