This Solicitation opportunity from Florida was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Roof Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Palm Coast has issued a solicitation for a comprehensive shingle roof replacement at the Utility Administration Facility located at 2 Utility Drive, Palm Coast, Florida. The project involves removing all existing shingle layers down to the sheathing, disposing of debris, and replacing any decayed wood, including rafter ends and fascia, with pressure-treated lumber. About 20 to 25 sections of fascia will be replaced, and three solar attic fans will be installed to improve ventilation. The contractor is required to nail down all solid decking with #8 ring shank nails in accordance with state code, and to overlay the entire roof with a self-adhering secondary water barrier underlayment system for added protection. New aluminum drip edges will be installed around the perimeter and ridge vents, along with lead flashing and vents in bathroom, kitchen, and utility areas. The roofing material specified is 130 MPH architectural shingles, which must be securely fastened to ensure durability and compliance with safety standards. The contract, posted on July 24, 2025, has a response deadline of August 8, 2025, and is valued between $50,000 and $150,000. Interested bidders can schedule site visits by contacting James Parker via email. The project falls under NAICS code 238160 and is managed by the Florida-based Palm Coast organization. Additional details and the solicitation can be accessed through the provided online link.
General Info
Timeline
Submission Closed
Organization & Contact Information
Full Description
SHINGLE RE-ROOF 1. TEAR OFF ALL LAYERS OF EXISTING SHINGLE ROOF DOWN TO SHEATHING, AND REMOVE ALL DEBRIS FROM PREMISES.
2. REPLACE ALL DECAYED WOOD, INCLUDING RAFTER ENDS AND FASCIA. (WOOD AND LABOR
3. REPLACE APPROXIMATELY 20 - 25, 14 FT. SECTIONS OF FACIA WITH 2 X 12, PRESSURE TREATED FACIA.
4. FURNISH & INSTALL THREE SOLAR ATTIC FANS.
5. NAIL OFF ALL SOLID DECKING A WITH # 8 RING SHANK NAILS AS PER STATE CODE.
6. OVER CLEAN SOLID DECKING INSTALL A SELF ADHERING SECONDARY WATER BARRIER SHINGLEUNDERLAYMENT SYSTEM OVER ENTIRE ROOF.
7.INSTALL NEW ALUMINUM DRIP EDGE AROUND ENTIRE PERIMETER AND RIDGE VENTS, AS REQUIRED.
8. INSTALL NEW LEAD FLASHING AND VENTS AT ALL BATHROOM, KITCHEN, AND UTILITY AREAS
9. FURNISH AND INSTALL, 130 MPH ARCHITECTURAL SHINGLES, SECURELY FASTENED
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
