Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Rob Brook Bridge Replacement

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rob Brook Bridge Replacement project, managed by the Forest Service under the Department of Agriculture, involves the demolition and removal of an existing 28-foot bridge structure from forest lands. The project entails the construction of a new 44-foot bridge featuring steel stringers, concrete abutments, wingwalls with micropiles, and a timber deck with a wearing surface. Additional scope of work includes armoring the shore with riprap, installing guardrails, and applying approach surface treatments. The project is located in Albany and is categorized under NAICS code 237310 for highway, street, and bridge construction.

General Info

Forest Service project to replace Rob Brook Bridge with a new 44-foot structure.

Agency

Department of Agriculture → Forest ServiceView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

ALBANY, NH, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of Agriculture → Forest Service
Contacts2 people available
OfficeN/A
Organization / Agency
Department of Agriculture → Forest Service
View Agency Profile
Office AddressN/A
Contacts
BRYANNE THOMPSON
ASHLEY THOMPSON

Full Description

Show more
Work will include demolition of existing 28 bridge structure and dispose of all materials off FS lands. Construction of the new 44 bridge. Bridge plans provided show that is structure will use steel stringers erected from a previous bridge on the forest concrete abutment and wingwalls with micropiles and a timber deck and wearing surface. Additional work includes but not limited to armoring shore with riprap guardrail and approach surface treatment.

Similar Contracts

Same NAICS industry code

More opportunities from Department of Agriculture → Forest Service

Same awarding agency

NAICS: 237310
Federal
Solicitation is Restricted to the Current Region 3 FERM BPA Holders - USDA Forest Service
Solicitation # 127EAX26Q0077
Solicitation 127EAX26Q0077 is a total small business set-aside issued by the USDA Forest Service for the reconstruction and maintenance of approximately 15 miles of National Forest System Roads within the Santa Fe National Forest in New Mexico. The project specifically targets the stabilization of roads and drainages near the Hermits Peak/Calf Canyon Fire burn scar to reduce erosion and restore safe access. This opportunity is restricted exclusively to current Region 3 Forest Engineering and Roads Maintenance Blanket Purchase Agreement holders operating in New Mexico. The place of performance is located in Las Vegas, New Mexico, under NAICS code 237310. The contract emphasizes strict environmental stewardship and sustainability standards. Contractors must utilize products meeting specific biobased content thresholds, including 90 percent for diesel fuel additives, 77 percent for erosion control products, 71 percent for greases, and 44 percent for hydraulic fluids. Compliance with ENERGY STAR, WaterSense, and EPA EPEAT standards is required, and contractors must submit annual biobased product usage reports via SAM.gov by October 31. Proposals are due by September 9, 2026. While specific pricing and evaluation weights are not provided, the project focuses on meeting these sustainability benchmarks as primary quality criteria.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 17 days
View Details