Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rough River LakeAxtel Wastewater Treatment Plant Replacement

Closed
W912QR26R-AXWWTPFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Louisville District, is seeking a firm-fixed-price construction contract for the Rough River Lake Axtel Wastewater Treatment Plant Replacement in Breckinridge County, Kentucky. The project, estimated between $1 million and $5 million, involves the complete demolition and decommissioning of the existing plant and the installation of a new subsurface sewage treatment and dispersal facility. Key construction elements include precast concrete primary pretreatment septic tanks conforming to ASTM C1227 and 902 KAR 10:081/085, a packaged aerobic treatment unit, sewage lift stations, and a soil drip dispersal field. The scope also encompasses the installation of gravity and pressure piping, NEMA 4X stainless steel electrical control enclosures, and site restoration including grading and security fencing. An optional line item for rock excavation is also included. The contract will be awarded via an Invitation for Bids (IFB) and is open to all qualified bidders under NAICS code 237110. Mandatory requirements include a Master Level Onsite Sewage Disposal System Certification from the Commonwealth of Kentucky and the procurement of a construction permit from the Breckinridge County Health Department. The performance period is 400 calendar days, with strict operational constraints: construction impacting campground operations is limited to November 1 through April 14, and tree clearing is restricted to October 31 through March 31 to protect the endangered Indiana Bat. Bidders must provide a 20 percent bid bond, and the successful awardee must provide 100 percent performance and payment bonds. Compliance with the Davis-Bacon Act and E-Verify is required for all personnel.

General Info

US Army Corps of Engineers seeks firm-fixed-price contract to replace Axtel Wastewater Treatment Plant.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

The work site is located within the Rough River Lake Project area at the Axtel Campground, along Highway 79, approximately 0.65, KY, 40119

Set-Aside

NONE

Documents

1

W912QR-26-R-XXXX - Axtel Wastewater Treatment Plant Replacement

DOCX, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts2 people available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more
Description of Proposed Work: The U.S. Army Corps of Engineers (USACE), Louisville District, anticipates issuing an Invitation for Bids (IFB) for a firm-fixed-price construction contract to execute the Rough River Lake Axtel Wastewater Treatment Plant Replacement. The overall scope of work comprises the complete demolition and decommissioning of the existing wastewater treatment plant and the construction of a new replacement subsurface sewage treatment and dispersal facility. Primary features of work include, but are not limited to:Demolition and Removal: Demolition and disposal of the existing Axtel Wastewater Treatment Plant, existing chain-link perimeter fencing, and gravel surfacing.Treatment and Disposal System Construction: Construction and installation of a new subsurface wastewater treatment and disposal system, including: Precast concrete primary pretreatment septic tanks conforming to ASTM C1227 and 902 KAR 10:081/085. Precast sewage lift stations, dose stations, and holding tanks. Packaged Aerobic Treatment Unit (ATU) / Advanced Wastewater Treatment System. Soil drip dispersal field and piping network.Piping and Distribution: Installation of gravity sewer piping and pressure piping networks, including supply/return manifolds, flush valves, and air release/vacuum breaker valves.Electrical and Control Systems: Complete electrical service and distribution, including coordination with Meade County RECC for service drop/upgrades, NEMA 4X (316 stainless steel) control enclosures, UL 1449 Type 2 Surge Protective Devices (TVSS), sequencing reactor controls, alarm systems, and associated conduits.Site and Civil Appurtenances: Rough and finish grading, trenching, erosion and sediment control measures, replacement chain-link perimeter security fence and gates with privacy slats, and site restoration.Optional Features: Contract Line Item Schedule includes an optional line item for Rock Excavation (unit-priced per cubic yard).

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS