Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Z--ROMO ROAD STRIPING

Awarded
140PS126Q0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, designated as 140PS126Q0022, seeks a firm-fixed price quote for comprehensive road striping services across Rocky Mountain National Park under the NAICS code 237310, with a strict 100% total small business set-aside requiring offerors to be self-certified as small businesses under the $45 million size standard and maintain active SAM registration throughout the entire procurement lifecycle. The work encompasses striping roadways, intersections, parking areas, crosswalks, arrows, stop lines, highway numbering, hatched areas, and accessible parking spaces in full compliance with MUTCD standards and Section 02618: Pavement Marking specifications. All materials must meet stringent packaging and labeling requirements including manufacturer details, batch numbers, date of manufacture, and color identification, with paints delivered in undamaged, sealed containers subject to rejection if compromised. Proposals must include a lump sum price covering all labor, materials, indirect and direct costs, and anticipated travel, structured across a base CLIN and three optional CLINs, with unbalanced pricing potentially leading to rejection. Technical proposals are evaluated under a Lowest Price, Technically Acceptable (LPTA) methodology, with mandatory pass/fail gates requiring submission of a logical draft schedule from Notice to Proceed to completion, a listing of key personnel including Safety and Superintendent roles with supporting narratives, and a brief explanation of compliance with MUTCD standards. Failure to meet any technical subfactor results in automatic disqualification. The contract includes far-reaching compliance mandates such as adherence to OSHA safety regulations, the Buy American Act, prevailing wage rates as outlined in the Construction Wage Determination, and limitations on subcontracting as specified in FAR 52.219-14, with performance and payment bonds required under FAR 52.228-15. Contractors must submit electronic invoices via the Treasury’s IPP system, provide payrolls and SF 1413 acknowledgments for subcontractors, and deliver as-built drawings, warranty documents, and signed releases of claims for final payment. All work must protect environmental features, including streams and stormwater paths, maintain ADA/ABA accessibility standards, and avoid disruption to park operations, with inspections conducted at all times and locations free of charge to the government but at the contractor’s expense, and no inspection by the government constituting acceptance. The solicitation closes on July 16, 2026, at 9:00 PM ET

General Info

Department of the Interior seeks road striping services, open bid, deadline June 25, 2026, Washington DC.

Contract Value

$92,715.83

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

DC, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 0001 to Solicitation 140PS126Q0022

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140PS126Q0022

PDF, High priority: read this firstamendment
High

Attachment 1 - Statement of Work for Rocky Mountain National Park Roadway Striping

PDF, High priority: read this firstsow
High

Attachment 2 - Maps and Drawings for Rocky Mountain National Park Pavement Marking

PDF, High priority: read this firstspecifications
High

Report on Limitations on Subcontracting Template for Solicitation 140PS126Q0022

XLSX, High priority: read this firstlimitations-on-subcontracting-template
High

RFI Responses Document 0002

XLSX, High priority: read this firstq-and-a
High

Solicitation 140PS126Q0022 Road Striping at Rocky Mountain National Park

PDF, High priority: read this firstrfq
High

Wage Determination CO20260014 for Colorado Highway Construction

PDF, High priority: read this firstwage-determination
High

Attachment 5 - Q&A Document

XLSX, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Jun 25, 2026 to Jul 16, 2026. The notice title changed.

Deadline changed

Response deadline time changed from 9:00 PM UTC to 7:00 PM UTC on Jul 16, 2026.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Nps Conops Strategic DOI
Contacts1 person available
OfficeWashington, DC, 20240, USA
Office AddressWashington, DC, 20240, USA

Full Description

Show more
ROMO-ROAD STRIPING

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of The Interior → Nps Conops Strategic DOI

Same awarding agency

NAICS: 237990
Federal
Z--ALPO STABILIZATION OF STAPLE BEND TUNNEL
Solicitation # 140P4226R0026
Solicitation 140P4226R0026 is a 100% Small Business Set-Aside, Firm-Fixed Price contract issued by the National Park Service for the stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site in Johnstown, Pennsylvania. The scope of work includes the development of a stabilization maintenance plan, rock scaling of 3,528 square feet, installation of 14 rock bolt anchors, 180 cubic yards of void fill concrete, 2,310 square feet of gunite, 2,500 linear feet of drainage, and a fossil inventory. The project also requires the installation of signposts and adherence to strict historic preservation and environmental protections, including the retention of an NPS-approved paleontologist if resources are discovered and compliance with bat protection measures. The period of performance is scheduled from November 9, 2026, to December 31, 2027, with a delivery timeline of 190 days after the notice to proceed. Award will be based on the Lowest Price Technically Acceptable process, evaluating technical capability and price. Offerors must provide a bid bond of 20% of the bid price or 3 million dollars, whichever is less, and demonstrate compliance with limitations on subcontracting. Contractors must adhere to Davis-Bacon Act wage standards, OSHA safety requirements, and specific sustainability mandates, including the use of biodegradable or recyclable packaging and materials with at least 10% recycled content. Proposals must be submitted electronically as separate technical and pricing files to the designated point of contact by October 30, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS