Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rocky View County - Invitation to Bid - ITT 26-001 TR250 Realignment TENDER FINAL

Closed
AB-2026-01418International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group is forecasting a construction contract for fast electric vehicle charging infrastructure for its fleet operations, with the solicitation expected to be released in the near future. The project falls under NAICS code 237310, which categorizes it as electrical and other construction services, indicating that it will involve site preparation, electrical system installations, and potentially associated civil works for charging stations. The contract will be managed by the Port of Seattle as the lead agency, with the primary point of contact being Angela Peterson, who can be reached via phone or email for inquiries, and Katie Techa serving as the project manager for technical coordination. The work is anticipated to take place at locations under the Port’s operational control related to fleet vehicle use, though specific sites have not yet been defined. There are no details provided on set-aside provisions, indicating the opportunity may be open to all eligible contractors. The posting date suggests the formal solicitation will follow in 2026, allowing potential vendors time to prepare proposals aligned with the Port’s sustainability and fleet electrification goals. Interested parties should monitor the provided UI link for updates and the official solicitation when it becomes available.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will focus on upgrading the entry and exit drives along 19th Avenue West, demolishing the remaining slab of the Downie Building (C-14), and replacing its footprint with a mix of new parking, green space, and pollinator habitat, potentially incorporating a stormwater treatment facility. Existing pavement in poor condition will be milled and overlaid, while stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines to dedicated storm lines, with water quality treatment applied to qualifying pavement areas. A new irrigation system will support the landscaped green spaces, including the renovated median within the entry drive, and electric vehicle charging stations will be installed in the new parking area. The project also includes the addition of a protected two-way bike lane linking the terminal entry to the existing West Wall bike path, along with enhanced pedestrian connections to the intersection of 21st Avenue West and W Emerson Place and the nearby King County Metro bus stop. Improved lighting will be installed throughout the new parking area and connecting paths, and new wayfinding elements will guide pedestrian and bicycle traffic. All work is being led by the Port of Seattle through its Waterfront Project Management team, with the project classified under NAICS code 237310 for heavy and civil engineering construction, and the solicitation is forecasted for release in July 2026, with Mike Van Cleve and Terrence Moody listed as primary contacts.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of asphalt paving, striping, and related infrastructure work across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. Work includes new asphalt placement and patching, overlays with fabric, crack sealing, seal coating, profile grinding, spoil hauling and disposal, removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous materials, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and enhancements to road drainage systems which may necessitate permitting. All tasks are to be executed under a unit price framework scheduled for performance in 2026, with specifications designed to ensure comprehensive surface maintenance and improvement across Port-controlled properties. The contract is managed by Port Construction Services under the Port of Seattle, with primary point of contact Heather Bowden available via phone and email for inquiries, and Lesley Miles serving as the project manager. Although no solicitation number is provided and the posting date is listed as July 26, 2026, the document is classified as a forecast, indicating this is a planning notice rather than an active procurement. The NAICS code 237310 confirms the scope falls under Highway, Street, and Bridge Construction, and all work is to be conducted at various locations within the Port’s jurisdiction without restriction to a single site.
Port Construction Services

POSTED

about 4 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
CDBG Project #51-04-25 - Studio Fitness Court Park Equipment InstallationSealed bids for the CDBG Project #51-04-25, Studio Fitness Court Park Equipment Installation at 100 Garrett Road, Upper Darby, PA 19082, will be accepted electronically via the PennBid platform until August 13, 2026, at 4:00 PM EST, with no physical opening. The scope is limited to the installation of Studio Fitness Park Equipment only, and all bids must comply with the contract documents including site plans, demolition and repair details, and technical specifications. Bidders are required to submit a bid bond equal to 10% of the bid amount, and the successful bidder must provide a performance bond and a labor and materials bond each at 100% of the contract value, as well as a maintenance bond of 25% up to $200,000 plus 10% on any excess. The award will be made to the lowest responsible bidder on a lowest price technically acceptable basis, with the owner retaining the right to reject any or all bids. This project is federally funded through HUD, triggering Davis-Bacon Act wage requirements for contracts over $2,000, Section 3 participation requirements for contracts over $200,000, and Buy American Act obligations for iron, steel, and other specified construction materials. All subcontractors require prior written approval, and certified weekly payrolls must be submitted under Davis-Bacon regulations. Bidders must also comply with EEO, ADA, and environmental regulations, and must submit complete electronic proposals including bid forms, subcontractor lists, insurance certificates, responsibility certifications, and bid bonds through PennBid. A fee of 0.0033% of the contract value up to $5,000 is due to PennBid upon award. Work must begin no later than April 15, 2026, and be completed by July 14, 2026. All materials must meet approved standards, substitutions require written permission, and performance will be inspected and accepted on-site based on density and mixture testing criteria. No CAGE code or AAC/TAS/ACRN information is provided, payment processes are not detailed, and no COR or COTR is listed, though oversight is assigned to HUD or its designee. Bidders must be registered with a UEI and complete all affirmative certification forms, though no socioeconomic status or Section 3 designations are claimed in the submitted documentation.
Delaware County

POSTED

about 23 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
International
2026 Territorial Drive Widening - Phase 1 & 2The 2026 Territorial Drive Widening Phase 1 & 2 Project aims to enhance traffic operations, safety, and capacity along a major corridor in the City of North Battleford, Saskatchewan. Phase 1 focuses on widening the intersection of Territorial Drive and the adjacent Service Road to increase turning radii and pavement width, improving maneuverability for all vehicles, particularly large commercial trucks, transit buses, and emergency vehicles, while also including a pavement overlay on the southbound lanes to extend their service life. Phase 2 extends the widening efforts northbound from the Carlton Trail intersection to the Airport Road intersection, adding lane width to improve traffic flow and reduce congestion on this heavily used stretch of roadway. The project is being executed in two distinct phases to ensure systematic improvements across the corridor while minimizing long-term disruption. All qualified contractors are invited to submit bids to perform the work as the Prime Contractor, with proposals due to the City Clerk's Department by August 6, 2026, either by mail or email. Questions regarding the bid documents must be submitted by August 4, 2026. The solicitation is identified by number 20260724 and was posted on July 25, 2026, with the formal closing time set for 8:30 PM on the due date. Bids must be directed to the City Clerk’s Department at 1291-101st Street, PO Box 460, North Battleford, SK S9A 2Y6, or emailed to tenders@cityofnb.ca, with the City Clerk’s Department serving as the primary point of contact for all inquiries.
City of North Battleford

POSTED

2 days ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves the realignment and upgrading of Township Road 250 in the Coenrich community of Eastern Rocky View County, Alberta. The project is divided into several schedules covering distinct sections and timelines. Schedule A entails work from 0+165 to 2+330 west of the Canadian National Railway (CN) crossing and includes grading, concrete work, pavement, signage, traffic signals, streetlighting, and other roadway improvements, to be completed by October 15, 2026. Schedule B covers the section east of the CN crossing from 2+340 to 2+633 and mirrors much of the work in Schedule A but is contingent on ATCO Transmission upgrades; this portion is aimed for completion by October 15, 2026, but may be deferred. If delayed, Schedule C replaces Schedule B with a completion deadline of August 15, 2027. Schedule D involves developer utility crossings installed concurrently with Schedule A and is also set to conclude by October 15, 2026. The contract submission deadline is March 24, 2026, and is managed by Rocky View County under the Government of Canada. Coordination with ATCO is critical for scheduling the eastern segments of the project, ensuring utility upgrades precede road construction in those areas. The work encompasses a comprehensive scope of road infrastructure developments to enhance safety, traffic flow, and service delivery across these defined segments of Township Road 250. The contractor will receive survey layouts and plans specifically for utility crossings, and clear notifications regarding scheduling adjustments for the eastern roadwork will be issued by mid-June 2026 if required.

General Info

Realignment and upgrading of Township Road 250 in Alberta, with phased schedules and utility coordination.

Agency

Government of Canada → Rocky View County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Rocky View County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Rocky View County
Office AddressN/A
Contacts
Indra GhoshContracting Authority

Full Description

Show more
The tender is for of the realignment and upgrading of Township Road 250 in the Coenrich community of Eastern Rocky View County. • SCHEDULE ‘A’ – Township Road 250 Realignment from 0+165 to 2+330 (West of CN Crossing) • SCHEDULE ‘B’ – (Interchangeable with Schedule ‘C’) - Township Road 250 Realignment from 2+340 to 2+633 (East of CN Crossing) – work to be completed in 2026 in unison with Schedule ‘A’ • SCHEDULE ‘C’ – (Interchangeable with Schedule ‘B’) - Township Road 250 Realignment from 2+340 to 2+633 (East of CN Crossing) – work to be completed in 2027 independent from Schedule ‘A’ • SCHEDULE ‘D’ – (Deletable Schedule) - Developer Utility Crossings to be installed in unison with Schedule ‘A’ Schedule ‘A’ construction limits of Township Road 250 are from 165 m east Range Road 285 to the Canadian National Railway right of way. This schedule will consist of grading, concrete works, granular base course, asphalt concrete pavement, signage, traffic signals, streetlighting, roadway lines and other work. All work to be completed by October 15, 2026. Schedule ‘B’ construction limits of Township Road 250 are from the Canadian National Railway crossing, tie-in to existing Township Road 250 approximately 300m east of the Canadian National Railway crossing. This schedule will consist of grading, concrete works, granular base course, asphalt concrete pavement, signage, roadway lines and other work. The work shall not take place until the completion of the ATCO Transmission upgrades. The Owner and the Consultant are working with ATCO to confirm the schedule and when this phase of work will be completed. All work to be completed by October 15, 2026. If work in this schedule needs to be carried over into 2027 the contractor will be notified by June 15, 2026, that Schedule ‘C’ will be used in place of Schedule ‘B’ and all work will be completed in 2027. Schedule ‘C’ construction limits of Township Road 250 are from the Canadian National Railway crossing, tie-in to existing Township Road 250 approximately 300m east of the Canadian National Railway crossing. This schedule will consist of grading, concrete works, granular base course, asphalt concrete pavement, signage, roadway lines and other work. The work shall not take place until the completion of the ATCO Transmission upgrades. The Owner and the Consultant are working with ATCO to confirm the schedule and when this phase of work will be completed. All work to be completed by August 15, 2027. Schedule ‘D’ Developer Utilities crossings to be installed when Schedule ‘A’ is being constructed. Plans and survey layout will be provided to the contractor for Developer Utility installation. All work to be completed by October 15, 2026.