Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Route 269 Huron Highway Planting Project (Lake or Streambed Alteration Agreement No. EPIMS-FRE-53614-R4)

Forecast
EPIMS-FRE-53614-R4State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Route 269 Huron Highway Planting Project, identified as Streambed Alteration Agreement No. EPIMS-FRE-53614-R4, is an initiative by the California Department of Transportation, specifically Caltrans District 6, and approved by the California Department of Fish and Wildlife. Pursuant to Section 1602 of the Fish and Game Code, the project involves new highway planting activities along Los Gatos Creek in Fresno County, California, located along Interstate 5 between highway post mile 7.86 and 8.08. These activities are designed to satisfy mitigation requirements for the State Route 269 Bridge: Arroyo Pasajero Improvement Project by planting trees and shrubs to offset the impacts of tree removal within the same stream system. The project includes a five-year plant establishment period, during which a temporary irrigation system will be installed to support the plants for the first three years. Amendment No. 1 to the agreement introduces a specific change regarding the root protector material used in the project. This project is classified as a revegetation planting project and is exempt under California Code of Regulations, title 14, section 15304, Class 4. Primary coordination is managed by Jacob Cantu of Caltrans District 6 and Mindy Trask, a Senior Environmental Scientist with the California Department of Fish and Wildlife.

General Info

Caltrans District 6 highway planting project for stream mitigation in Fresno County, California.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Mindy TraskSenior Environmental Scientist, Specialist
Jacob CantuParty Undertaking Project

Full Description

Show more
The California Department of Fish and Wildlife has amended Streambed Alteration Agreement No. EPIMS-FRE-53614-R4, pursuant to Section 1602 of the Fish and Game Code to the California Department of Transportation. The Project would consist of activities related to new highway planting to satisfy mitigation requirements of State Route 269 Bridge: Arroyo Pasajero Improvement Project (1600-2017-0152-R4). The Project proposed to plant trees and shrubs along Los Gatos Creek. A temporary irrigation system will be installed to aid plants for three years out of a five-year plant establishment period. Amendment No.1 includes a change regarding root protector material.

Similar Contracts

Same NAICS industry code

NAICS: 115112
SLED
AS27-125 Iron Fire Chaining Private and TLA 2026
Solicitation # AS27-125
The State of Utah Division of Wildlife Resources is soliciting bids for the Iron Fire Chaining Private and TLA 2026 project to provide wildfire rehabilitation services in the Tintic Valley area of Tooele County. The project consists of single pass chaining across approximately 1,699 acres to assist in restoration efforts. Participation is strictly limited to pre-qualified contractors who must provide all necessary labor, supervision, and equipment, including two steel tracked crawler tractors with a minimum drawbar horsepower rating greater than 200 and an on-site arc/acetylene welder. The government will provide at least one 240-foot Ely style anchor chain. Work must be performed on the contour at a maximum speed of 4 mph with lateral spacing not exceeding 100 feet, and is prohibited on slopes greater than 35 percent or in soil with moisture exceeding 15 percent. The contract will be awarded to the lowest cost responsive and responsible pre-qualified vendor based on a per-acre price. All work is expected to be completed by December 18, 2026, with a weather-related extension possible until April 30, 2027. Payment will be issued as a single lump sum upon final inspection of the completed acreage. Contractors must maintain commercial general liability insurance of 1 million dollars per occurrence and 3 million dollars aggregate, as well as statutory workers compensation. Additionally, vendors must certify compliance with Utah Code regarding anti-boycott actions, forced labor restrictions, and E-Verify employment status verification. Performance will be evaluated based on quality of service, timeliness, and contract management to determine future eligibility for the rangeland pre-qualification list.
Utah

POSTED

7 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS