Roof Retrofit Project - Pueblo Ice Arena

Closed
26-023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves a roof retrofit project for the Pueblo Ice Arena, which sustained hail damage necessitating replacement. The work must comply with the City of Pueblo’s adopted 2021 building codes, specifically sections from the International Existing Building Code (IEBC), International Building Code (IBC), and International Energy Conservation Code (IECC), all allowing for the recovery of the existing roofing system rather than full removal. The current roof assembly consists of a wood deck, two layers of 1.5-inch polyisocyanurate insulation, a half-inch Dens-Deck prime mechanically attached, and a 50 mil KEE roof membrane adhered on top. The solicitation, posted by the City of Pueblo Public Works department, has a response deadline in March 2026 and seeks qualified contractors to perform the work in compliance with the specified codes and project requirements. The contract documents formalize obligations between the City and contractor, including performance and payment bonds to guarantee project fulfillment and payment security. Contractors must comply with local licensing and tax regulations, including a mandatory 3.7% sales and use tax with prepayment requirements for contracts exceeding $100,000. Additionally, federal labor standards and reporting requirements apply to ensure wage compliance and transparency, including adherence to the Federal Funding Accountability and Transparency Act (FFATA). The City also emphasizes compliance with HUD’s Section 3 regulations, promoting workforce and business opportunities for low- and very low-income populations through employment and contracting on the project. Overall, the contract requires adherence to strict technical, legal, financial, and regulatory standards to ensure the successful restoration of the Ice Arena roof while supporting community economic inclusion.

General Info

Roof retrofit for Pueblo Ice Arena with hail damage, following 2021 codes, bonding, taxes, and labor compliance.

Place of Performance

CO, USA

Set-Aside

NONE

Documents

11

26-023 Pueblo Ice Arena Thermoplastic Roofing Specifications

PDF, High priority: read this firstspecifications
High

CDOT Contractors Performance and Anti-Collusion Forms

PDF, High priority: read this first10 pages · contract-document
High

Federal Labor Standard Provisions for Construction Contracts

PDF, High priority: read this first10 pages · wage-determination
High

IFB 26-023 Roof Retrofit Project - Pueblo Ice Arena

PDF, High priority: read this firstifb
High

Pueblo Ice Arena Roof Retrofit Drawings

PDF, High priority: read this firstspecifications
High

Pueblo Ice Arena Roof Retrofit Project Summary of Work Update

PDF, High priority: read this firstsow
High

Sample Contract Documents - City of Pueblo

PDF, High priority: read this first8 pages · contract-document
High

Section 3 Utilization Plan - City of Pueblo HUD Compliance Guide

PDF, High priority: read this first16 pages · policy-guide
High

FFATA Reporting Form for City of Pueblo

PDF, Low priority1 page · other
Low

FFATA Reporting Form for City of Pueblo

PDF, Low priority1 page · ffata-reporting-form
Low

Licensing and Sales Tax Information for Construction Contractors in Pueblo

PDF, Low priority6 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Public Works
Contacts2 people available
OfficePueblo, CO, 81003, USA
Organization / AgencyColorado → Public Works
Office AddressPueblo, CO, 81003, USA
Contacts
Bob QuintanaCivil Engineer Public Works
Deborah RiveraPurchasing Contract Administrator

Interested Companies (8)

B & M Roofing of ColoradoFrederick, CO
WeathercraftFountain, CO

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The roof on the Ice Arena has sustained hail impact damage requiring replacement. Based on the City of Pueblo's adopted 2021 codes, section 705.2.1 of the IEBC, Sections 1512.2.1 and 1512.2.1.1 of the IBC and section 503.1.1 of the IECC all allow for a recover of the existing roof system. The existing roof construction consists of a wood deck, 2 layers of 1.5" polyisocyanurate insulation, one layer of ½" Dens-Deck prime, mechanically attached and the adhered roof membrane is a 50 mil KEE roof system.

More opportunities from Colorado → Public Works

Same awarding agency

NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo has issued Invitation for Bid 26-035 for the West Side Improvements - Bus Stops Package 1, a project focused on enhancing community connectivity, mobility, and ADA compliance. Funded by a U.S. Department of Transportation Federal Highway Administration RAISE Grant, the scope of work involves the rehabilitation of 23 existing bus stops. Key deliverables include the installation of new concrete pads, sidewalks, curb and gutter, upgraded curb ramps, benches, and illuminated signs. The project is governed by the Colorado Department of Transportation 2025 Spec Book and requires strict adherence to Buy America and Build America Buy America requirements for projects receiving $500,000 or more in federal-aid highway funding. Bidders must be registered on SAM.gov and are required to perform at least 30 percent of the total original contract price with their own organization. Compliance with the Davis-Bacon Act for prevailing wages, as well as federal nondiscrimination and EEO standards, is mandatory. Submissions must be made electronically via the OpenGov portal and must include a bid security of 5 percent of the grand total bid. The contractor is responsible for a two-year warranty on all materials and workmanship from the date of final acceptance. Additionally, contractors must comply with City of Pueblo licensing and sales tax requirements, including mandatory tax prepayments for contracts valued at $100,000 or more.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the construction of Sun Mountain Boulevard, a project designed to improve community connectivity and economic vitality. The scope of work involves constructing a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert. This effort is part of the broader West Side Improvements Project, which also includes the implementation of 67 bus stop locations. The project is funded through a Federal Highway Administration RAISE Grant, necessitating strict adherence to federal regulations, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America requirements, and FHWA-1273 contract provisions. The contract will be awarded to the responsible bidder providing the lowest responsive bid. Bidders must submit their proposals electronically via OpenGov by October 21, 2026, accompanied by a bid security of 5 percent of the total bid. Successful contractors must provide performance and payment bonds within ten business days of the award and comply with various certifications, including non-collusion, tax liability, and EEO requirements. Performance is governed by the 2025 CDOT Spec Book and project-specific special provisions, with a two-year warranty on all materials and workmanship. Additionally, contractors must adhere to City of Pueblo licensing and sales tax regulations, including a 3.7 percent sales and use tax.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 238160
New
SLED
Roof Replacement - 442 Keeler Parkway
Solicitation # 26-056
Solicitation 26-056 is a lump sum contract issued by the City of Pueblo Public Works department for the roof replacement at 442 Keeler Parkway in Colorado. The project involves the removal and disposal of the existing roof system and insulation down to the concrete deck, followed by deck preparation and the installation of a 60-mil TPO roof system. Key deliverables include the installation of 24-gauge galvanized sheet metal slip type counter-flashings, replacement of overflow scuppers, penetration flashings, roof jacks, VTR flashings, rain collars, and damaged drain rings, as well as the installation of a new walkway. The completed work must include a 20 year NDL warranty and adhere to all manufacturer requirements. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid, based on the total base bid plus any selected alternates, such as upgrading to a 1/2 inch Dens Deck cover board or fleece backed TPO membrane. Bidders must submit responses via OpenGov by October 28, 2026, including a bid security of 5 percent of the grand total bid. The successful contractor must provide payment and performance bonds within ten business days of the award and commence work within three calendar days of contract execution. Administrative requirements include compliance with the Davis-Bacon Act, HUD Section 3 utilization for labor, and various non-discrimination and safety regulations. Payments are based on the actual number of units installed and are processed by the 21st day following the approval of a detailed monthly estimate by the Engineer. Final acceptance is contingent upon approval from the Southern Colorado Building Department and the Facilities Maintenance Superintendent. Builder's risk insurance is required with a maximum permitted deductible of 2,500 dollars.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in about 9 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS