Roadwork-INSTALL 2 CORRUGATED STEELPIPE CULVERT by open excavation HWY 9. TOTAL LENGTH 54m CS 9-06
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This advance procurement notice seeks a contractor for the installation of two 1,400 mm diameter polymer laminated corrugated steel pipe culverts on Highway 9, located 6.95 km south of the Highway 22 junction. The project involves open excavation of the roadway for a total length of 54 meters and includes the removal and disposal of an existing wood box culvert. Work is expected to commence as early as September 2026, with a targeted completion date of October 31, 2026. The Ministry will supply the two 27-meter long culverts, while the contractor will be responsible for materials such as riprap, granular backfill, asphalt concrete, and granular base course. Bidders must provide a deposit equal to 5 percent of their total bid. This tender features a shortened advertising period and an early completion date, and the Ministry reserves the right to cancel the advertisement. Interested parties may request debriefing sessions within 30 days following the award notification.
General Info
Agency
NAICS
Place of Performance
SK, CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Estimated quantities of materials (subject to change): The following quantities are initial design estimates and are subject to change in the issued tender documents. Proposed culverts – Ministry Suppliedo 2 x 1 400 mm x 27 m long, Polymer Laminated Corrugated Steel Pipe, 125 mm x 25 mm corrugations, 2.0 mm wall thickness Removal and Disposal of Wood Box Culvert – 27.8 m Riprap Type 2 – 75 m3 Granular Backfill – 300 m3 Asphalt Concrete – 110 t Granular Base Course – 400 t Deposit with each Tender - 5% of total bidDeputy Minister of Highways Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing [email protected] within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities.
Similar Contracts
Same NAICS industry code
More opportunities from Saskatchewan Public Sector → Highways
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS