Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Riprap R30 Placement

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply and placement of R30-sized riprap stone to provide erosion protection along levee slopes, specifying the use of stone conforming to the R30 classification for durability and hydraulic stability. This is a subcontract classified as a Total Small Business Set-Aside under FAR 19.5, ensuring that only small businesses are eligible to compete for the award. The North American Industry Classification System code 237120 identifies the work as related to water and sewage system construction, aligning the scope with civil infrastructure and embankment protection efforts. The contracting agency is the Department of Defense, specifically the W07V Endist St Paul office, though detailed location information for performance or delivery is not provided. The solicitation was posted on May 22, 2026, and the work is expected to be carried out at a levee site under the Department of Defense's jurisdiction, with full performance likely requiring compliance with federal construction and environmental standards for erosion control projects.

General Info

R30 riprap supplied for DoD levee erosion protection; small business set-aside under FAR 19.5.

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

MN

Set-Aside

SBA

Documents

This scope was carved out of W912ES26BA006.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REHABILITATION OF MARSHALL FLOOD CONTROL WORK

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom REHABILITATION OF MARSHALL FLOOD CONTROL WORK
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and placement of R30-sized riprap stone for erosion protection along levee slopes.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the Bristol Alliance of Companies. The scope of work involves comprehensive upgrades and repairs to the fueling system, including upgrading tank automatic tank gauges (ATG), repairing dispenser and offload concrete, installing emergency fuel shut-off (EFSO) systems, and mounting leak detector probes on two diesel above-ground storage tanks. Additional requirements include providing concrete circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man control for truck loading, and modifying tank access platforms. All tanks must be cleaned and vapor-free before work begins, and the project must adhere to UFC, NFPA, and ASTM standards, as well as ADA and ABA accessibility guidelines. This firm-fixed-price solicitation (W9128F27RA054) uses a Lowest Price Technically Acceptable (LPTA) selection process. Proposals must be submitted in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the contract duration, and a technical approach, and a separate pricing volume. The period of performance is 410 calendar days, with a final delivery date of June 18, 2027. The contractor is required to maintain a quality control system complying with FAR 52.246-12 and must adhere to Davis-Bacon Act wage determinations. There is no specific set-aside status for this contract.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, located in Mather, California, is a design-build effort to upgrade and repair fueling infrastructure at the Mather Army Aviation Support Facility. The scope of work includes installing a sampling gauge hatch and a clock-type mechanical gauge on a manway, recoating the tank exterior, replacing collision barriers, adding a full-tank catwalk, and replacing audible and visual alarms. Additional requirements include fixing remote containment basin drainage, replacing asphalt on the northeast side of the facility, repairing refueler parking concrete, installing a non-coalescing filter and water draw-off system, replacing asphalt near the loading facility with a concrete path, replacing the POL building, installing and testing an ATG system on the AVGAS Fuel Storage Tank, and relocating a generator from a compartmentalized area. This is a Firm Fixed-Price contract restricted as a Small Business Set Aside - Total. The government will use the Lowest Price Technically Acceptable (LPTA) selection method, evaluating technical proposals based on project experience—requiring three examples of projects valued at $1 million or more—and the proposed project schedule. The projected period of performance is 365 days. The project must adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements, and is subject to the Davis-Bacon Act for prevailing wage rates. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237120
New
International
Expansion And Improvement of Fuel Storage Facilities at OSESGY Premises In Aden, Yemen Chief Procurement Unit
Solicitation # EOIOSESGY24933
The Office of the Special Envoy of the Secretary-General for Yemen requires a qualified contractor to expand and improve diesel fuel storage facilities at its Office and Accommodation premises in Aden, Yemen. The project involves the supply, installation, testing, and commissioning of a horizontal diesel tank with at least 20,000 L capacity at the Office and a vertical tank with at least 5,000 L capacity at the Accommodation. Key tasks include improving fuel containment, enhancing maintenance access, reinstating finishes, and connecting to existing generator fuel systems while ensuring an uninterrupted diesel supply during the works. The project must be completed within two calendar months from the commencement date. Interested vendors must be registered at least at the Basic Level in UNGM to be considered. Required documentation includes a signed Qualification Checklist, a company registration certificate showing at least three years of operation in Yemen, and a company profile. Contractors must demonstrate experience in at least three similar projects valued at USD 30,000 or more completed within the last five years. Additionally, the contractor must provide qualified key personnel, including a Project Manager and Civil Engineer with five years of experience, and commit to warranties covering materials for one year, workmanship for two years, and structural works for ten years.
UN Secretariat

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, materials, insurance, and permits to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. The installation includes a 2500-gallon gasoline tank and a 1000-gallon diesel tank, along with new concrete pads, side-mount dispensers, pumps, and a magnetic digital Automatic Tank Gauge. To maintain operations during the project, the contractor must provide temporary gasoline and diesel tanks with metered dispensers. This is a Small Business Reserve Procurement, limited to certified small businesses. The procurement has established participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-owned Small Business Enterprises (VSBE). The contract is estimated between $100,000 and $500,000, with the award based on the lowest responsive and responsible bidder. All work must comply with Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, as well as API standards 650, 620, and recommended practice 1604. Final acceptance is contingent upon approval from the Facility Manager and DNR Project Engineer, and requires the submission of inspection certificates and disposal manifests.

POSTED

5 days ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS