Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Riprap and Rock Stabilization Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of rock and riprap for erosion control and slope stabilization on highway FM0876 in Ellis County, Texas. The selected provider will work for prime contractors on Texas Department of Transportation maintenance projects, utilizing excavators, skid steers, and loaders to place and grade materials for roadside and drainage area stabilization. The contractor is responsible for delivering a completed stabilization system while adhering to all TxDOT maintenance standards and managing traffic safety. This opportunity falls under NAICS code 238990, with a response deadline of October 14, 2026.

General Info

Rock and riprap installation for TxDOT erosion control on FM0876, Ellis County, Texas.

Agency

Texas Department of Transportation

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 6505-19-001.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LOCAL LET MAINTENANCE CONTRACT, ELLIS CO, ROCK/RIPRAP

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of rock and riprap for erosion control and slope stabilization for prime contractors on TxDOT maintenance projects, here on highway FM0876 in Ellis County, TX. Places and grades rock materials to stabilize roadside and drainage areas using excavators, skid steers, or loaders. Complies with TxDOT maintenance standards and manages traffic safety. Delivers the completed rock/riprap stabilization system.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
85626B0001-CSB Sidewalk Sheds and Scaffolding RC
Solicitation # 85626B0001
The New York City Department of Citywide Administrative Services (DCAS) is soliciting bids under EPIN 85626B0001 for a requirements contract to provide labor, materials, and equipment for the installation, maintenance, dismantling, and removal of sidewalk sheds and scaffolding across the five boroughs. The scope includes various sidewalk shed widths and heights, standard pipe frame scaffolding up to 400 feet, and decorative sheds, all of which must comply with NYC Department of Buildings Code Section 33148 and OSHA safety regulations. The contract is awarded to the lowest responsive and responsible bidder, with specific mark-up caps of 10% for materials and 60% for labor. The agreement is subject to the 2025-2028 NYC Agency Citywide New Construction and Renovation Project Labor Agreement (PLA), requiring contractors to execute a Letter of Assent and adhere to prevailing wage schedules for 2026-2027. Administrative requirements include the submission of certified payrolls via the Electronic Certified Payroll Database and the provision of performance and payment bonds. Bidders must submit all documentation, including the Bidder’s Minimum Qualification Form and BIDS Form for subcontractors, through the PASSPort portal by the specified deadline. Payments are processed via electronic funds transfer (EFT) through the PIP account system.
Department Of Citywide Administrative Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS