Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roadside Tree Clearing and Removal

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

5 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for a roadside tree clearing and removal project. The scope of work involves the clearing and removal of trees and vegetation along 1,200 linear feet of roadside located within Sanborn County Park and the State Route 9 corridor. This opportunity was posted on August 14, 2024, with a response deadline of August 28, 2024. The project is categorized under NAICS code 213111, focusing on the specific environmental maintenance and vegetation management required for the designated California transit corridor.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 04A7081.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B / 04A7081 Install three new drainage systems, erosion control and roadside tree clearing/removal In Santa Clara County on State Route 9 near Saratoga, at Sanborn County Park, at Various Locations.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Clear and remove trees and vegetation along 1,200 linear feet of roadside in Sanborn County Park and State Route 9 corridor.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS