Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

River Channel Modification & Widening

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves river channel widening and modifications for USACE flood control projects located in Dorado and Toa Baja, Puerto Rico. The scope of work includes dredging and excavation across 1.6 miles of the La Plata River, requiring the use of heavy excavation equipment and water diversion systems to manage dam releases and high water events. All activities must strictly adhere to USACE engineering specifications to deliver a modified river channel. The project is managed under the Department of Defense via the W2SR Endist Caribbean agency, falling under NAICS code 237990. The response deadline for this opportunity is October 27, 2026, with performance taking place in the 00951 zip code area.

General Info

USACE river channel widening and dredging in Puerto Rico, deadline October 27, 2026.

Agency

Department Of Defense → W2SR Endist Caribbean(provis)View Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

PR, 00951

Set-Aside

NONE

Documents

This scope was carved out of W51DQV26RA002.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SR Endist Caribbean(provis)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W2SR Endist Caribbean(provis)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs river channel widening and modifications for prime contractors on USACE flood control projects in Dorado and Toa Baja, Puerto Rico. Executes dredging and excavation over 1.6 miles of the La Plata River, managing high water events and dam releases. Utilizes heavy excavation and dredging equipment with water diversion systems. Complies with USACE engineering specifications. Delivers a widened and modified river channel.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work, piping and materials, structural finishing, and electrical work. Specific requirements include aggregates, trucking, asphalt paving, various piping materials such as ductile iron and PVC, masonry, welding, roofing, and general electrical services. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, MBE, WBE, and SBE certified firms, who must provide valid certification from recognized entities such as the US EPA or SBA. Mandatory qualifications include a valid California Contractor’s license and acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetted mole repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated value of the work ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, with a specific 10 percent price evaluation preference for HUBZone small business concerns. Bidders must provide performance and payment bonds and are required to submit an organization plan featuring key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on pre- and post-dredge multi-beam hydrographic surveys meeting USACE accuracy standards and strict quality controls for stone materials. Bids must be submitted in sealed envelopes to the USACE Honolulu District office by the deadline, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
SLED
Lake Forest Boat Ramp Maintenance Dredging Project
Solicitation # 20260908051
The Lake Forest Boat Ramp Maintenance Dredging Project, managed by the Tahoe City Public Utility District, involves the removal of approximately 391 to 400 cubic yards of accumulated silt and sand from the boat ramp fairway in Tahoe City, California. The primary objective is to restore the lakebed to a historic design elevation of 6,219 feet (Lake Tahoe Datum) to ensure safe vessel access. The scope of work includes mechanical dredging using a floating barge with an excavator and clamshell bucket, the removal and replacement of floating docks, and the installation of a full-depth turbidity curtain to contain suspended sediments. Dredged materials must be transported to shore via a conveyor system, dewatered, and hauled in watertight trucks to the Eastern Regional Landfill in Truckee. The project is scheduled to begin on November 2, 2026, with a completion deadline of December 4, 2026. The estimated contract value is 208,000 dollars. Qualified bidders must be Class A Contractors with a minimum of five projects of similar size and scope and provide at least three references. Bids are due by September 30, 2026, and must include a bid bond for 10 percent of the total amount. The contractor is required to comply with various regulatory permits from the USACE, Lahontan Regional Water Quality Control Board, USFW, and the California State Lands Commission, as well as California DIR and Davis-Bacon Act prevailing wage requirements. Key administrative details include liquidated damages of 500 dollars per day and the requirement for a Designated Biologist to be approved by the CDFW 30 business days prior to any ground-disturbing activities.
Tahoe City Public Utility District

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
SLED
Bellflower Park Phase I
Solicitation # CIP 2024-11
The City of Adelanto is soliciting bids for the Bellflower Park Phase I project, located at 18361-18411 Bellflower Street, Adelanto, California. This construction project involves the development of a new public park, including the installation of sewer pipes and structures, concrete formwork, a complete basketball court, picnic area flooring, and bicycle racks. The engineer's estimate for the project is 1.7 million dollars, and the contract will be awarded to the responsible bidder who submits the lowest bid based on the total base bid schedule price. The project has a completion timeframe of 240 calendar days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per day. Bidders must provide a bid guarantee of at least 10 percent of the contract price and comply with prevailing wage rates, DIR registration, and the Build America, Buy America Act. Key requirements include a one-year guarantee on materials and workmanship, adherence to OSHA standards, and a waste diversion plan to keep 50 percent of waste material out of landfills. The contractor is required to submit an initial progress schedule within 14 days of the Notice to Proceed and provide monthly invoices. The project incorporates the City of Adelanto Standard Specifications for Public Improvements, Greenbook Standard Specifications, and 2015 Caltrans Standard Plans. Sealed bids are due by September 10, 2026.
City of Adelanto

POSTED

about 21 hours ago

DEADLINE

in about 5 hours
View Details

More opportunities from Department Of Defense → W2SR Endist Caribbean(provis)

Same awarding agency

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a request for proposal for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. This is a firm-fixed-price, design-bid-build construction contract under full and open competition, with an estimated project magnitude between 250 million and 350 million dollars. The scope of work involves approximately 1.6 miles of river channel widening and modifications, the construction of 3.1 miles of earthen levees, and the placement of 160,000 cubic meters of scour protection stone. Additional requirements include the installation of four concrete culverts, utility relocations for water, sewer, and electrical lines, wetland mitigation, and the demolition of abandoned structures. The project also requires an O&M manual detailing procedures to restore levee geometry following seismic-induced deformations. The estimated period of performance is 1,619 calendar days from the receipt of the Notice to Proceed. Offerors must submit proposals electronically via the Procurement Integrated Enterprise Environment portal by the specified deadline. The project falls under NAICS code 237990, and firms that are other than small businesses are required to provide a subcontracting plan per FAR Part 19. Awardees must submit payment and performance bonds equal to the total bid price within 10 days of the award. Prospective contractors are notified that while some real estate rights are pending, all necessary access rights will be obtained before the issuance of the full Notice to Proceed.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237120
New
Federal
Freedom Connection Natural Gas Pipeline
Solicitation # W51DQV26Z1BHC
The U.S. Army Corps of Engineers, Latin America and Caribbean District, is conducting market research for the Freedom Connection Natural Gas Pipeline project in Puerto Rico. Funded by the U.S. Department of Energy, the project aims to enhance the resilience of the northern power grid by constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the San Juan liquid natural gas terminal. The anticipated procurement will be a design-bid-build contract under NAICS code 237120, with an estimated construction magnitude between 25 million and 100 million dollars. The anticipated award date is the second quarter of Fiscal Year 2027, with a performance period of 365 calendar days from the notice to proceed. The scope of work encompasses integrated procurement, labor, and services, including the acquisition of long-lead materials, site preparation, and pipeline installation using both open trench and trenchless methods such as horizontal directional drilling. Responsibilities also include the construction of mainline block-valve stations, pig launcher and receiver stations, delegated design management, and final testing and commissioning. This current notice is a request for information to gauge the capabilities and interest of various small business concerns and certified entities. Interested firms must submit a capability statement of no more than ten pages by September 24, 2026, detailing their corporate information, bonding capacity, and relevant project experience.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS