S--36C78619D0131 Headstone Setting/Raise and Re alignment Services Chattanooga National Cemetery

Awarded
36C78619Q0166Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
International
Mulching Newly Planted Areas
Solicitation # 1220-040-2026-086
The City of Surrey is soliciting quotations for solicitation number 1220-040-2026-086 to provide skilled labor, tools, and equipment for mulching newly planted natural areas in British Columbia. The scope of work involves the manual application of organic mulch and wood chips using wheelbarrows and plastic garbage cans. The contractor is required to provide two crews, each consisting of a two-person team and a dump truck with at least a 4 cubic meter capacity. Services are performed annually over approximately four months, specifically from January to March and October to December. Logistics include trucking mulch from the Surrey Operations Centre or receiving materials delivered by the City, with all work adhering to City of Surrey Construction Standards and British Columbia Landscape and Nursery Association Standards. Eligible contractors must possess a valid City of Surrey or Intermunicipal business license and maintain comprehensive insurance, including 5 million dollars in commercial general liability and 3 million dollars in automobile liability. The successful bidder must act as the prime contractor, appointing a qualified health and safety coordinator and complying with WorkSafeBC and WHMIS regulations. Quotations must be submitted as a single PDF file of no more than 10MB to [email hidden] by November 19, 2026. Pricing is based on hourly rates for truck operators, crew members, and various labor classifications, with payments processed net 30 days via electronic invoicing. The City reserves the right to negotiate terms and prices or reject all quotations.
City of Surrey

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 13 hours ago

DEADLINE

in 18 days
NAICS: 561730
New
SLED
Lawrence Co DHR FY27 Lawn Service
Solicitation # SRC0000037248
The Alabama Department of Human Resources Lawrence County Office is soliciting quotes for FY27 lawn services at their facility in Moulton, Alabama. The scope of work includes grass cutting services, limited to 20 cuts per fiscal year, and shrub and hedge trimming, limited to two services per year in the spring and fall. All shrub cuttings must be removed from the property, and the service excludes pine straw replacement or bed spraying. A mandatory site visit was required on October 23, 2026, and quotes from vendors who did not attend and sign in will be rejected. The period of performance runs from October 2026 through September 30, 2027, with the possibility of annual renewals for up to five years or until a total contract value of 25,000 dollars is reached. This is a Quick Quote solicitation requiring electronic submission via Alabama Buys by October 27, 2026. Award evaluation is based on price reasonableness and cost realism, and the state may request professional licenses and certificates of insurance after bid opening. Payment terms are net 30 days, paid in arrears upon completion of service. Bidders must comply with several state mandates, including E-Verify enrollment for Alabama employees, certification of Alabama state and local tax remittance per Act no. 2006-557, and confirmation that they are not engaged in boycotts of jurisdictions with which Alabama enjoys open trade. All legal disputes are subject to the jurisdiction of the City of Montgomery and the Board of Adjustment of the State of Alabama.
DHR Lawrence County Office

POSTED

about 13 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Department of Veterans Affairs National Cemetery Administration is seeking information and capability statements from qualified Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses for headstone setting, raising, and realignment services at the Chattanooga National Cemetery in Tennessee. This Sources Sought Notice is for planning purposes to determine market interest under NAICS code 561730 for landscaping services. The project involves the installation of new or replacement headstones and the annual realignment of approximately 500 existing markers to ensure uniform height and alignment according to strict National Cemetery Administration standards. The scope of work requires the contractor to provide all labor, materials, and equipment to install upright marble headstones and flat markers. Key technical requirements include digging sockets by hand, using specific crushed limestone base materials, and ensuring precise vertical and horizontal alignment. The contractor is responsible for daily reporting of all set and replaced markers, protecting stones from damage during transport, and establishing turf around installation sites. All work must be coordinated with the Contracting Officer Representative to maintain the aesthetic and structural integrity of the cemetery grounds.

General Info

Contract Value

$0

NAICS

561730 - Landscaping Services

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Response deadline changed from Feb 11, 2019 to Apr 12, 2019. The notice description changed.

Deadline changed

Response deadline changed from Apr 12, 2019 to Apr 26, 2019.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cemetery Administration (36C786)
ContactsNo contacts available
OfficeQUANTICO, VA, 22134, USA
Office AddressQUANTICO, VA, 22134, USA
ContactsNo contact information available

Full Description

Show more
Synopsis: This announcement constitutes a Sources Sought Notice. THIS IS NOT a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not to be construed as a commitment by the government, implied or otherwise, to issue a solicitation or award a contract. The Department of Veteran Affairs, National Cemetery Administration, is seeking qualified sources to furnish all necessary labor, material, equipment and supervision to perform Headstone Setting with Raise and Realignment Services. Services at Chattanooga National Cemetery, 1200 Bailey Avenue, Chattanooga, TN 37404. The purpose of this notice is to determine interest and capability of potentially qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small-Businesses (VOSB) relative to the North American Industry Classification code (NAICS) 561730- Landscaping Services (Cemetery Plot Care Services). The Small Business Size Standard is $7.5 million. To make an appropriate acquisition decision for this requirement, the Government will use responses to this sources sought synopsis. The type of solicitation issued and the manner of advertisement will also depend on the response to this sources sought synopsis. Description: HEADSTONE/MARKER SETTING & REALIGMENT GENERAL The work performed in this section is subject to the General Requirements which form a part of these specifications, and the Contractor shall be responsible for and governed by all the requirements there under. SCOPE OF WORK NCA STANDARD: Proper height and alignment of each headstone or marker is maintained. Standard 3.1: Graves in national cemeteries are marked within 60 days of the interment. Measure 3.1b: 100 percent of headstones are set within 5 workdays of receipt.2 day again Standard 3.2: Headstones are properly installed. Measure 3.2a: The percent of upright headstones in active burial sections that are installed to be uniform in height (24 - 26 above ground) and horizontally and vertically aligned with inscriptions visible and installed to ensure a pleasing top line while compensating for ground contours. Proper height and alignment of each headstone or marker is maintained. Measure 3.2b: Flat markers in active burial sections are installed to be uniform in height (parallel with the ground and no more than 1 above grade) and horizontally and vertically aligned. Headstones set in existing sections are installed to be uniform in height with headstones in that section, and/or are set to ensure the inscription is visible. Headstones and markers are set consistent with the gravesite layout plan. Work consists of setting new or replacement headstones on gravesites and resetting or realigning (fine tune alignment) those already in place that have shifted out of vertical or horizontal alignment. It includes reporting physical defects to the Contracting Officer or his authorized representative. Approximately 500 headstones/markers will require realignment and raising annually. Backfill under this contract means: the upright headstones or flat markers shall have soil tamped in the voided area between the existing sod to the vertical surface of the upright headstone which results in no voids or depressions within eight (8) inches of the perimeter of the base of the upright headstone. Socket under this contract means: the hole in the ground where the headstone is inserted. Record Keeping and Reporting: The contractor s Superintendent or his designee shall provide the COR with daily written reports accurately identifying all headstones/markers set and replaced listed by deceased names and numbers for each gravesite location. Reports detailing headstones set will be provided to the COR or Cemetery Designee by 1200 (Noon) for all headstones set before noon and 1500 (3PM) for all headstones set after noon. Reports will be made on the Cemetery provided Daily Headstone Sheet. 3. GENERAL REQUIREMENTS: Upright white marble headstones are to be used at the Chattanooga National Cemetery as determined through direction of the National Cemetery Administration, Central Office (in accordance with the general plan of the cemetery). Headstones shall be installed as soon as possible or as directed by COR within Seven (7) calendar days (maximum) of final inspection. The Contractor shall submit a daily schedule of setting and alignment prior to start of work to the COR. The schedule will be used in performing inspections on settings and alignments. Once headstones have been set, the contractor s site supervisor shall provide the COR a signed and dated list of all headstones set that day at 1200 noon and 1500. Headstones shall be inspected and certified for proper placement and alignment by the contractor site supervisor daily. Standard upright marble headstones are approximately 42 inches long, 13 inches wide, 4 inches thick, and weigh approximately 240 pounds. Older Civil War type upright marble headstones are typically around 35-1/2 inches long, 9-1/2 inches wide, and 3 inches thick and weigh approximately 140 pounds and 6x6 (Post) unknown markers are 24 inches long. The type of marker to be used shall be determined by the Contracting Officer Representative (COR) through direction of the National Cemetery Administration, Central Office (in accordance with the general plan of the cemetery). Headstones/markers shall be installed within Five (5) business days of delivery to Chattanooga National Cemetery as weather and soil conditions permit. The contractor shall submit an annual schedule of raising and realignment prior to start of work to the COR. The schedule will be used in performing inspections on raising and realignments. 4. PROCEDURE, NEW & REPLACEMENT HEADSTONES/MARKERS, RAISE AND REALIGNMENT OF HEADSTONES/MARKERS A. The responsibility for ordering headstones/markers will be that of the COR. Checking for proper wording and initial inspection for damages shall be that of the Contractor. If the headstone deviates from what the paperwork states or is damaged, the Contractor shall notify the COR before receiving the headstone and signing the Bill of Lading. B. Headstones/markers are received and verified at Chattanooga National Cemetery, maintenance building by the Cemetery COR or designee. Headstones and markers shall be erected in appropriate places within Five (5) days of receipt, or if weather or soil conditions prohibit this time frame, as soon as practicable after receipt. Exceptions in the timeframe must be granted in writing by the COR. In transporting or storage of headstones/markers, they shall be protected from the weather to avoid damage or staining from crating materials. Each stone shall be placed on its short edge in a vertical standing position for easy accessibility. Where there is a shortage of storage space and there is a wall or other substantial support at the storage area, the headstones may be stored by resting on their bottom edge and leaning against the wall at a safe and stable angle. Several stones may be stacked against the first stone to conserve space with proper separation in all cases. If there is any breakage or damage in any form due to the Contractor's handling or negligence, the cost for replacement shall be borne by the Contractor. If a headstone is received defective, the contractor will notify the COR immediately. The COR shall designate a suitable area for storage of the stones at Chattanooga National Cemetery. Defective headstones/markers will not be set and information regarding the headstone will be sent to the COR as soon as possible. Replacement stones will be ordered for Chattanooga National Cemetery by the COR within two (2) calendar days. C. Upright headstones for individual graves shall be erected on the center line at the head of the grave with the inscription facing the grave. They shall be set plumb and aligned laterally, transversely, and diagonally with the headstones on other graves. Measurements shall be taken from the section layout control points and not from headstones previously set. New and replacement headstones in old sections of National Cemeteries where such stones have not been and cannot be set at the standard height shall be set at the same distance above the ground as the adjacent headstones, provided they can be set with the inscription above the ground level. In new sections of National Cemeteries, all upright headstones shall be set at a height of 24 -26 inche Old Boys, Civil War, Spanish/American War and Civil War Unknown (6 x 6) Headstones/Markers. -Upright type (35 inches x 10 inches x 2 inches); set 16 -18 inches out of ground. -Unknown type (30 inches x 6 inches x 6 inches); set 12 inches out of ground. s from the finished grave to the top of the arc, all flat markers will be set 1 inch above grade parallel to surrounding grade. Where headstones have been previously set at other heights above grade, but in general, at a uniform height throughout an area, and otherwise present a neat overall appearance with the inscription visible, resetting for the sole purpose of attaining the stated height is unnecessary. The nominal height of 24 -26 inches given for the current standard of headstone setting is the standard height. Minor deviations (approved by COR) in the less than nominal height are permissible to provide a uniform appearance in the top line to compensate for slight ground rises or depression within a burial section or for civil war or unknown 6x6 markers. Where a considerable number of adjacent stones are set or reset in a section, and ground conditions are known to require an allowance for vertical settlement, an extra inch may be permissible in the above ground projection when the stone is initially set. D. All temporary markers, floral, commemorative, buried permanent floral vases, or other types of decorations and arrangements causing interference with the setting of upright headstone or flat stone operation shall be carefully, and in an orderly manner moved from, and per completion of work, moved back to all gravesites by the Contractor. Prior to removal, the Contractor shall verify the numbering sequence and location of the headstone and associated decorations by using tags and a permanent ink marker indicating from which grave the item was removed. Upright Headstone Installation: 2. All upright headstone sockets are to be dug by hand to allow for a 3 perimeter around all sides of the headstone and to a sufficient depth so that a 3" compacted base can be established, allowing the stone to extend out of the ground at a height of 24-26 inches to the top of the arch on the standard headstone (Note: In areas where smaller than standard size headstones may occur, Contractor shall coordinate specified measurements and dimensions of required work with COR.) 3. Moistened Crushed Limestone Base Material (graded aggregate sizes ranging from crushed fines up to ¼" maximum) will be placed around all sides of the headstones and in the bottom of the socket before being thoroughly tamped to full compaction at each three (3) inch vertical interval, leaving the last 4 inches at the top to have tamped topsoil. The government will not provide any material. The Contractor is required to provide these materials. (Note: Moist Class II Road Base may be considered as an alternate. Contractor shall obtain approval from the COR for any substitute base material). 4. Straight Rows: Upright Headstones shall be set vertically plumb in all directions, in all cases in a line vertically and laterally, and where possible transversely (coordinate with COR), with headstones of other graves using a top string, a back of headstone string line, and a side of headstone string line. Maximum vertical, lateral, and transverse tolerance of any headstone off the alignment string lines and/or marks shall be 1/8" or less. All measurements and string line set ups shall be taken from established section layout control points, not from previously set headstones, unless otherwise directed by the COR. In situations whereas there is no monumentation, a top string shall be centered over the arc of the headstone for vertical alignment. The consistency of the row will be used as the medium. At no time will any headstone be reset in a totally new socket unless otherwise directed by the COR. Set headstones in all soil and terrain shall be firmly in place so that headstones are rigid with no give or play. 5. Irregular Terrain: When sloping and uneven ground conditions exist in burial sections, all headstones and markers will be set at field approved heights and levels through the use of multiple keystones, back strings, top strings, and side strings to provide a flowing transition through uneven terrain. Field guidance will be provided by the COR upon the written request from the Contractor. The established field guidance will overrule the height requirements that will be found in other parts of this specification. 6. Upright Headstone sockets to receive headstones shall be dug by hand to a sufficient depth so that 24-26 inches of the headstone is extending from the topsoil level of the sod to the top of the arc on the headstone. Contractor shall not dig a headstone socket wider than twelve (12) inches, twenty (20) inches in length, or exceed a depth of 20 inches that may cause the headstone to settle below height requirement. 7. The measurements between rows of headstones and headstones within each row may differ from one section to the next; discuss with COR where this is found to occur. These measurements must be adhered to as closely as possible. Some variances may be allowed in order to keep a uniform appearance of headstones being aligned. Headstones will be accurately and precisely reinstalled on the correct gravesites with the utilization of temporary grave plotting maps and existing permanent control markers. Flat marker installation: All flat marker section are installed with GRASSPAVE. The following process will be followed for reinstallation if existing pave is damage beyond replacement: A 4 deep x 1 -6 wide trench shall be dug under each flat marker the full width of the grave to accept GRASSPAVE 2 or an equivalent approved by the MSN Agronomist. (GRASSPAVE 2 @ is a trademark product produced by Invisible Structures, Inc, 20100 East 35th Drive, Aurora, Colorado, 80011-860). Over excavate the soil directly below each flat marker, and 6 to each side, an additional 5 deeper (overall depth 9 ), and then backfill this same area (directly below each flat marker) with 5 min thickness of moistened Crushed Limestone or approved Road Base Material (graded aggregate sizes ranging from crushed powder fines up to 3/4 maximum) heavily tamped to full compaction and leveled for the required alignment of the flat markers. After heavily tamping and compacting the soil in the bottom of the 4 depth continuous trench, install 1 -6 wide continuous strip of GRASSPAVE 2 along the entire length of each grave space. If material must be spliced, this shall be done in accordance with GRASSPAVE @ manufacturer instructions. Directly underneath each flat marker, backfill the honeycomb voids of the GRASSPAVE 2 with moistened Crushed Limestone Base Material (graded aggregate sizes ranging from crushed powder fines up to 3/8 maximum) to fill the 1 high rings and all spaces between the rings, and compact this material into place. Top elevation of the filled GRASSPAVE 2 material will be the base for the flat markers. Backfill clean topsoil into the remaining areas of GRASSPAVE 2 honeycomb located in the trenches between the flat markers and firmly compact this material into place. Remaining trench areas around and between all flat markers from top of the GRASSPAVE 2 to top of ground surface are to be filled with 3 minimum clean topsoil compacted firmly into place so that settlement will not occur. Backfill material specified above shall be used at all areas within the gravesite requiring backfill material (Also refer to paragraph C.6.6.). The backfilled material shall be placed under the GRASSPAVE2 and compacted as recommended by the GRASSPAVE2 manufacturer. The backfill material shall also be used at any other areas within the gravesite to form a level surface and/or surface positively draining to existing storm drains within the cemetery. The backfill material which is NOT located under the GRASSPAVE2 material shall be compacted to 85% as measured by ASTM D1557, Method A. Upon installation of the required topsoil and sod, the flat marker shall be set at one inch above the finished grade, which include the topsoil of the sod. Flat markers shall be set firmly in place so that the markers are rigid with no give or play. And set 1 inch above graded soil line that includes topsoil of sod. Flat markers shall be set plumb, in a line laterally, transversely, and diagonally with markers of other graves. All measurements and string line set-ups shall be taken from the established permanent gravesite control monumentation and surrounding headstones as directed by the COR. Headstones shall be lifted and transported or set by at least five (5) people unless special one-person devices are approved. Realignment, when consisting merely of straightening the headstone, called bump and run, will be accomplished by a minimum of two people. Older headstones will be realigned laterally, transversely and diagonally in the same manner as new markers. Damaged headstones, rejected and replacement headstones will be returned to the location directed by the COR for disposal by the Cemetery Staff. Warranty: Adjustment, raising and realigning newly set headstones due to initial settling, improper compaction or contractor error within a one year period will not constitute Headstone Raise, Lower, Realign, Reset, Backfill and will be at the contractor s expense. Finishing of Headstone Socket: 1. Topsoil shall be placed around the headstone to a depth of 4-6 inches from the top level of the sod. Topsoil shall be a well-graded soil of good uniform quality. It shall be a natural, friable soil representative of productive soils in the vicinity. Topsoil shall be free of admixture of subsoil, foreign matter, objects larger than 25 mm (one inch) in any dimension, toxic substances, weeds and any material or substances that may be harmful to plant growth and shall have a pH value of not less than 5.0 nor more than 7.5. Testing for pH will be required by an approved laboratory. Copies of the pH tests shall be furnished to the COR(s) PRIOR to topsoil being placed. Amend topsoil not meeting the pH range specified by the addition of pH Adjusters. Top-dress is to be organic matter, weed free consistent with irrigation requirements to promote healthy grass. At least 10 days prior to topsoil delivery, notify the COR or designee of the source(s) from which topsoil is to be furnished. Obtain topsoil from well-drained areas. 2. Turf establishment around headstone sockets must be established within thirty days during growing season. Headstones set outside of the growing season shall have turf established within 30 days of the beginning of growing season. Turf shall be established by replacement of existing turf or sodding with turf that matches the surrounding turf. If healthy turf is present on the gravesite the turf may be cut off and replaced. It is the contractor s responsibility to water the turf until established. The Cemetery is primarily Tiff Way 419 variant Bermuda turf grass. Watering of the new turf around the headstone is the responsibility of the contractor. A period of 30 days shall be given after sodding for establishment of the turf. Any turf that dies during the establishment period shall be replaced at the contractor expense. 3. Trees or shrubs obstructing headstones shall be noted and the COR shall determine remedial action, and any modification needed for installation of a headstone. I. The contractor shall report on his daily inspection report to the COR the following: Number of headstones raised and what section _______Upright, _______Flat, ________Section Number of headstones realigned and section _______Upright, _______Flat, ________Section 3. Number of headstones set _______Upright, _______Flat, ________Section If there is a problem with realigning a specific headstone, a report will be sent to the COR providing a detailed explanation, the reasons the headstone was not realigned. J. If mechanical devices are used to lift headstones, the Contractor shall use wooden and/or metal clamps. The area that contacts the headstone must be protected with a rigid fabric/rubber that shall prevent damage to, and markings of, the headstone. Clamps may be attached to a mechanical puller machine. Use care not to scratch or damage headstones in any manner. If Manual stone pullers are used it shall be with a minimum two person lift. K. All headstones that are set shall be cleaned with clean water/soapy water and a hard nylon bristle brush (no metal brushes) or pliable sandpaper. The sandpaper must ensure it does not damage the headstone in any way. Submission requirements for responses to this sources sought synopsis: VOSB/SDVOSB offerors interested in submitting a quote for this project, if it is formally advertised, must be registered and be verified in the www.vip.vetbiz.gov website and must provide the correct NAICS code to include the Data Universal Numbering System (DUNS) commercial and Government Entity (CAGE) number, name of the firm, address, phone and point of contact. Where to send responses: Point of Contact: Tracy Williams Email: contact@example.gov Response Deadline: February 11, 2019, 4:00 PM, EST

More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)

Same awarding agency

NAICS: 237990
New
Federal
Y1JZ--926CM3010 Cemetery Expansion and FCA Improvements Project Washington Crossing National Cemetery
Solicitation # 36C78627Q0030
The Department of Veterans Affairs National Cemetery Administration is conducting market research to identify capable Service-Disabled Veteran-Owned Small Business prime contractors for a design-bid-build construction project at Washington Crossing National Cemetery in Newtown, Pennsylvania. This effort is not a formal solicitation but a sources-sought notice to inform acquisition planning. The project involves extensive civil infrastructure work, including excavation, grading, stormwater and utility systems, roads, and paving, as well as the construction of columbaria with approximately 4,080 niches. A significant component of the work includes the installation of roughly 8,500 Government-furnished pre-placed crypt units. Additionally, the project encompasses repairs and renovations to the maintenance building and Public Information Center. The estimated magnitude of construction is between 10 million and 20 million dollars, with an anticipated period of performance of 12 to 18 months following the notice to proceed. The government is considering a firm-fixed-price contract under NAICS code 237990, specifically as a competitive SDVOSB set-aside. Because the work will take place at an active national cemetery, the contractor must be able to manage simultaneous civil and building work while ensuring the safety and continuity of visitors and interment services. Interested firms are requested to submit a capability statement by November 9, 2026, detailing their past performance, bonding capacity, and experience with Government-furnished precast products, but they are explicitly instructed not to submit price proposals.
Other Heavy and Civil Engineering Construction

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details
NAICS: 337211
New
Federal
Furniture Tahoma National Cemetery
Solicitation # 36C78627Q0020
Solicitation 36C78627Q0020 is a combined synopsis and request for quotation issued by the Department of Veterans Affairs, National Cemetery Administration, for the purchase, delivery, and installation of new commercial furniture at Tahoma National Cemetery in Kent, Washington. This firm-fixed-price purchase order is a total small business set-aside under NAICS code 337211. The scope of work includes providing desk systems, tables, seating, lockers, and storage for the Administration and Honor Guard buildings, with all work to be completed within 60 days after receipt of order. The contractor is responsible for all unloading, placement, and professional installation, as well as the removal of all packaging debris and the protection of government facilities during the process. The government will award the contract to the responsible offeror who provides the lowest price that is found to be fair, reasonable, and technically acceptable based on a pass/fail evaluation of the submitted technical documentation. Interested vendors must submit their quotations electronically by November 16, 2026, at 4:00 PM PST, organized into three separate PDF volumes: Administrative, Price, and Technical. Requirements include active registration in the System for Award Management and adherence to specific supplemental insurance minimums, including $500,000 for general liability bodily injury and $100,000 for property damage. Delivery is FOB Destination, and contractors must coordinate scheduling at least 14 business days in advance.
Wood Office Furniture Manufacturing

POSTED

2 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS