Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roofing Material Supply (60 mil PVC KEE Membrane, Insulation, Metal Coping)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 327120
SBIR / STTR
Metals and Ceramics
Solicitation # NSF 26-510
Program solicitation NSF 26-510, issued by the National Science Foundation Directorate for Technology, Innovation and Partnerships on May 22, 2026, seeks proposals for the Small Business Innovation Research and Small Business Technology Transfer Phase I, Phase II, and Fast-Track programs. This total small business set-aside opportunity focuses on developing deep technologies to advance U.S. competitiveness and security by transforming high-risk, high-impact research into market-ready products and services. With an anticipated total funding amount of 210 million dollars, the program supports a wide range of technology areas and market sectors to stimulate economic growth and job creation. Funding is available across several categories, including Phase I grants up to 305,000 dollars, Phase II cooperative agreements up to 1.25 million dollars, and Fast-Track awards up to 1.555 million dollars. Additionally, Phase IIB supplements range from 50,000 to 500,000 dollars, TECP supplements are capped at 20 percent of the Phase II award, and Strategic Breakthrough proposals may request up to 30 million dollars. Proposals are evaluated based on intellectual merit, broader impacts, and commercial potential, with a preference for institutions with lower indirect cost rates if merit reviews are equal. The submission process is managed through Research.gov, with multiple proposal deadlines occurring between July 2026 and July 2027. Companies are limited to two project pitch submissions per year, and Phase II eligibility is restricted to previous NSF Phase I awardees. All participants must comply with the Proposal and Award Policies and Procedures Guide, research security policies, and the CHIPS and Science Act of 2022 regarding persons or entities of concern. This solicitation replaces previous versions NSF 24-579, 24-580, and 24-582.
National Science Foundation

POSTED

6 months ago

DEADLINE

in 8 months

AI Contract Overview

Show more

The contract requires the supply of 60 mil PVC KEE membrane, insulation boards, and pre-finished metal coping and counterflashing for a commercial roofing application, all of which must meet UL and FM certification standards to ensure compliance with rigorous safety and performance requirements. The materials are intended for use in a professional roofing system where durability, weather resistance, and fire safety are critical, and all components must be compatible and installed to maintain system integrity over the long term. This is a subcontract solicitation issued by Augusta University under NAICS code 327120, which pertains to clay, stone, and concrete product manufacturing, indicating the procurement is focused on specialized building materials. The opportunity was posted on April 29, 2026, with a response deadline of May 29, 2026, at 3:00 PM, giving prospective suppliers approximately one month to prepare and submit bids. The place of performance and specific location details are not provided, but the project is tied to Georgia-based facilities under the university’s purview. Bidders must ensure their proposed materials meet all technical and certification benchmarks without deviation to be considered eligible.

General Info

Supply of UL/FM-certified commercial roofing materials for Augusta University subcontract, bid due May 29, 2026.

Documents

This scope was carved out of PE-51200-RFQ-2026-000000036.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Christenberry Fieldhouse Roof Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Silty Clay Soil SupplierOpen now, due in 22 days
  • Metals and CeramicsOpen now, due in 232 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Augusta University
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → Augusta University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of 60 mil PVC KEE membrane, insulation boards, and pre-finished metal coping and counterflashing meeting UL and FM standards for commercial roofing application.

More opportunities from Georgia → Augusta University

Same awarding agency

NAICS: 238210
SLED
Interdisciplinary Research Building ¿ Replacement of the Fire Alarm System
Solicitation # PE-51200-RFQ-2027-000000040
Augusta University, through the Board of Regents of the University System of Georgia, is soliciting Construction Manager/General Contractor (CM/GC) services for Project No. J-473 to replace the fire alarm system in the Interdisciplinary Research Building (IRB). The IRB is a 211,000 gross square foot facility that houses a significant portion of the Health Science campus's research laboratories, lab services, and animal facilities. The existing system is over 30 years old and contains obsolete components. The scope of work includes the complete replacement of the fire alarm panel, sensors, horns, strobes, detectors, and the communication backbone, as well as integrating the new system into the existing campus fire alarm mesh network. The estimated construction cost for the project is 3,670,000 dollars, and the contract will be structured as Actual Cost plus a Fixed Fee, not to exceed a Guaranteed Maximum Price. The selection process is a two-step evaluation consisting of a Statement of Qualifications to identify finalists, followed by project proposals and interviews. Eligible firms must hold a valid Georgia General Contractor's License, maintain an Experience Modification Rating of 1.2 or less, and demonstrate financial liquidity with a current ratio of 1.0 or higher. Required submittals include various certifications, a contractor affidavit for E-Verify, and a proposer's disclosure statement. The selected CM/GC will be responsible for construction methods, safety, and scheduling coordination, and must provide comprehensive quality assurance and closeout management plans.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 months ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS