Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Roofing & Rainwater Systems

Open
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GBR

Set-Aside

NONE

Documents

This scope was carved out of P1417.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

External Cyclical Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorthern Ireland Housing Executive
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and repairs roof coverings and rainwater goods for prime contractors on Northern Ireland Housing Executive (NIHE) residential maintenance projects. Performs installation, repair, maintenance, and replacement of roof coverings, fascias, bargeboards, soffits, and rainwater goods including gutters and downpipes. Delivers a fully sealed and functioning roof and drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
47971 HVAC
Solicitation # 47971
Solicitation 47971, issued by the New York State Office of General Services Design and Construction Group, seeks a contractor for construction, HVAC, and electrical work to replace the roof and associated mechanicals at the Troop F Headquarters located at 55 Crystal Run Road in Middletown, New York. The scope of work includes the removal and secure offsite storage of rooftop units and associated accessories, the installation of natural-gas piping and manual shutoff valves, and the replacement of the roof system. Key technical requirements include maintaining a waterfit condition at all roof areas throughout the project and adhering to specific material updates, such as the use of 20oz continuous copper for expansion joint coping. The project is governed by strict quality and safety standards, requiring natural-gas piping to be tested and purged according to NFPA 54 and welding to be qualified under AWS D1.1 for steel and the ASME Boiler and Pressure Vessel Code for piping. Contractors are responsible for providing all necessary tools and materials, obtaining required occupancy permits at their own expense, and ensuring all installations follow manufacturer recommendations. Additional requirements include the removal and resetting of furniture and portable equipment, as well as specific identification and protective coating standards for interior metal HVAC piping. Work may only commence upon written authorization from the owner.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238160
New
Federal
Gutter Maintenance
Solicitation # 36C26027Q0122
The Department of Veterans Affairs, through Network Contracting Office 20, is conducting market research via a Sources Sought Notice for roof drainage and gutter maintenance at the American Lake VA Medical Center in Tacoma, Washington. The project focuses on Building 200, where the scope involves cleaning and sealing joints for approximately 100 feet of gutter system across three areas, installing two to three downspouts with splash blocks, and performing water testing. The period of performance is estimated at 120 days following the award, with a strong emphasis on safety requirements, including the mandatory use of safety harnesses for all personnel on the roof and strict equipment storage protocols to ensure patient safety and visibility. The project requires a high level of documentation and oversight, including a Contract Management Plan, daily progress reports from the foreman, and photographic evidence of each stage of demolition and installation. Final acceptance is contingent upon a water test and a subsequent interior inspection conducted 24 hours later. This opportunity is designated as a Small Business Set-Aside. Interested parties must submit a capabilities statement by November 25, 2026, including their SAM Unique Identifier, business size, an affirmation of their ability to meet the Statement of Work and subcontracting limitations, and at least one example of relevant past performance.
260-NETWORK Contract Office 20 (36C260)

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Northern Ireland Housing Executive

Same awarding agency

NAICS: 236118
New
International
External Cyclical Maintenance
Solicitation # P1417
The Northern Ireland Housing Executive is soliciting bids for External Cyclical Maintenance works under solicitation P1417, with an estimated total value of £35,283,515 excluding VAT. The contract is expected to run from March 1, 2027, to December 1, 2032, covering three regional lots: the South Region North Down and Ards Area, the North Region Mid and East Antrim Area, and the South Region South Down Area. The scope of work is comprehensive, encompassing professional survey and design services, customer consultation, and the installation, repair, and maintenance of structural components such as roof coverings, fascias, rainwater goods, windows, external doors, and fire safety measures. Additionally, the contract includes cyclical redecoration of external surfaces and common areas, pre-decoration repairs, and the management, removal, and disposal of asbestos-containing materials discovered during the works. Award decisions will be based on a weighted evaluation consisting of 70% price and 30% quality, with the quality portion split between delivery quality, contract management, and social value methodology. The procurement is governed by the Procurement Act 2023 and falls under the building construction work classification. Interested parties must submit their tenders in English via the electronic portal by December 14, 2026, at 3:00pm. The contracting authority reserves the right to make additional purchases throughout the duration of the contract.
Residential Remodelers

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS