This Solicitation opportunity from Ohio was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RICKENBACKER BLDG. 2000 HVAC REPLACEMENT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SRC0000041227 is for the replacement of HVAC systems at Rickenbacker Building 2000, located at the Civil Engineering Building 875, 7370 Minuteman Way, Columbus, Ohio. The project involves the installation and maintenance of heating, cooling, and air conditioning services. A pre-bid walkthrough is scheduled for August 24, 2026, at 11:00 AM. Bids and quotes must be submitted online by August 31, 2026, at 4:00 PM. Submissions must include an itemized quote on company letterhead, a signed Bidder Certification, and a single PDF containing all required compliance verification documents, including insurance certificates, BWC certification, and Secretary of State registration. The contract is governed by the Standard Terms and Conditions of the State of Ohio, which are non-negotiable. Contractors must adhere to strict environmental procedures for Ohio Army National Guard projects, covering waste management, spill response, and the protection of natural and cultural resources. All payments will be processed electronically via the Ohio Pays system. Bidders are required to submit all inquiries through the online portal, as email questions will not be answered. The final contract will be awarded to the lowest responsive and responsible bidder based on the provided specifications and the Scope of Work.
General Info
Place of Performance
Set-Aside
Documents
12AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 22 days
- Springdale JCC –Recreation HVAC Repair or ReplacementOpen now, due in 14 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice description changed.
Deadline has passed
Organization & Contact Information
Full Description
BIDS OR QUOTES CAN ONLY BE SUBMITTED ONLINE. Please download and review all documents. Attach an itemized quote on company letterhead or business form in the questionnaire section. Note: Any pre-printed terms and conditions on forms used by the supplier do not supplement or replace the Standard Terms and Conditions of the State of Ohio, or any Specific Terms and Conditions of the resulting contract of any solicitation. The Standard Terms and Conditions for the State of Ohio are not negotiable. Post questions as an inquiry on this site. Inquiries sent by email will not receive a response.BIDDER CERTIFICATION: A completed and signed copy of the Bidder Certification must accompany the submitted quote. This document becomes a part of the contract after award to include the respective proposal, proposal submission instructions, Specific Terms and Conditions (if any), Standard Terms and Conditions (Attachment 1), addenda to the solicitation, specifications, pricing schedules, Scope of Work (Attachment 2), and any attachments incorporated by reference and accepted by ADJ become a part of this Contract and constitutes the entire agreement between the parties, and any changes or modifications to this Contract must be in writing by amendment.A site visit has been scheduled. Please review the Request for Quotes document for site visit information.
Heating and cooling and air conditioning HVAC installation and maintenance service
Inquiries Inquiry 94687 | IMPORTANT NOTICE : DUE TO UNFORESEEN CIRCUMSTANCES,THE WALKTHROUGH TIME HAS BEEN MOVED TO 11:00 AM. WE APOLOGIZE FOR ANY INCONVENIENCE AND APPRECIATE YOUR UNDERSTANDING . | Answer: IMPORTANT NOTICE : DUE TO UNFORESEEN CIRCUMSTANCES,THE WALKTHROUGH TIME HAS BEEN MOVED TO 11:00 AM. WE APOLOGIZE FOR ANY INCONVENIENCE AND APPRECIATE YOUR UNDERSTANDING . | Answered: 8/17/2026 Inquiry 95215 | updates and clarifications to the previous bid documents are indicated in red. | Answer: updates and clarifications to the previous bid documents are indicated in red. | Answered: 8/25/2026 Inquiry 95225 | bidders that updates and clarifications to the previous bid documents are indicated in red. | Answer: Project # NLZG262013 Bldg. 2000 HVAC Replacement 1STATEMENT OF WORKBldg. 2000 HVAC Replacement1.01 SCOPE: Contractor shall furnish all labor, materials, equipment and supplies necessary to complete the replacement of the existing Chiller Unit (ACU-1), existing Trane Condenser Unit (ACU-2), and three (3) related Air handler Units (AHU-1,2, & 3) at Building 2000, including the AHU supply and return fan Variable Frequency Drives (VFD) (AHU 1 & 2), related equipment safety power supply switch/components (where applicable), chilled water supply and return lines (immediately up and downstream of Chiller & AHUs as required to accommodate new equipment), and all or any other related or required components to make the units whole and operational. In addition, the contractor will assess the existing Variable Air Volume (VAV) boxes/terminal units and related room/space sensors in the building and replace as required (56 total).1.02 LOCATION: Rickenbacker ANGB Building 2000.1.03 COORDINATION: Notify 121st Civil Engineering at +1 (•••) •••-••••Sign up to see this detail or contact Mr. Michael Hissom at +1 (•••) •••-••••Sign up to see this detail, a minimum of seven (10) business days prior to starting any work. Coordination with the 121st CES is mandatory.1.04 SUBMITTALS:A. Quote must contain an itemized list for labor, parts, materials, equipment rental and any other incidental expenses.B. Contractor shall provide a detailed schedule of construction for this project.C. Contractor shall include with their proposal what GREEN Procurement (Re-Cycled-Bio Based Content) items which they intend to use on the contract (if applicable).The following web sites should be reviewed for materials which can be used in the Governments Green Procurement effort.Information on Recycled content requirements: www.epa.gov/cpg (Check under Products/Construction Material)Information on Bio based program: www.biobased.oce.usda.govD. The following items must be submitted by the Contractor after award at the Pre-Construction Conference:1. Contractor will provide SDS Sheets for all: concrete, glues, sealants, solvents, additives, cleaners and fuels to be used. All other substances of a flammable, corrosive and toxic nature shall be submitted as well.2. Contractor will ensure that each of the aforementioned SDS items are listed on a Transient Organization Hazardous Material Inventory Sheet and submitted for approval prior to starting work.3. Contractor will utilize Material Approval Submittal (AF IMT 3000) to provideProject # NLZG262013 Bldg. 2000 HVAC Replacement 2submittals for all equipment, materials, and parts to be installed prior to installation at the project site.4. To be turned in upon completion of work. Contractor will fill out a Solid Waste Disposal Spreadsheet, which tracks construction debris that goes to dump sites or that is recycled. (When applicable). The intent is to capture quantities and costs.5. To be turned in upon completion of work. All warranty and training documentation for all applicable work and materials, equipment, and parts installed as part of the project.1.05 WORK TO BE ACCOMPLISHED:1. Background:a. The existing Trane Chiller Unit, related Trane AHUs (1 & 2), existing Trane Condenser Unit (ACU-2), related AHU 3, and AHU (1 & 2) VFDs, and all related components, as well as the system’s Variable Air Volume (VAV) boxes/terminal units at Building 2000 are at the end of their operational life. The intent is to replace the existing units in kind with new equipment that meets required/existing loads.b. VAV assessment and replacement are confined to the Boxes and related heating valve actuators. The existing air distribution system ductwork shall remain intact and only be modified to accommodate the new equipment/unit(s) where necessary.c. The Contractor shall recover all refrigerants from the system prior to the start of work.2. Requirements:a. All materials and work shall be IAW Department of Defense Unified Facilities (DoD UFC) Code 3-410-01 dated 28 July 2025 / Change 1 & Supplement 1 dated 23 January 2026 (attached) and applicable standards therein.b. Demolitioni. Contractor shall per all required local, state, or federal codes, and industry, safety and environmental regulation standards/requirements safely remove and dispose of all existing units and associated equipment.ii. Contractor will remove:1. Existing 460V, 3PH 125 Ton Trane Chiller Unit (Model: RTAA1254XJ01A300B, Serial:U98F00857).2. Related AHU-1 (Model: Trane MCCA030BAJ0CADB, Serial: K98G67151).Project # NLZG262013 Bldg. 2000 HVAC Replacement 33. Related AHU-2 (Model: Trane MCCA030BAJ0CACB, Serial: K98G67176).4. AHU-3 (Model: Trane MCCA08GV0ABG, Serial: K98G64606).5. 5-Ton Trane Condenser Unit ACU-2 (Model: TTA120H300AA, Serial: 17335LFNYA)6. All related supply & return air handler VFDs for both AHU-1 and AHU-2 (no VFDs for AHU3), and any related unit power supply safety switches, supply & return water piping work (at chiller & AHUs 1 & 2) and valves as required to install new equipment, and all other related components as required.7. To include all related VAV boxes/terminal units and related room/space sensors.iii. Contractor will disconnect the electric service for the units.iv. Contractor will disconnect the existing control wiring for the units.c. Once all materials and equipment have been removed from the system it then becomes the contractor’s responsibility to make necessary repairs to the facility resulting from the demolition.d. Installationi. The Contractor ensuring best practice, safety, efficiency, and performance shall follow IAW DoD UFC as aforementioned above, while incorporating/adhering to ASHRAE standards and codes for new equipment installation, shall install:1. A new 125 Ton, 460V, 3PH Chiller Unit to replace ACU-1,2. A new 5 Ton Condenser Unit to replace ACU-23. New AHUs to replace units 1,2 & 3, and related AHU 1 & 2 VFDs.4. New VAV boxes/terminal units and related room/space sensors/thermostats.ii. The Contractor ensuring best practice, safety, efficiency, and performance shall IAW DoD UFC as aforementioned above, while incorporating/adhering to ASHRAE standards and codes for new equipment installation, shall assess the existing Variable Air Volume Boxes/terminal units and replace those units, including upgrading VAV heating valve actuators (Johnson Controls VA-7150-1001) and related room/space sensor/thermostat, not meeting performance requirements. There are 56 total units in the facility. Layouts and technical data are included.iii. New equipment shall be installed using new materials that meet or exceed local, state, and IAW DoD UFC/ASHRAE standards, ensuring full compliance and operational efficiency.iv. The new chiller (unit make & model dependent) shall have all required sensors, variable speed fans, cooling capacity compressor staging, electronic expansion valves (if applicable), all required safetyProject # NLZG262013 Bldg. 2000 HVAC Replacement 4components, i.e., per circuit high and low pressure protection, compressor overload protection, 3-phase voltage protection, compressor protection anti-cycling timer, etc., compressor oil level sight glass, compressor suction service valves and liquid line shutoff valves, no Hot Gas Bypass, to include service ports with valve cores for pressure checking/service, liquid line solenoid valves, full port circuit section isolation ball valves, filter dryers, coil protective panels/grills and hail guards.v. The type of refrigerant for the newly installed equipment will be determined per new equipment requirements.vi. New equipment shall be compatible with the existing Metasys System and be enabled for remote monitoring and operation.vii. New equipment will be installed on existing housekeeping pads.e. Installation (Cont.)i. Related supply and return water lines (at chiller and AHUs) and all related accessories, i.e., utility piping, power/control wiring, conduit, etc. will be replaced only as required to accommodate new equipment installation equipment/standards. Every attempt shall be made to reuse existing utility feeds provided they meet new equipment and current construction standard requirements and are still serviceable.ii. The Contractor shall only modify supply or return AHU ductwork as required to connect to the existing air distribution system.iii. These systems shall be designed and installed with safety and high ease of maintenance in mind. Safe and ease of access of equipment hatches, doors, controls, and safety disconnects shall be taken into consideration when equipment is installed.iv. All Make-Model-Serial Number and total quantity of refrigerants for each system as well as Operations/Maintenance Manuals shall be provided to the 121st Civil Engineering Squadron.v. The new equipment/system control functionality must mirror the existing operational sequences, ensuring consistent energy management, scheduling, and alarming, and must be fully supported by the existing Metasys server. To include proper integration, sequencing, and compatibility of all newly installed and existing system equipment. Ensuring new equipment operates within design specifications, verifying proper operation, proper airflow, proper temperature regulation, and overall proper system performance before completion of all work.3. The 121st Civil Engineering Squadron is mandating a Manufacturer System Start-Up to verify the system operates per manufacturers specifications, establishing a maintenance baseline and ensuring the system meets all warranty prerequisites.Project # NLZG262013 Bldg. 2000 HVAC Replacement 51.06 BID SCHEDULE: Bids shall be submitted with the price broken out in three contract line numbers. (CLIN).CLIN 0001: Replacement of the existing Chiller Unit ACU-1 & Condenser Unit ACU-2.CLIN 0002: Replacement of the three existing AHUs 1, 2, & 3CLIN 0003: Assess VAV System and replace VAV Boxes and all related room/space sensor/thermostats as required.1.07 SAFETY: All precautions necessary to ensure the safety of personnel and the protection of existing equipment and structures will be strictly enforced. All additional electrical safety precautions shall be followed. All OSHA standards shall be met.1.08 CONSTRUCTION DIRT AND DEBRIS: The contractor shall remove any dirt, debris, construction waste that collects during construction on the traveled roadways or existing pedestrian facilities on the base as directed by the Base Civil Engineer.1.09 CONSTRUCTION STAGING OF EQUIPMENT: The contractor shall coordinate with the Base Civil Engineer appropriate locations for overnight storage/staging of construction equipment.1.10 HAZARDOUS MATERIALS REQUIREMENTS:1. HAZMAT shall not be stored on base unless with written permission from contracting officer and HMP. When Hazardous Material (HM) is to be stored for use on Rickenbacker ANGB, the contractor shall establish a hazardous material storage and distribution system that complies with all Federal, State, and Local environmental regulations.2. The contractor shall register through the Contracting Officer with the base Hazardous Material Pharmacy (HMP) prior to start of work.The contractor shall submit to the Contracting Officer for approval the following for all HM, as defined by Federal Standard 313 Table I and Table II, to be used in the accomplishment of the work / service to be provided to the government: See paragraph 1.04 Submittals1.11 SITE CONDITIONS: Submission of a proposal by a contractor shall be considered evidence that the contractor has examined the statement of work and is satisfied as to the nature and location of the work and all matters, which can in any way affect the work or the cost of the work under the proposal. Any failure of the contractor to become acquainted with all available information, including a physical survey of the site for the proposed work will not relieve the contractor from successfully fulfilling all work that is required for a complete and acceptable job. | Answered: 8/25/2026 Inquiry 95239 | In addition to the revised Statement of Work uploaded on 8/25, there is a set of drawings and data on the Building 2000 VAV System. Ohio Buys is not allowing the document to be uploaded, so we will send a copy via e-mail to the attendees that signed in for the pre-bid walk. If you did not attend the pre-bid and would like a copy , or attendees who do not receive the attachment in the next 24H, please contact Mr. Michael Hissom, RANGB Base Engineer, at •••••@•••••.•••Sign up to see this detail | Answer: In addition to the revised Statement of Work uploaded on 8/25, there is a set of drawings and data on the Building 2000 VAV System. Ohio Buys is not allowing the document to be uploaded, so we will send a copy via e-mail to the attendees that signed in for the pre-bid walk. If you did not attend the pre-bid and would like a copy , or attendees who do not receive the attachment in the next 24H, please contact Mr. Michael Hissom, RANGB Base Engineer, at •••••@•••••.•••Sign up to see this detail | Answered: 8/25/2026 Inquiry 95253 | Will JCI make all the new control connections for the chiller and AHU units? The successful bidder is responsible to make all control connections to make the system whole and operational. According to the specs and drawings there are 49 VAV that are multiple sizes. Is that correct? An addendum released yesterday (08/25/2026) shows the VAV System, including data for the individual units. Refer to it for your takeoff information. Will we need to keep spaces comfortable during the replacement period? Rental Units? Rental Chiller? There is no requirement for temporary cooling during the project. | Answer: Will JCI make all the new control connections for the chiller and AHU units? The successful bidder is responsible to make all control connections to make the system whole and operational. According to the specs and drawings there are 49 VAV that are multiple sizes. Is that correct? An addendum released yesterday (08/25/2026) shows the VAV System, including data for the individual units. Refer to it for your takeoff information. Will we need to keep spaces comfortable during the replacement period? Rental Units? Rental Chiller? There is no requirement for temporary cooling during the project. | Answered: 8/26/2026
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
