Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Rock Slope Protection (RSP) Supply and Armoring

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply and installation of Class II/III riprap to protect rock slopes at culvert inlets and outlets as well as streambanks, with the primary objective of preventing erosion and scour caused by water flow. The work is part of a broader effort to stabilize critical infrastructure and natural waterways in sensitive environmental areas under the jurisdiction of the Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka. The project is classified under NAICS code 237120, indicating it falls within the Water and Sewer Line and Related Structures Construction sector, and it is structured as a subcontract, suggesting it is part of a larger municipal or federal initiative. All work must comply with environmental and engineering standards appropriate for riprap placement in aquatic and riparian zones. The contract was posted on July 6, 2026, and performance will occur within the state of California, though specific city or zip code details are not provided. The absence of a solicitation number may indicate that this contract was issued through a pre-negotiated agreement or as a task under an existing master contract. The project location and scope require specialized knowledge in streambank stabilization and hydraulic engineering, and the use of Class II/III riprap implies adherence to specific size, durability, and gradation requirements designed to withstand high-flow conditions. While no point of contact is listed, the project can be referenced through the provided UI link, which likely contains detailed scope, specifications, and compliance documentation for vendors and contractors.

General Info

Supply and install Class II/III riprap to prevent erosion at culverts and streambanks in California.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of Hackett Lane Stream Crossing Reconstruction (Notification of Lake or Streambed Alteration, No. EPIMS-SHA-59713-R1).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of rock slope protection at culvert inlets/outlets and streambanks to prevent erosion and scour using Class II/III riprap.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,
FA3029 71 Ftw Cvc

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 237120
New
SLED
Atascadero Creek Lake Fill Pipeline Repair ProjectThe City of Atascadero is undertaking the Atascadero Creek Lake Fill Pipeline Repair Project to address the degradation of approximately 350 linear feet of pipeline that transports water from Atascadero Creek to Atascadero Lake during high-flow events. The project involves replacing the damaged pipeline segment with an equivalent capacity pipe installed in the same alignment, along with repairing associated concrete hold-downs and maintaining existing intake structures and diversion boxes. Approximately 96 cubic yards of excavation will be required to remove the old pipeline and clear riparian vegetation adjacent to and above the pipeline. The work is located in Atascadero, California, with a NAICS code of 237120 for sewer line and related utility construction. The project is posted as a forecast on July 2, 2026, with no solicitation number or estimated contract value provided. Environmental compliance and pollution control are central to the project’s execution. All construction personnel must undergo training conducted by a qualified biologist covering special-status species, protection measures under discretionary permits, and the implications of violating the Federal and California Endangered Species Acts. A sign-in sheet and training fact sheet must be maintained and distributed. Construction activities must adhere to strict erosion and sediment control requirements, including daily maintenance of silt fences and fiber rolls, implemented according to approved design and operational standards. All fueling, equipment maintenance, and staging areas must be located at least 50 feet from any water body, and an on-site spill plan with oil absorbent pads must be available. Fugitive dust must be monitored to ensure emissions remain under 20% opacity, with designated personnel reporting to the APCD Compliance Division, and no idling of diesel equipment is permitted. Upon completion, all disturbed areas must be restored to pre-project contours, and all equipment, materials, and temporary best management practices must be removed from the site. Supporting documentation includes site photographs, species data, and a mitigation summary table to support environmental permitting and compliance.
City of Atascadero

POSTED

6 days ago

DEADLINE

N/A
View Details