Rip-Rap and Erosion Control Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Tuolumne Utilities District involves the supply and installation of a rip-rap stabilization structure in Sonora, California. The scope of work requires the placement of graded stone and geotextile filter fabric at an outlet structure to prevent scour and erosion of the bank and streambed. The contractor must strictly adhere to the CDFW Lake or Streambed Alteration Agreement to ensure no adverse impacts occur to local fish and wildlife. The final deliverable is a completed rip-rap structure designed to protect the surrounding environment and infrastructure.
General Info
Agency
Place of Performance
Set-Aside
Documents
This scope was carved out of EPIMS-TUO-62946-R4.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Teleli Golf Course Recycled Water Pipeline
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Read the full solicitation package
This scope is part of a larger contract. Its documents live on the prime.
- 1 document on the prime contractFrom Teleli Golf Course Recycled Water Pipeline
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
subcontract
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
