Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Riverview Development Project, Soledad Canyon Pipe Relocation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Soledad Canyon Road, beginning at Commuter Way and Extending Approximately 2,700 Linear Feet Wes, Santa Clarita, CA, 91350

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
Contacts1 person available
OfficeN/A

Full Description

Show more
Relocation and replacement of approximately 2,700 linear feet of existing 14-inch and 8-inch asbestos cement (AC) water main with 12-inch ductile iron pipe (DIP) within Soledad Canyon Road. The water main relocation and replacement are necessary because the street improvements associated with the Riverview Development directly impact on the existing water mains located within the project corridor.

More opportunities from California → Santa Clarita Valley Water Agency

Same awarding agency

NAICS: 237110
SLED
CLWA Groundwater Containment, Treatment, and Restoration ProjectThe Santa Clarita Valley Water Agency is implementing the Groundwater Containment, Treatment, and Restoration Project in Santa Clarita, California. Addendum 2 of the 2005 Mitigated Negative Declaration focuses on the Saugus 3 and 4 Equipping and V206/V207 Groundwater Treatment Improvements. Key infrastructure modifications include the installation of a new well wastewater discharge pump-to-waste pipeline that parallels an existing 18-inch PVC line and terminates at a new engineered outfall on the Santa Clara River bank, involving limited work within state jurisdictional areas. The project also involves abandoning a small pipeline segment in the Magic Mountain parking lot. Additional technical upgrades include minor site improvements at Wells 206 and 207, featuring new pumps, motors, and variable frequency drive controllers, as well as improvements to ion exchange vessels with provisions for future expansion at Wells S3 and S4. The scope further encompasses permanent equipment for Saugus Wells 3 and 4, the construction of a chloramination facility, and the installation of dual 24-inch pipelines connecting the facility to the existing well site, along with connections to existing 20-inch and 30-inch transmission and distribution pipelines. Design services and purchase orders for these works have been authorized through Resolution SCV-519.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
S Wells PFAS Groundwater Treatment and Disinfection Facility Project
Solicitation # 2022110376
The S Wells PFAS Groundwater Treatment and Disinfection Facility Project, identified by project number 1910240-002C and solicitation number 2022110376, is being implemented by the Santa Clarita Valley Water Agency in Los Angeles County. Funded by the State Water Board, the project aims to restore the use of Wells S6, S7, and S8 to reduce dependency on imported water. The scope of work includes the construction of a per- and polyfluoroalkyl substances groundwater treatment and disinfection facility, a chloramine disinfection building, a new groundwater well (S9), and an underground 12-inch drainage pipeline connection with approximately 2,100 linear feet of associated pipelines. Additionally, the project involves critical upgrades to existing Wells S6, S7, and S8, specifically the replacement of submersible pumps and electrical panel upgrades. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Administrative oversight is led by Principal Engineer Orlando Moreno. The project is located across multiple parcels in Santa Clarita, including Assessor's Parcel Number 2811-066-902. Financing for the project was approved by the State Water Board on July 23, 2026, following an initial Notice of Determination filed on August 20, 2025.
Water and Sewer Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS