Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on October 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT

Closed
W912QR25R0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Louisville District is seeking public comments regarding the potential use of Project Labor Agreements (PLAs) for the Rough River Dam Safety Modification Phase II project, a large-scale construction effort exceeding $25 million. The project involves constructing new outlet works, including a control tower, approach channel, tunnel, stilling basin, and a cutoff wall, along with abandoning existing structures and relocating Highway 79. The scope encompasses extensive excavation, concrete work, groundwater control measures, and foundation modifications, all aimed at enhancing dam safety and operational efficiency. The Corps is considering the use of PLAs, which are collective bargaining agreements with labor organizations, to potentially promote labor stability, safety, and project efficiency, in line with federal policies encouraging their use on large projects. The agency is inviting comments from the construction community on various aspects, including local experience with PLAs, labor availability, scheduling considerations, and the potential benefits or drawbacks of implementing a PLA for this project. Specific questions focus on the local labor market, project timelines, and the overall impact of PLAs on cost and efficiency. Comments are to be submitted via email by June 19, 2025. This outreach aims to gather insights to inform the decision-making process regarding the use of PLAs, ensuring that the project aligns with federal procurement policies and community needs.

General Info

Construction of outlet works and cutoff wall at Rough River Lake; firm-fixed price; HUBZone preference.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119, Falls of Rough, KY, 40119, USA

Set-Aside

NONE

Documents

115

Amendment 0001 for Rough River Dam Modification

PDF, High priority: read this first47 pages · amendment
High

Amendment 0001 for Rough River Dam Modification

PDF, High priority: read this first136 pages · amendment
High

Amendment 0003 - Solicitation W912QR25R0016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Amendment 0004 - Solicitation W912QR25R0016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Amendment 0005 - Solicitation W912QR250016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Amendment 0006 - Solicitation W912QR25R0016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Amendment 0008 - Solicitation W912QR25R0016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Amendment U0009 - Solicitation W912QR25R0016 (Rough River Dam Modification)

PDF, High priority: read this firstamendment
High

Construction Details for Outlet Works Abandonment

PDF, High priority: read this firstspecifications
High

Design Memorandum No. 2 – Outlet Works

PDF, High priority: read this firstsow
High

Geotechnical Data Report Volume 5, Subappendix B1

PDF, High priority: read this firstsow
High

Geotechnical Information Report Vol. 6 Appendix C2b

PDF, High priority: read this firstsow
High

OTW Plans Sheet Notes and Keynotes

PDF, High priority: read this firstspecifications
High

Phase IB Drilling & Grouting Contractor Completion Report, Vol. 6

PDF, High priority: read this firstsow
High

Rough River Dam Dam Safety Modification Phase II - Volume 1B New Outlet Works (OTW) Plans

PDF, High priority: read this firstspecifications
High

Rough River Dam Phase 2 Design Update (Concrete Materials)

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Phase 1 - Construction Materials and Foundation Completion Report

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first943 pages · contract-document
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first10 pages · contract-document
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first30 pages · rfp
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first36 pages · rfp
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first346 pages · contract-document
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first40 pages · contract-document
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first2 pages · contract-document
High

Rough River Dam Safety Modification Phase II

PDF, High priority: read this first16 pages · rfp
High

Rough River Dam Safety Modification Phase II - Volume 3 CTW/STR Plans

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - 1953 Design Memorandum Vol 6 No 1

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Boring Logs and Labs Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Boring Logs Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Construction Materials and Foundation Completion Report

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Construction Materials and Foundation Completion Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Construction Materials and Foundation Completion Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Construction Materials and Foundation Completion Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Design Memo 3

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Final Instrumentation Evaluation Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - Geotechnical Information Report Vol 6 Appendix A

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - GIR Vol 6 Appendix C1a

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - GIR Vol 6 Subappendix B2

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project - GIR Vol 6 Subappendix B5

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase I

PDF, High priority: read this first244 pages · contract-document
High

Rough River Dam Safety Modification Project Phase I - Construction Materials and Foundation Completion Report

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase I - Construction Materials and Foundation Completion Report

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Dam As-Builts Vol. 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Geotechnical Information Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Geotechnical Information Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Geotechnical Information Report Vol 6

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Geotechnical Information Report Vol 6 Appendix C2a

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - GIR Vol 6 Subappendix B3

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Joint Instrumentation and Monitoring Plan (JIMP)

PDF, High priority: read this firstspecifications
High

Rough River Dam Safety Modification Project Phase II - Tunnel GDR Vol 5 Subappendix B2

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA
Contacts
Adyson Medley

Full Description

Show more

ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALLPROJECTThe contractor?s work and responsibility will include all planning, programming, administration, management,supervision, communications and inspection necessary to assure that all work is conducted in accordance with thecontract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.


This is a full and open procurement. This project requires the HUBZone 10% price evaluation. All large businesses shall submit a subcontracting plan.


LOCATION: Rough River Lake, 14957 Falls of Rough Rd, Falls of Rough, KY 40119


In accordance with FAR Clause 52.232-33, method of Payment under this contract will be Electronic FundsTransfer (EFT) to a commercial bank account specified by the contractor. One firm-fixed price award will be madefrom this Solicitation.The offeror shall complete the price breakout. The total evaluated price will be determined by adding the total of allline items from the price breakout schedule. The price will be reviewed by the Government for reasonableness andrealism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors arecautioned to distribute costs appropriately. Award will not be made to offerors who do not provide reasonable andrealistic prices for all line items listed in the price breakout schedule.


Quotes are due on 23 October 2025 at 10:00 AM Eastern Standard Time


You may submit your quote following the PIEE instructions below. Fax submittals will not be accepted.For contractual questions, please follow the ProjNET instruction above.


North American Industry Classification System (NAICS) 237990 This NAICS code shall be listed on the contractor?s SAM account prior to submitting a quote/proposal/bid.All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission ofquote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by ElectronicFunds Transfer ? System for Award Management, which indicates ?All payments by the Government under thiscontract shall be made by electronic funds transfer (EFT).? Those not currently registered can obtain registration bygoing to the website http://www.SAM.gov.Training tools are available on the SAM website to help you get familiar with SAM. Start by going towww.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well asQuick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates ,and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.PLEASE NOTE: SAM is completely free of charge for both registrants and users.

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS