Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roadway Resurfacing

Closed
24-0041-ENState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves providing asphaltic concrete resurfacing services for major roadways and residential streets throughout the City of Clearwater, as detailed in the project documents and engineering maps prepared by the city's Transportation Engineering Division. The scope encompasses not only resurfacing but also related improvements such as installing various curb types, constructing ADA-compliant ramps, and removing trees when necessary to ensure infrastructure and access features meet current standards. The Island Way resurfacing project is prioritized as a time-sensitive initiative, requiring the contractor to mobilize immediately upon receiving the Notice to Proceed and to commence work on Island Way as the initial phase of the contract. The overarching goal is to establish a competitive, on-call annual resurfacing contract with flexible quantities, as the city does not commit to a minimum or maximum purchase volume during the contract term. The contract is initially set for one year but may be renewed for up to three additional years, with the possibility of increased funding if project costs exceed initial estimates, subject to proper authorization. Bidders are required to submit current licensing documentation from the State of Florida and Pinellas County, if applicable, along with their bid responses. The contractor must also provide a project sign, with the final number determined at project start, and additional signs may be added at no extra cost if necessary. The contract size ranges from five to fifteen million dollars, reflecting the scale of work anticipated. The procurement process emphasizes competitive pricing and adherence to specified procedures, with primary contact being Jennifer Burgett. The project aims to enhance roadway conditions citywide, following detailed plans and schedules outlined in the City of Clearwater’s resurfacing strategy, which prioritizes safety, efficiency, and compliance with accessibility standards.

General Info

Documents

2
PDF, High priority: read this first39 pages · ifb
High
PDF, Low priority1 page · other
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
The work under this contract consists of asphaltic concrete resurfacing of major roadways and residential streets throughout the City of Clearwater, as identified in these documents and shown on the engineering maps prepared by the City’s Transportation Engineering Division. The scope also includes associated improvements such as installation of curb types, construction of ADA-compliant ramps, and removal of trees where necessary. These improvements are intended to ensure that adjacent infrastructure and access features are upgraded to acceptable standards in coordination with resurfacing operations.The Island Way resurfacing project is designated as a time-sensitive priority. Upon issuance of the Notice to Proceed, the Contractor shall mobilize directly to Island Way and commence work as the first phase of this contract, in accordance with Section III – Order and Location of the Work.The intent of this bid is to obtain competitive pricing to establish an annual resurfacing contract for on-call (as-needed) services. All quantities are estimates only, and the City of Clearwater (City) is not obligated to purchase any minimum or maximum amount during the life of the contract. All work shall be administered in accordance with Section III, Section 11.3 – Unit Price Work, of the Contract Documents.The City reserves the right to increase funding during the contract term if work exceeds original estimates, subject to required authorizations. Beyond the initial one-year term, the City reserves the right to renew the contract for up to three (3) additional years.The Contractor shall include with the bid response copies of a current Contractor License/Registration with the State of Florida and Pinellas County (if applicable).The Contractor shall provide one [Fixed/Portable] project sign as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s approved schedule of work. Additional signs may be required at no additional cost to the City if necessitated by the Contractor’s schedule.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 236220
New
SLED
Construction of Building at Eagle Skate Park
Solicitation # 2026-ITB-PW-055-MR
The City of Cape Coral, Florida, is soliciting bids for the construction of a new building at Eagle Skate Park under solicitation number 2026-ITB-PW-055-MR. The project involves the construction of an approximately 3,870 square foot facility featuring office space, multipurpose rooms, a pro shop, a concession area, and support services for storage. The scope of work includes comprehensive site preparation, clearing, demolition, and the installation of concrete sidewalks, chainlink fencing, and specific landscaping. Technical requirements encompass detailed electrical, plumbing, and mechanical plans, with a particular emphasis on energy compliance and the protection of threatened burrowing owls in accordance with state and federal laws. Bids must be submitted electronically via the OpenGov platform, with the final response deadline extended to November 20, 2026, at 2:00 PM EST. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, based on an evaluation of resources, past performance, and professional standing. The performance period allows 365 calendar days for substantial completion and 395 calendar days for final completion from the date of the Notice to Proceed. Required submittals include a bid bond equal to 5 percent of the base bid, proof of E-Verify enrollment, and a detailed Bidder Information Statement and Questionnaire. Payment will be processed monthly via applications for payment reviewed by the project engineer.
Commercial and Institutional Building Construction

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
Lift Station No. 85 Replacement
Solicitation # IFB27-0027
The City of Orlando is soliciting bids for the replacement of Lift Station No. 85, located at 3915 South Lake Orlando Parkway in Orlando, Florida. This project, identified as IFB27-0027, has an estimated value of 21,204,000 USD and involves the construction of a new submersible pump type lift station, a masonry building, an electrical building, and an odor control system. The scope of work further includes the installation of gravity sanitary sewers, manholes, service laterals, water services, and a stormwater and stone bed conveyance drain system. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Responses must be submitted electronically via the OpenGov portal by December 4, 2026, at 7:00 pm. Required submittals include a price proposal, a 10 percent bid bond, a W-9, and affidavits of non-collusion and compliance with the City of Orlando Responsible Contractor's Policy. The successful contractor must mobilize on-site within 10 calendar days of the Notice to Proceed and achieve substantial completion within 730 days. Performance and payment bonds, as well as certificates of insurance and workers compensation, are required within two weeks of the notification of intended award. The project is subject to strict regulatory and quality standards, including the Davis-Bacon Act for prevailing wages in Orange County, NPDES stormwater regulations, and ADA accessibility codes. Contractors must certify they are not on scrutinized company lists related to Sudan, Iran, Cuba, Syria, or those boycotting Israel. Payment will be processed via signed applications for payment and is contingent upon the submission of certified payrolls through the City's electronic tracking system. All work is subject to inspection by the Engineer and an independent testing laboratory, with final acceptance based on a joint verification of all completed items.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
SLED
2657ITB - LPGA Boulevard & Jimmy Ann Drive Intersection
Solicitation # 2657ITB
Solicitation 2657ITB is an invitation for bids issued by the City of Daytona Beach Public Works department for the LPGA Boulevard and Jimmy Ann Drive Intersection project. The project requires a contractor to provide all labor, materials, equipment, and supervision necessary to complete the work, including sediment control and storm water management. All work must adhere to current ADA requirements for sidewalks and ramps, OSHA safety standards, and Florida Methods for sampling and testing. The contractor is prohibited from using asbestos-containing materials or lead-based paint without written approval and must comply with Build America, Buy America (BABA) sourcing preferences, specifically regarding US-manufactured steel and iron. Bids must be submitted exclusively through the OpenGov platform by December 15, 2026, at 2:00pm. The contract will be awarded to the lowest responsive and responsible bidder, with the City reserving the right to verify the bidder's financial resources, facilities, and experience. Successful bidders must provide 100% Performance and Payment Bonds for contracts exceeding $100,000. The contractor must also comply with prevailing wage rates, Equal Employment Opportunity (EEO) standards, and Title VI of the Civil Rights Act. Payment applications are reviewed within a 20-day period per the Prompt Payment Act.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS