RFQ Progressive Design Build - Brush Creek Pump Station Improvements Project (MTM1-C080)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Johnson County Kansas has issued RFQ 2026-045 for a Progressive Design Build project to replace the Brush Creek Pump Station in Prairie Village. The project aims to replace aging infrastructure with a new station designed for current flows and future wet weather capacities to support the eventual decommissioning of the Peak Excess Flow Treatment Facility. The total project cost is estimated between 12 million and 17 million dollars. The procurement follows a two-phase format: Phase 1 focuses on pre-construction and design services to reach a mutually agreeable Guaranteed Maximum Price (GMP) by the 60 percent design mark, while Phase 2 covers the construction phase. The tentative schedule begins with a notice to proceed in June 2027, with construction starting in January 2029 and final completion targeted for December 2030. The selection process is qualifications-based, starting with a Statement of Qualifications (SOQ) due by December 9, 2026, at 2:00 PM. Shortlisted firms will then move to a Request for Proposal (RFP) phase including a cost proposal. Mandatory requirements for respondents include the ability to secure performance and payment bonds up to 20 million dollars, legal registration to do business in Kansas, and demonstrated experience in constructing complex wastewater facilities while maintaining existing operations. Evaluation criteria focus on the Design-Builder profile, project management and teaming approach, and overall responsiveness to the RFQ. The project also includes specific requirements for the restoration of a baseball field in Porter Park and adherence to cybersecurity response plans and ADA compliance.
General Info
Agency
Place of Performance
Prairie Village, KS, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (6)
See All 6 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Purchasing Administrator: Nicole Averell, CPPO, CPPB
Contact Information: contact@example.gov +1 (555) 000-0000
2.2. PROJECT DESCRIPTION
JCW is seeking SOQs from qualified Design-Builders to initially provide pre-construction services and design services to complete the design based on HDR’s 2026 Preliminary Engineering Report. JCW and Owner’s Advisor will assist the Design-Builder to design and construct a new Brush Creek Pump Station. The Progressive Design Build will follow a two-phase format. In Phase 1, the Design-Builder will be responsible for working with JCW to reach an agreeable GMP anticipated to be finalized around 60% design. Multiple GMPs may be allowed assuming they are mutually agreeable, that schedule allows, and they benefit the project. Depending on the cost and the progress of the project, if the GMP is favorable then JCW will seek BOCC approval to amend the agreement and continue into Phase 2, the construction phase, with the Design-Builder. If a satisfactory GMP cannot be reached, JCW may elect to off-ramp the project and will need to negotiate design services to 100% design including bidding services in order to hard-bid the project.
The estimated total project cost, including engineering, easements, land acquisitions, and construction is between $12-$17 million, which includes escalation to midpoint of construction in 2029.
2.3. TENTATIVE PROJECT SCHEDULE
A preliminary engineering report has been completed for this project by the Owner’s Advisor. The following overall project milestones are provided below for reference and are intended to provide a general intent for project duration. The actual design and construction milestones will be determined in the design phase with the Design-Builderprior to the GMP.
RFQ Advertised November 4, 2026
Notice to Proceed June 2027
Design and GMP Development June 2027- September 2028
Complete Design December 2028
Begin Construction January 2029
Substantial Completion September 2030
Final Completion December 2030
The Agreement with Prairie Village contains requirements and timelines for work on this project and the use of the baseball field in Porter Park. The City is allowing two years of use of the field including restoration, which is to be provided by the Design-Builder. The Agreement is being finalized and will be made available with the RFP. The details of the executed Agreement shall supersede any requirements stated herein. The BOCC approval process requires sixty days assuming that all the information, data, costs, contracts, etc. are ready at the start of this process. The Design-Builder shall take this duration into account for any schedule planning.
3. QUESTIONS
To ensure open and fair competition for all potential respondents, ALL questions and contact concerning this RFQ shall be directed to the Johnson County Purchasing Administrator.
We encourage you to submit questions up until the cutoff date and time by selecting ‘Ask Question’ on the solicitation event at: https://jocogov.ionwave.net
Respondent should make NO CONTACT, either written or verbal, with the Board of County Commissioners, Johnson County legal counsel, department personnel, consultants, or other county boards beginning with the issuance of this document through approval of award.
4. NON-MANDATORY PRE-SELECTION CONFERENCE
A Pre-Selection Conference will be held on November 12, 2026, at 9:00 a.m., CT via Zoom Video Conferencing.
This Conference is optional and not mandatory for responding to this RFQ. The purpose of this meeting is to explain the solicitation process and go over general information for the Project. Access is available here:
Join Zoom Meeting
https://us02web.zoom.us/j/89153467458?pwd=DSm3FoRzj1U3JLVhgngFYIV804087e.1
Meeting ID: 891 5346 7458
Passcode: 999099
9.5. STATEMENT OF QUALIFICATONS OPENING
Virtual RFQ openings are held via Zoom Meeting publicly on the opening date and at the opening time specified on the RFQ document at the link provided below. Respondents may notify the purchasing administrator no less than two (2) business days before the bid opening if they wish to attend the opening in person for accommodation.
Join Zoom Meeting
https://us02web.zoom.us/j/85772755088?pwd=ltuGNDFNSkRoaFrgB8DQFgXsaS7bqk.1
Meeting ID: 857 7275 5088
Passcode: 334805
It is the respondent’s responsibility to ensure that the SOQ is submitted electronically by the official opening date and time at https://jocogov.ionwave.net. Late submissions will not be considered regardless of the degree of lateness or the reason related thereto, including causes beyond the control of the respondent.
Unofficial results of the SOQ’s that have been submitted will be available electronically at https://jocogov.ionwave.net within 24 hours of the opening.
Similar Contracts
Same NAICS industry code
More opportunities from Johnson County Kansas
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
