Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on April 17, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--provide fencing to protect the Columbarium wall

Awarded
VA78617Q0350Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 5 hours ago

DEADLINE

in about 13 hours
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The project concludes with a final site inspection to ensure all properties are left in a clean, orderly, and safe condition. Proposals are due by November 5, 2026, and must be submitted to the CCT IT Department. The contract term is for an as-needed period not to exceed three years, with payments contingent upon the availability of funds in the tribal treasury. Evaluation is based on a 100-point scale considering reliability, budget, and TERO designations, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. Awardees must provide proof of insurance and sign a certification regarding debarment and suspension. Furthermore, any contract exceeding 100,000 dollars requires a performance bond, otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 561730
New
SLED
Landscaping Services
Solicitation # 260572
The Orange County Transportation Authority is soliciting bids for a one-year landscaping services contract with a budget of 354,050 dollars. This prevailing wage contract requires the contractor to provide comprehensive landscape maintenance, including weed control, pest and insect control, and bi-annual fertilization for slope covers, as well as the legal disposal of all generated debris. Services will be performed across multiple locations, including maintenance and operations bases in Santa Ana, Garden Grove, Anaheim, and Irvine, as well as various transportation centers. The scope includes weekly maintenance, monthly building pest control, and as-needed services such as bird and gopher control and emergency labor. Award will be granted to the responsive and responsible bidder with the lowest weighted sum, calculated as 90 percent for the lump sum total price and 10 percent for the percentage cost mark-up on parts. Bidders must hold a C-27 license from the California Contractor State License Board, a Public Works Contractor Registration number, and specific pesticide and arborist certifications. The contract mandates strict adherence to California Labor Code and Davis-Bacon Labor Provisions, as well as Level 2 Health, Safety and Environmental Specifications. Bids must be submitted via the OpenGov portal by November 2, 2026, with pricing provided specifically in Microsoft Excel format.
F&A-Contracts Administration and Materials Management

POSTED

about 11 hours ago

DEADLINE

in 4 days

General Info

Contract Value

$49,680

NAICS

561730 - Landscaping Services

Place of Performance

VA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cemetery Administration (36C786)
ContactsNo contacts available
OfficeQUANTICO, VA, 22134, USA
Office AddressQUANTICO, VA, 22134, USA
ContactsNo contact information available

Full Description

Show more
Riverside National Cemetery Ornamental Fencing on Van Buren Ave 12/8/2016 Project No.: 901-NRM-FY17-002 Page 4 of 6 Project Title: Install Ornamental Fence on Van Buren Avenue SCOPE OF WORK GENERAL SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment and supplies necessary to perform the work to install 230 lineal feet of iron ornamental fence and 230 lineal feet of 6 thick x 18 wide mow strip. Fencing shall match the existing style, color, material, spacing and dimensions. Provide a 1 ft diameter by 3 feet deep footing for each post. Install posts at 6 -0 O.C. Install a 6 deep x 18 wide mow strip prior to welding fence panels to post. Fence to follow curvature of road/curb and inlaine with existing fence All material will be powder coated to match existing fence. Contractor shall submit a color sample to the COR prior to powder coating for approval. GENERAL REQUIREMENTS All work will be coordinated with the Contracting Officer s Representative (COR) and/or the Cemetery Director. Work will be conducted in such a manner to minimize the impact on the Cemetery operations. All work will be accomplished during normal business hours (8:00 am to 4:30 pm) Monday through Friday, except Federal Holidays, at a time determined by the COR. Only the Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time. Cemetery Director: Pete Young TEL: +1 (555) 000-0000 COR: Edgar LLaneza Facility Maintenance Supervisor TEL: +1 (555) 000-0000 Ext. 811 GENERAL REQUIREMENT 1. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and review the scope of work to determine the extent of the work. The Contractor shall take the necessary precautions to avoid damages to existing items to remain in place, to be reused or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced at the Contractors expense as directed by the COR. 2. The Contractor shall layout the work from established base lines and bench marks and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at the Contractor s expense, all stakes, templates, platforms, equipment tools, materials and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the COR. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established or indicated by COR until authorized to remove them. If such marks are destroyed by the Contractor s negligence before their removal is authorized, the COR may replace them and deduct the expense of the replacement from any amounts due to the Contractor. 3. Establish construction limits, install safety controls, and install construction fencing as approved by the COR. 4. SITE SURVEY: Locate and stake/flag all underground utilities, irrigation system piping, sprinkler heads and other components. Coordinate any shutdowns and operation of the existing irrigation system with the COR. SITE CLEARING: Remove Grass and other vegetation or obstructions as required to permit grading of the site within the project limits. Dispose of all organic material on the cemetery property at the direction of the COR. Haul away and dump trash, debris and waste to an approved disposal site. EROSION CONTROL AND SITE DRAINAGE: Contractor shall provide erosion control measures to prevent erosion or displacement of soils and discharge of soil bearing water runoff or airborne dust. SITE GRADING AND FINISHING: Perform grading within the limits of the project to the lines, grades, and elevations indicated and as specified. Thoroughly clean up the work area at the end of each day s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor s personnel. The Contractor shall protect from damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuse to repair the damage promptly. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work. At Contractor s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor s workmen to exist ring piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified. Thoroughly clean up the work area at the end of each day s work and at the completion of the project. Leave premises clean and free of waste, scraps, used equipment or other material intentionally or accidentally delivered to the site by the Contractor or Contractor s personnel. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs and grass) on or adjacent to the work site not to be removed and do not reasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be made known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in the performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor. All utilities required for the continuous operation of all existing facilities shall be maintained in service at all times except when disruptions are needed. The contractor shall inform the Cemetery Director and the Contracting Officer (CO) in writing 2 weeks prior to the need shutdown. When the option exists, implement options to minimize interruption of services to the facilities. The Contractor shall coordinate with the Cemetery Director for parking, material storage, temporary portable restroom facilities and any other needs for the work. Public access to the National Cemetery shall not be impaired. Thoroughly clean up the work area at the end of each day s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor s personnel. The Contractor shall protect form damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work. At Contractor s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor s workmen to existing piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment. All work will be coordinated with the Contracting Officer s Representative (COR). Only the Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time. Work will be conducted in such a manner to minimize the impact on the Cemetery operations. Coordination of Construction with the Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the COR, in arranging construction the construction schedule to cause the least possible interference with Cemetery activities in actual burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period. The Contractor is required to discontinue his work efficiently in advance of Easter Sunday, Mother s Day, Father s Day, Memorial Day, Veteran s Day and/or Federal Holidays to permit him to clean up all areas of operation adjacent to existing burial plots before these dates. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the area in a clean, neat condition. Site work will be accomplished between the hours of 8:00 and 4:30, Monday through Friday, except Federal Holiday s. Work outside fo the Cemetery s normal operating hours of 8:00 am to 4:30 pm shall be permitted on by approval of the COR and to only meet the Period of Performance. 3. STANDARDS OF EMPLOYEE CONDUCT: The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work appearance and procedures performed by the Contractor at this cemetery shall reflect this nations concern for those interred there. Due to the sensitive mission of the cemetery and exhibit absolute decorum, composure, and stability all times. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here while performing work in the National Cemetery. These standards are enforceable under Title 38, USC, Part 1, Chapter 9, and Section 5901. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/Safety clothing and shoes shall meet or exceed OSHA and state requirements. Behavior and language must be appropriate, reverent and respectful at all times. Eating and drinking (except water) is prohibited in the work areas and within the sight of a committal shelter during a service. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery is strictly prohibited. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments. No tools, equipment s or other items will be placed on or leaned on headstones or monuments. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employee(s) from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or contrary to the best interest of the Government. If the Contractor fails to act in this regard, or the reason for removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contracting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later date or time. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and in later found to be invalid or and/or unreasonable by the Contracting Officer. All work shall be performed in accordance with National, State, and Local Codes including the International Building Code (IBC), the International Mechanical Code (IMC), the International Plumbing Code (IPC), and the National Electrical Code (NEC). All work shall be performed in accordance with the drawings and specifications. It shall be the Contractor s responsibility to comply with all the applicable codes. The Contractor shall apply and obtain all applicable permits to comply with local, State and Federal regulations. 4. CONTRACTOR QUALITY CONTROL The Contractor shall guarantee that all work done under this contract shall be free form defaults and no faulty materials or workmanship with one (1) year warranty or extended manufacturer s warranty. The Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the direction of the Contracting Officer (CO) at the Contractor s expense. And shall be corrected to the satisfaction of the Government. The Contractor shall provide a Job Site Superintendent who speaks and write fluent English on site, and at all times when Contractor personnel are on the premises. The Job Superintendent will: Review and Approve submittals Inspect the quality of work performed Certify the completed work for payment and other purposes Completion Time: Thirty (30) calendar days from date of issuance of Notice to Proceed (NTP). (End of Work Statement)

More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)

Same awarding agency

NAICS: 337211
New
Federal
Furniture Tahoma National Cemetery
Solicitation # 36C78627Q0020
Solicitation 36C78627Q0020 is a combined synopsis and request for quotation issued by the Department of Veterans Affairs, National Cemetery Administration, for the purchase, delivery, and installation of new commercial furniture at Tahoma National Cemetery in Kent, Washington. This firm-fixed-price purchase order is a total small business set-aside under NAICS code 337211. The scope of work includes providing desk systems, tables, seating, lockers, and storage for the Administration and Honor Guard buildings, with all work to be completed within 60 days after receipt of order. The contractor is responsible for all unloading, placement, and professional installation, as well as the removal of all packaging debris and the protection of government facilities during the process. The government will award the contract to the responsible offeror who provides the lowest price that is found to be fair, reasonable, and technically acceptable based on a pass/fail evaluation of the submitted technical documentation. Interested vendors must submit their quotations electronically by November 16, 2026, at 4:00 PM PST, organized into three separate PDF volumes: Administrative, Price, and Technical. Requirements include active registration in the System for Award Management and adherence to specific supplemental insurance minimums, including $500,000 for general liability bodily injury and $100,000 for property damage. Delivery is FOB Destination, and contractors must coordinate scheduling at least 14 business days in advance.
Wood Office Furniture Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 19 days
View Details
NAICS: 811310
New
Federal
J039 - Equipment Maintenance - Golden Gate National Cemetery
Solicitation # 36C78627Q0027
The Department of Veterans Affairs, through the National Cemetery Administration, is issuing a sources sought notice for recurring large equipment maintenance at the Golden Gate National Cemetery in San Bruno, California. Under NAICS code 811310, the government is seeking capable vendors to provide all labor, supervision, tools, equipment, materials, and transportation necessary to perform on-site preventative and corrective maintenance. The scope of work covers government-owned equipment including dumpers, forklifts, utility vehicles, loaders, and mini excavators. Services must be performed in accordance with manufacturer recommendations and government schedules, encompassing oil and filter changes, fluid and lubrication services, battery testing, and comprehensive system inspections of engines, drivetrains, hydraulics, and electrical systems. Interested respondents must submit their company name and Unique Entity Identifier (UEI) to the contracting officer by the November 3, 2026, deadline, and are encouraged to provide a capabilities statement. Qualified contractors must employ certified mechanics and technicians with experience in heavy equipment maintenance and the ability to service both diesel and gas-powered machinery. Key performance requirements include rigorous safety system checks and forklift inspections to ensure operational compliance. All maintenance activities are to be conducted on-site at the cemetery facility.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Solicitation # 36C78626B0028
The Department of Veterans Affairs National Cemetery Administration is soliciting bids for the Fort Bliss National Cemetery Gravesite Expansion and FCA Deficiencies project in El Paso, Texas. This firm-fixed-price contract is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated construction magnitude between $20 million and $50 million. The scope of work includes burial expansion, sitework, and the correction of FCA deficiencies, organized into a base bid for installation and pre-placed crypts, and a separate bid option for additional burial expansion and sitework. The project involves comprehensive construction activities, including the installation of 6,632 pre-placed crypts, mass grading, stormwater pollution prevention, and various architectural improvements to the Administration and PIC/Restroom buildings, such as clay roof tile replacement, stucco application, and electrical upgrades. The performance period is 540 calendar days from the notice to proceed, with work beginning within 10 days of award. Bidders must comply with Davis-Bacon prevailing wage requirements and provide performance and payment bonds totaling 100 percent of the awarded contract amount. Technical requirements include adherence to ADA accessibility standards, OSHA safety regulations for excavations, and strict guidelines for the treatment of historic decorative metal. Award will be granted to the responsible bidder whose conforming bid is determined to be most advantageous to the government, with evaluation based primarily on price and price-related factors.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
Federal
Grounds maintenance services for Riverside National Cemetery. -- S208
Solicitation # 36C78626R501200008
The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for comprehensive grounds maintenance and improvement services at Riverside National Cemetery in Riverside, California. This is a best value source selection procurement set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 561730. The contract structure consists of a twelve-month base year starting November 1, 2026, with four subsequent twelve-month option years. The scope of work covers approximately 460 developed acres and includes turf and grasses maintenance, pest control, irrigation system services, pond and drainage system maintenance, trash and debris removal, structure cleaning, and a one-time replacement and repair of the MOH pool pump system. The maximum aggregate value of the contract is 23,000,000 dollars, with a guaranteed minimum of 9,115.51 dollars. Award decisions will be based on a tradeoff analysis of three factors: Technical Capability, Past Performance, and Price, with the combined non-price factors carrying more weight than price. Technical evaluation focuses on the offeror's approach to turf management, safety compliance with OSHA and SCA standards, and the qualifications of key personnel, specifically the Site Manager. Proposals must include a signed SF 1449, completed price schedules, a draft Quality Control Plan, and at least two relevant past performance references. Following several amendments to address technical publishing issues and vendor inquiries, the final deadline for proposal submission has been extended to November 5, 2026, at 5:00 PM PST, with submissions sent via email to the contracting office.
Landscaping Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS