This Solicitation opportunity from Ohio was posted on October 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rocky Fork State Park East End Overlook, Men's and Women's ADA Accessible Restroom Renovation.

Closed
SRC0000034781State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is soliciting bids for solicitation CBP#9772 to provide HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. This fixed-price, single lump sum subcontracting opportunity has an estimated value between $100,000 and $250,000. The scope of work requires the thorough cleaning of twelve AHUs and associated coils and ductwork across the Kilmer and Edison Dormitories. Key deliverables include pre-cleaning inspections documented with photographs, the installation of permanent corrosion-resistant access panels, and a final project report. The contractor must complete all work within 90 consecutive business days following a written Notice to Proceed. Bids are due by November 17, 2026, and will be awarded based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with Davis-Bacon prevailing wage determinations for Middlesex County and various FAR clauses regarding security, privacy, and the Buy American Act is mandatory. Final acceptance is contingent upon a written confirmation from the Center following a successful inspection of the operational status of the equipment and the restoration of work areas.
Edison Job Corps

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Harris Hall dormitory (Rooms 123 and 213), repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in both the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and OSHA safety standards, including lock-out/tag-out procedures. Contractors are responsible for providing all new commercial-quality materials and must repair any facility damage caused during performance at no additional cost. Bids are due by October 30, 2026, and must include a detailed cost breakdown on a Bid Sheet, a proposed service schedule, and proof of required Massachusetts licensing. Evaluation is based on cost, qualifications, and administrative compliance, with ETR serving as the sole judge for the award. Mandatory submission requirements include a SAM.gov UEI number, active registration, W-9, business licenses, and certificates of liability insurance. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. The project is subject to federal regulations, including the Davis-Bacon Act and Service Contract Act, requiring the submission of weekly certified payroll reports.
Westover Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes inspecting, repairing, and replacing various components across eight exhaust fans, specifically addressing failed louver actuators, motors, thermostats, blades, and guards. Contractors must ensure all equipment is fully operational and provide all necessary training and maintenance manuals. The project requires adherence to applicable building codes, manufacturer requirements, and OSHA and EPA regulations, including strict chemical management and the maintenance of Material Safety Data Sheets. This is a small business set-aside solicitation open to VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to the responsible offeror with a technically acceptable quote at the lowest price. Proposals must be submitted by October 30, 2026, and include a detailed cost breakdown, evidence of Kentucky state licensing, and proof of bonding capability. The contract is subject to the Davis-Bacon Act and FAR 22.403-1-CWRR, requiring the submission of weekly certified payroll with every invoice. Final payment is contingent upon satisfactory performance and the delivery of lien releases from all subcontractors and suppliers.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of existing distribution piping and air compressors in the Men's Dormitory, Women's Dormitory, and Recreation Building, followed by the installation of a new piping network and a code-approved air compressor. All work must adhere to NFPA 25 (2023 Edition) standards and local, state, and national codes. The selected contractor must complete all work within 30 consecutive business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be evaluated based on overall best value. Prospective bidders must conduct a mandatory physical site visit and sign an attendance roster to be considered. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required at the time of submission, and performance and payment bonds from an A-rated surety will be required upon award. The solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Contractors must comply with prevailing wage rates per the Davis-Bacon Act and submit weekly certified payroll reports to receive payment. Required documentation for award includes a detailed cost breakout, proof of insurance, a UEI number, and a completed SF 1413 form. Final payment is contingent upon a successful final inspection, the submission of operation and maintenance manuals, and the delivery of a certificate of release of liens. First-tier subcontractors with awards exceeding $45,000 must also provide disclosures regarding debarment and suspension per FAR 52.209-6.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 238220
New
Dorm Hot Water Tank Replacement – Glenmont Job Corps Center – S26-006
Solicitation # S26-006
Adams and Associates, Inc. is seeking qualified mechanical and plumbing contractors for a subcontracting project at the Glenmont Job Corps Center in Glenmont, New York. The scope of work involves the removal and disposal of four existing 505-gallon domestic hot water storage tanks and the installation of four new 500-gallon insulated storage tanks, with two tanks per dormitory. Additionally, the contractor must replace four heat exchangers and install one new bronze Bell and Gossett circulator pump in the North Dormitory. Comprehensive services required include piping modifications using ProPress materials, electrical disconnections and reconnections, insulation matching existing standards, rigging, and the provision of a temporary hot water heater to ensure the facility remains operational during the estimated construction period of two and a half to three weeks. Proposals are due by November 9, 2026, at 4:00 PM ET, following a pre-proposal site walkthrough on October 29, 2026. Award selection is based on a weighted evaluation of price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent), meaning the lowest price does not guarantee selection. Contractors must comply with New York State statutory insurance requirements, Davis-Bacon prevailing wage determinations, and strict center security and safety regulations, including a no-fraternization policy with students. Required submission documents include a completed vendor questionnaire with UEI and NAICS codes, a current W-9, and applicable New York State licenses. Payment terms are Net 30 days upon completion and receipt of invoice.
Adams and Associates, Inc.

POSTED

about 1 hour ago

DEADLINE

in 11 days
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center in Kentucky, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall. The scope of work requires the contractor to furnish and install two 4-ton Trane 17 SEER (minimum) twinned split systems using R-454B refrigerant, including two 95% AFUE high-efficiency gas furnaces, matching indoor evaporator coils, and one Honeywell Pro 8000 programmable thermostat with a remote sensor. The project also encompasses the installation of new refrigerant line sets, exterior line hide, and necessary condensate management systems. All work must be completed within 45 days of award and adhere to manufacturer specifications, local codes, and OSHA and EPA regulations. The contract will be awarded to the responsible offeror whose quote is technically acceptable and represents the lowest price. To be considered, bidders must provide evidence of Kentucky state licensing and registration, a minimum 90-day bid guarantee, proof of ability to secure performance and payment bonding, a completed New Vendor Profile, and a W-9. The project is subject to Davis-Bacon Act labor standards, requiring the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Final acceptance is contingent upon a substantial completion walk-through by the center director, the provision of all operating and maintenance manuals, and the verification of proper zoning and temperature control. Quotes are due by October 30, 2026, at 5:00 PM.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
The Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work involves the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or an equivalent model. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all installed plenum materials are plenum rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding 100,000 dollars require 100 percent payment and performance bonding upon award. Submissions must include a safe work process, detailed material and labor costs, total project cost, equipment cut sheets, warranty information, and a proposed payment schedule. Final deliverables include the operation manuals provided to the Facility Manager upon completion.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education & Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to excavate, locate, remove, and repair compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The project includes insulation and a one-year warranty on equipment and workmanship. Bidders must adhere to industry standards, OSHA regulations, and the National Electrical Code and NFPA Standard No. 101. Interested parties must submit their bids by November 6, 2026, to Garrett Owens. A complete proposal must include a detailed cost breakdown on a Bid Sheet, a proposed service schedule, Massachusetts licensing, certificates of insurance, and a completed vendor packet including a W-9 and Anti-Lobbying Certification. The winning bidder must possess an active SAM.gov registration and a Unique Entity ID. This is a small business set-aside opportunity that requires compliance with the Davis-Bacon Act or Service Contract Act, including the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid.
Westover Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Ohio Department of Natural Resources is soliciting bids for the renovation of men's and women's ADA accessible restrooms at Rocky Fork State Park East End Overlook, with a project deadline of March 31, 2025. The scope involves comprehensive upgrades to meet modern safety, health, and accessibility standards, including plumbing replacements with Schedule 40 PVC lines, installation of ADA-compliant fixtures, quartz countertops with porcelain sinks, metal partitions, and durable flooring and wall tiles. The project also requires the design and provision of licensed architect plans, final as-built documentation, and adherence to all applicable local, state, federal, and ADA regulations. The work must be performed by experienced licensed plumbers, with all materials suitable for commercial use, and includes installation of new doors, exhaust fans, and finishing touches such as painting and flooring. Contractors are responsible for site cleanup and must submit invoices directly to the designated state agency. Bidders are required to conduct a site visit prior to submitting their proposals, with the contract being awarded to the lowest responsive and responsible bidder based on a comprehensive evaluation that considers unit costs and estimated usage. The procurement process emphasizes compliance with preferences under Ohio Administrative Code, including Buy American, Buy Ohio, and Veteran-Friendly Business preferences, which can influence scoring. The contract terms are governed by Ohio’s standard terms and conditions, which include provisions on funding, legal compliance, contractor obligations, and termination policies. The project’s delivery and risk transfer details specify FOB destination shipping, with the contractor bearing freight costs unless otherwise arranged. The procurement process is managed through OhioBuys, Ohio’s primary online purchasing platform, and all participating vendors must register and comply with the platform’s requirements, including affirmations regarding offshore services and foreign investments, as outlined in the associated disclosure and affirmation forms.

Documents

7

DAS Standard Terms and Conditions 3-31-25

PDF, High priority: read this first25 pages · standard-terms-and-conditions
High

ODNR Services Agreement Template for OhioBuys Non-Federal Funds

PDF, High priority: read this first31 pages · contract-document
High

RFQ Rocky Fork East End Overlook ADA Accessible Restroom Remodel

PDF, High priority: read this first5 pages · rfq
High

SRC0000034781 - Rocky Fork State Park Restroom Renovation

PDF, High priority: read this first9 pages · rfq
High

Affirmation and Disclosure Form Rev. 3/22

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

OhioBuys Fact Sheet for Bidders and Suppliers

PDF, Low priority2 pages · special-notice
Low

State of Ohio Supplier Operations FAQ and Portal Guide

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DNR353227 Rocky Fork State Park DNRHIG
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Cory CoverSite Visit Coordinator

Full Description

Show more
The Ohio Department of Natural Resources is requesting bids for: Division of Parks and Watercraft Rocky Fork State Park East End Overlook, Men’s and Women’s ADA Accessible Restroom Renovation.Name or Title of the Service: ADA Accessible Restroom Renovation.Ordering Division and address: Rocky Fork State Park East End Overlook 6451 Lucas Lane Hillsboro, OH 45133Project Background: These Renovations and upgrades are necessary to bring this building into modern restaurant building code standards for compliance with health department permitting and liquor licensing. It was constructed in the late 60’s and it’s currently used for non-public larger group events e.g. weddings, school or family reunions, business events. The upgrades are needed for current safety standard compliance and to be able to pass operational inspections for health, safety, and accessibility.Specifications: Remove cast iron drain lines and replace them with schedule 40 pvc lines. See attached photos. Quartz countertops with two (2) porcelain sinks in each restroom. ADA compliant fixtures for each sink. Metal partitions 2 stalls in the women’s restroom with 2 ADA Toilets 1 stall in the men’s restroom with 1 ADA toilet and two urinals.
36” Solid wood entrance doors to each restroom with steel frame H.D. lever handle   Passage push plate Pull handle Egress lock function
VCT flooring – color to be determined by Park Manager. Wall tile up to 4’6” high – color to be determined by Park Manager. Paint ceiling and walls not covered with tile. Exhaust fans in each restroom.
Must Provide Licensed Architect Designed Plans for the Restroom Renovation with Plumbing Upgrades and provide a Final As-Built copy upon completion for the State of Ohio. All materials need to be compliant for commercial use. All materials and installations must meet all Local, State, and Federal Compliance. Also, must be compliant for American Disabilities Act metrics. Work to be completed by experienced licensed plumber to ensure the passing of all required building inspections and permitting before, during and upon completion of project. Contractor responsible for removal and cleanup.
Project Completion: 3/31/2025F.O.B. DESTINATION/PRE-PAID/ALLOWED. The Contractor must provide Deliverables under this Contract F.O.B. Destination/Pre-Paid/Allowed. The place of destination will be specified by the Ordering Agency on the agency’s purchase order or other ordering document. Cost of the freight must be borne and paid by the Contractor unless otherwise stated.All risk of loss, regardless of the cause, will remain with the Contractor until title to the Deliverable passes to the State. Unless otherwise provided in this Contract, the State will determine whether the Contractor provided each Deliverable required in this Contract and has fully met all work requirements of this Contract. Title to any Deliverables will pass to the State on Acceptance of the Deliverable.Evaluation.  The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award.  The contract will be awarded to the lowest responsive and responsible bidder by low lot total.  Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsiveSite Visit & Point of Contact:Prior to submitting a bid response, offerors are required to visit the Site. Site visits are available by appointment only Mon through Fri from 8:00am-3:30pm by contacting Cory Cover, contact@example.gov,  +1 (555) 000-0000 to schedule. Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Preferences. The State will apply all preferences pursuant to Ohio Administrative Code 123:5-1-06.Following the initial evaluation and scoring, all Proposals will be considered for preferences.  Preferences will be calculated at a rate of five percent (5%) for the first preference and two percent (2%) each for the second and third preferences.  The preferences shall be combined and applied as a total percentage of the original Proposal to determine the score for evaluation purposes.Preferences will only be applied if there is at least one Offeror that does not qualify for that particular preference.  For purposes of qualifying for a preference, an Offeror failing to complete the certification for each preference will be deemed as not qualifying for that preference.(a) For the Buy American preference, if any Offeror offers a product that is not a domestic source end product, the State will add the applicable percentage of the total available points to the total score of each Offeror offering a domestic source end product.(b) For the Buy Ohio preference, if any Offeror is a Buy Ohio Offeror claiming the preference, the State will add the applicable percentage of the total available points to each Buy Ohio Offeror’s total score.(c) If claiming the preferences in (a) and (b) based on the product(s) offered, an Offeror is only eligible to receive the preference if the cost of the product(s) offered exceeds 50% of the total offered cost for products and services.  A Buy Ohio Offeror is also eligible to receive the Buy Ohio preference based on its significant economic presence in Ohio or a border state.(d) For the Veteran-Friendly Business preference, the State will add the applicable

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS