Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Robert A. Perdue Water Treatment Plant Master Plan for Future Plant Facilities (SCH# 2004011048)

Awarded
EPIMS-SDO-55830-R5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2027-2030 On-Call Engineering and Professional Services
Solicitation # 49733
The City of San Rafael is soliciting Statements of Qualifications from consultants and contractors to provide on-call engineering and professional services across a wide array of disciplines, including civil, structural, electrical, environmental, architectural, and transportation services. The city intends to establish a shortlist of up to five firms per discipline to be eligible for work. The contract is structured as a Service Level Agreement effective from July 1, 2027, through June 30, 2030, with an option for a one-year extension. Work will be assigned via individual Task Orders, which will define the specific scope, schedule, and compensation based on either fixed fees or hourly rates. Eligible firms must maintain a principal office in the San Francisco Bay Area and submit their qualifications via Bid Express by December 8, 2026. Evaluation is based on a 100-point ranking system focusing on experience, personnel, and technical capability. Selected contractors must comply with California Labor Code workers compensation requirements, maintain a San Rafael business license, and adhere to state conflict of interest laws. Insurance requirements include statutory workers compensation with at least one million dollars in employer liability and the naming of the city and its agents as additional insureds. Payment is processed monthly within 30 days of receipt, contingent upon appropriated funding.
City of San Rafael

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Setback Levee Projects - Architecture and Engineering Services
Solicitation # 2026-RFQ-260
Pierce County Planning and Public Works is soliciting qualifications for architecture and engineering services under RFQ 2026-RFQ-260 to design setback levee and revetment projects along the Puyallup River. The primary objectives are to reduce flood risk and improve aquatic habitats across four project areas: the Northeast, Northwest, Southwest, and Southeast quadrants. The scope of work includes developing a comprehensive delivery strategy and producing Plans, Specifications, and Estimates (PS&E). Specifically, the consultant will provide designs up to 100 percent for the NE, NW, and SW quadrants, while the SE quadrant requires 30 percent design for three setback alternatives and a no-change alternative. Key technical deliverables include hydrologic and hydraulic modeling, geotechnical evaluations, property acquisition plans, and support for FEMA Conditional Letter of Map Condition (CLOMR) applications. The resulting Professional Services Agreement is anticipated to have an initial term of 12 months, with an option for the County to renew for an additional three years. Performance will follow a structured Stage Gate Delivery Process to ensure consistency from inception through closeout. Proposals are due by November 25, 2026, via the County's eProcurement Portal and will be evaluated on a points-based system to select the most qualified team. The selected contractor must comply with RCW 39.12 prevailing wage requirements and various federal non-discrimination laws. Payments will be processed monthly through the County voucher system based on documented units of work performed.
Planning and Public Works

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
On-Call Professional Engineering Services for Wastewater Collection System Impr
Solicitation # 27-42
Norwich Public Utilities is seeking experienced, multi-disciplinary engineering consulting firms to provide on-call professional engineering, construction management, and construction inspection services for wastewater collection system improvements in Connecticut. The scope of work involves moving projects from concept to construction, including the delivery of conceptual engineering reports, feasibility studies, final design documents for bidding, and construction cost estimating and administration. A critical technical requirement is that any review of closed-circuit television inspection videos must be performed by an engineer holding a valid Pipeline Assessment Certification Program certification from the National Association of Sewer Service Companies. The selection process is based on a weighted scoring system evaluated by a committee, with 50 percent of the score derived from relevant experience and references, 40 percent from staff qualifications and a detailed staffing plan, and 10 percent from corporate organization, including professional licenses and insurance. Proposers must submit a Statement of Qualifications via the City of Norwich Procurement Portal by December 15, 2026. The submission must include a cover letter, a list of at least three project references per category of work, a completed categories of work designation, and a non-collusion affidavit. Selected firms will enter into on-call agreements for a base period of three years, with specific task orders managed through detailed project schedules.
DAS Procurement

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-SDO-55830-R5 with Xochitl Aranda on behalf of the Sweetwater Authority. The project involves the installation of a new aeration and destratification system at the western limits of the Sweetwater Reservoir in Spring Valley, California. The technical scope includes the deployment of air compressors feeding a diffuser line attached to a buoyant air pipeline, with the underwater components anchored by concrete structures and stainless steel cables. To facilitate installation, the pipe system will be assembled on land before being placed in the ground and reservoir, a process that includes excavation near the reservoir rim. The project is subject to strict environmental compliance under the California Environmental Quality Act and Fish and Game Code section 1600 et seq. While the project will result in temporary impacts to 0.08 acres of coastal sage scrub, the California Department of Fish and Wildlife has determined that it will not significantly affect the environment within its jurisdiction or impair public trust resources. As a condition of approval, a Mitigation Reporting or Monitoring Plan has been adopted to ensure all mitigation measures are enforced. The agreement was finalized with a Notice of Determination and CEQA findings signed on November 7, 2025.

General Info

Sweetwater Authority will install an aeration system at Sweetwater Reservoir per CDFW agreement.

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Sweetwater Authority
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Mayra MolinaSenior Environmental Scientist (Specialist)
Israel MarquezLand and Environmental Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SDO-55830-R5), pursuant to Fish and Game Code section 1602, with the project applicant, Xochitl Aranda, acting on behalf of Sweetwater Authority. The Project includes the installation of a new aeration and destratification system within Sweetwater Reservoir. The system will consist of air compressors feeding a diffuser line that is attached to a buoyant air pipeline in the reservoir. The underwater portion of the diffuser line will be anchored by concrete structures set at the bottom of the reservoir and tethered to the line by stainless steel cables. The pipe system will be assembled on land before placing it in the ground and the reservoir. The Project will result in temporary impacts to 0.08 acres of coastal sage scrub that is adjacent to the reservoir.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS