Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 19, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--WY- Fire Suppression System - Resetting and Rechar

Awarded
R17PS01006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The contractor must verify proper clutch engagement and disengagement and test the PTO system under load to ensure the unit is restored to safe operating condition. This is a small business set-aside solicitation with a response deadline of November 3, 2026. Award will be based on best value, and bidders must submit a bid sheet, a completed supplier packet including a W-9 and self-certification form, and proof of insurance. The contract is subject to various federal regulations, including Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31 for Kentucky, and FAR clauses regarding the utilization of small business concerns and combating trafficking in persons. Final acceptance of the work is contingent upon inspection by the Facility Maintenance Department to verify operational functionality and adherence to manufacturer specifications.
Earle C. Clements Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 811310
New
SLED
Asphalt Storage Tank Maintenance and Repair
Solicitation # 601320000072188
The Texas Department of Transportation (TxDOT) issued Invitation for Bid (IFB) 601320000072188 in October 2026 for the maintenance and repair of two Duraco Model 8250 asphalt storage tanks located at the Gonzales Maintenance Facility in District 13. The scope of work includes the cleaning of tanks, installation of new manway gaskets and other necessary seals, and the off-site transport and disposal of all removed materials in compliance with Texas Health and Safety Code Chapter 361. All work must be performed according to manufacturer recommendations and applicable standards, with a final inspection required by a TxDOT representative prior to invoicing. Responses are due by November 6, 2026, at 3:00 p.m. Central Time and must be submitted via the Euna Procurement portal. Bidders are required to provide a comprehensive submission including a price schedule in Excel format, qualifications and references, an approach to work, and mandatory certifications regarding child support obligations and legal eligibility. TxDOT will award the contract based on best value, primarily considering purchase price, compliance with specifications, and the risk of vendor non-performance. To pass the initial evaluation, vendors must maintain a performance rating of A, B, or C in the CPA Vendor Performance Tracking System. The selected vendor must adhere to strict insurance requirements, including policies from companies with an A.M. Best rating of A- or better, and maintain confidentiality regarding all TxDOT business information. Payments will be processed electronically in accordance with Texas Government Code Chapter 2251. Additionally, respondents must certify compliance with various state and federal laws, including the Texas Free Enterprise and Antitrust Act and Title VI assurances, while agreeing to prioritize the purchase of Texas-produced materials when available.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 811310
New
SLED
Conveyance Maintenance Services
Solicitation # 26-1336
Chicago Public Schools is soliciting bids for Conveyance Maintenance Services under solicitation number 26-1336 to implement a comprehensive preventive maintenance program for conveyance equipment. The selected bidder will provide all labor, materials, and supervision necessary to ensure equipment remains safe and operational, adhering to the City of Chicago Municipal Code, ASME A17.1/CSA B44, ASME A17.3, and original equipment manufacturer standards. The contract includes a three-year initial term with the possibility of two automatic renewals of two years each. Services involve monthly preventive maintenance during normal working hours from 6:00 a.m. to 2:30 p.m., as well as 24/7 emergency callback support. Key deliverables include site-specific maintenance schedules, the use of CPS facilities software for reporting, and an annual Executive Summary Report based on a 7-point assessment rubric. The agreement will be awarded to the lowest, responsive, and responsible bidder based on evaluation factors including price, business stability, professional qualifications, past performance, and capacity. Bidders must submit a comprehensive package via Bonfire, including an Excel-based bid tabulation, audited financial statements for the last three fiscal years, three non-Board references, and a W-9 tax form. Compliance with MBE/WBE aspirational goals of 30% and 7% respectively is required, along with adherence to the Illinois Minimum Wage Law and various federal and state non-discrimination acts. Invoicing must be submitted electronically in PDF format, with payments processed according to the Local Government Prompt Payment Act. All shipments are designated as F.O.B. destination. The deadline for questions is November 6, 2026, and the final response deadline is November 20, 2026.
Chicago Public Schools

POSTED

about 21 hours ago

DEADLINE

in 20 days
NAICS: 811310
New
SLED
Annual Inspection/Maint. and Repair on Generator at FMS #8
Solicitation # SRC0000037488
Solicitation SRC0000037488 is for the annual inspection, maintenance, and repair of a Speed Air air compressor (Model 1WD44, SN: D063475) at FMS #8 in Gadsden, Alabama. The scope of work includes replacing belts, collecting oil samples, and installing filters, cabinet filter mats, and repair kits for the oil and thermostatic valves. A mandatory site visit is required on November 18, 2026, at 10:00 AM at 5319 Airport Road, Gadsden, Alabama. The response deadline is November 23, 2026, and all bids must be submitted electronically through the Alabama Buys portal. The contract is managed by the Army MCA and the State of Alabama, with a maximum total value of 25,000 dollars over a potential five-year period, subject to annual renewals. Award evaluation will be based on price reasonableness, cost realism, and supplier qualifications, including professional licenses and insurance. Vendors must comply with the Code of Alabama, including the Beason-Hammon Alabama Taxpayer and Citizen Protection Act and registration requirements for foreign corporations. Payment will be handled electronically via P-cards, EFT, or state-issued credit cards. Final acceptance of services is contingent upon a satisfactory inspection by the State of Alabama in accordance with the Universal Commerce Code.
Army MCA_App 01_Real Property Operations & Maintenance, State Military Department

POSTED

about 22 hours ago

DEADLINE

in 23 days
NAICS: 811310
New
SLED
Electrical & Automation Services
Solicitation # 9181
The City of Denton is soliciting proposals for Electrical and Automation Services to support 12 Wartsila 18V50SG units located at the Denton Energy Center. The selected contractor must ensure all equipment operates within Original Equipment Manufacturer specifications without voiding existing warranties. Key performance requirements include providing personnel and service offers within one week of notice and completing repairs and services within five weeks of evaluation. The City will award the contract based on best value, evaluating submissions through a weighted scoring system: 30% for schedule timeliness, 30% for compliance with specifications, 20% for indicators of probable performance, and 20% for total cost of ownership. Submissions must be made via IONWAVE or hard copy by December 2, 2026, at 2:00 PM CT. Hard copy responses must be sealed, limited to 200 pages, and bound only with staples or binder clips. Required documentation includes proof of Texas state registration, a conflict of interest questionnaire, and a safety record. The contractor must comply with Davis-Bacon prevailing wage rates, the Buy American Act, and ADA non-discrimination practices. Invoicing must be submitted to the City's Accounts Payable department within 30 calendar days of service completion, with payments processed within 30 days of receipt. All deliverables must be shipped with weather-resistant labeling and a packing slip to the designated Denton address.
City Of Denton

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 811310
New
SLED
Chiller Maintenance Services
Solicitation # 26FS0006
Solicitation 26FS0006 is an Invitation for Bid issued by the California Department of Veterans Affairs (CalVet) for comprehensive maintenance and emergency repair services for chillers, Liebert units, and cooling towers at the Veterans Home of California-Fresno. The contract period is scheduled from January 1, 2027, through June 30, 2030. The scope of work includes annual and quarterly preventive maintenance, one-time evaporator tube cleaning and eddy current testing, and emergency repair services with a required two-hour response time. Key deliverables include annual leak detection reports per AQMD requirements and yearly oil sample lab analysis reports. The contract will be awarded to the lowest responsible bidder who complies with all requirements. Evaluation factors include price, responsibility, and responsiveness, with specific incentives and preferences applied for Disabled Veteran Business Enterprises (DVBE) and certified Small or Micro businesses. To be eligible, contractors must maintain an active C-20 license and technicians must hold EPA Section 608 Universal Technician Certification. Bidders are required to submit a mandatory Rate Sheet, signed Contractor Certification Clauses, and a Bidder Certification via email to Eric Dahmen by the November 4, 2026, deadline. Awarded contractors must adhere to prevailing wage laws under Labor Code Section 1770 and comply with all site security and health requirements at the Fresno facility.
California Department of Veterans Affairs

POSTED

1 day ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Bureau of Reclamation, Wyoming Area Office, is conducting a sources sought synopsis to identify qualified contractors under NAICS 811310 for the resetting and recharging of a fire suppression system. This is not a solicitation, but a market research effort to determine the availability of various small business classifications. Interested parties must respond to this synopsis and subsequently respond to the formal solicitation announcement to be considered for the award. The scope of work involves comprehensive maintenance of the fire suppression system, including inspecting rigid pipe supports, cleaning and reinstalling nozzles, and performing detailed valve teardowns. Contractors must rebuild valves using specific parts, conduct leak and pre-dome tests using nitrogen, and refill SAPPHIRE tanks with Novec 1230 agent following strict moisture-control and pressurization protocols. The selected contractor will be required to maintain a Quality Control Plan and notify the government of any deficient conditions or necessary extra work to return the system to as-new condition.

General Info

Contract Value

$21,568.71

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Denver Federal Center
ContactsNo contacts available
OfficeDENVER, CO, 80225, USA
Office AddressDENVER, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
This is not a solicitation announcement. This is a sources sought synopsis only. The purpose of this synopsis is to gain knowledge of potential qualified sources and their size classification (hubzone, 8(a), small, small disadvantage, veteran owned, women owned or service disabled veteran owned small business) relative to NACIS 811310. Written responses to this synopsis will be used by the Government to make appropriate acquisition decisions. After review of the responses to the sources sought synopsis, a solicitation announcement will be published in FedConnect website. Responses to this sources sought synopsis are not considered adequate responses to the solicitation announcement. All interested offerors will have to respond to the solicitation announcement in addition to responding to this sources sought announcement. The Bureau of Reclamation, Wyoming Area Office (WYAO) is seeking sources to reset and recharge fire suppression system. Services include checking all rigid pipe supports and all fitting connections. Removing nozzles off of the piping, inspecting for damage, corrosion, or obstruction, clean and re-install. Valve teardown, remove actuators, remove piping and discharge hose from valve outlet, and remove empty tanks from brackets. Rebuild valves and O-rings replaced prior to tanks being recharged. After valve teardown, performance of Leak Test and Pre-Dome Test. Refill empty tanks. The contractor shall be able to perform the following tasks: Check Mechanical and Electrical Equipment: Piping and Nozzles: A fire condition could cause damage to the piping and nozzles and possibly support members. Check all rigid pipe supports and all fitting connections. Take the nozzles off the piping, inspect for damage, corrosion, or obstructions, clean and re-install. Electric Detection System: Before resetting release mechanism, bleed pressure from actuation piping by pulling ring on safety relief valve located on actuation piping. Valve Teardown: Note: In order to maintain Factory Mutual approval, factory filled SAPPHIRE tanks must be used. 1. Remove empty SAPPHIRE tanks by removing the actuators (either electric or pneumatic). 2. Remove piping and discharge hose from valve outlet and remove empty tanks from brackets. 3. Tank valves must be rebuilt and all O-rings replaced prior to tanks being recharged. Follow instructions listed in Step No. 4 and 4a. 4. 1 in and 2 in. Valves ¿ Valve cleaning/O-ring replacement instructions. Refer to Figure 1 for component descriptions. The following components are required for valve rebuilding: - Bonnet assembly, Part No. 570543 for 1 in., Part No. 570541 for 2 in. - Piston assembly, Part No. 570551 for 1 in., Part No. 570552 for 2 in. - O-ring kit, Part No. 570559 for 1 in., Part No. 570584 for 2 in. - If necessary, recoil cap assembly, Part No. 570553 for 1 in., Part 570554 for 2 in. o Remove the valve from the tank. o Remove the siphon tube locking screw to allow removal of the siphon tube from the valve. o Remove the socket head cap screw that hold the recoil cap chain to the valve body. o Remove bonnet locking screw from the same port as socket head cap screw mentioned in Step ¿c¿ and unscrew the bonnet assembly, using the spanner wrench, Part No. 57054. Remove and discard O-ring from bonnet assembly. o Remove the piston assembly by pushing up on it from the bottom of the valve. Discard complete piston assembly. o Remove collar O-ring, and siphon tube O-ring. Discard both. o Clean all internal valve surfaces. Use caution not to cause any scratching to surfaces. o Use O-ring kit, Part No. 570559 for 1 in. or Part No. 570584 for 2 in., to replace with all new O-rings. Apply Dow Corning No. 4 lube to all O-rings before installing on components. o Push in new piston assembly. o Screw in bonnet assembly, including new O-ring. Tighten with spanner wrench. o Thread in bonnet locking screw followed by washer, chain and socket head cap screw. The cap screw holds the recoil cap chain to the tank valve body. o Install collar and siphon tube O-ring. Before installing, coat with Dow Corning No. 4 lube. o Push siphon tube into base of valve and rotate until locking screw hole in the siphon tube is aligned with the siphon tube locking screw hole in the valve base. Install siphon tube locking screw. o Do not install valve into tank until Step ¿1g¿ in ¿filling instructions.¿ 4a. 3 in. Valve- Valve cleaning/O-ring replacement instructions. The following components are required for valve rebuilding: - Top cap assembly, Part No. 570598 - Piston assembly, Part No. 570601 - O-ring kit, Part No. 570599 - If necessary, recoil cap assembly, Part No. 570600 - Remove valve from tank. Note: Siphon tube for 3 in. valve stays in the tank collar. - Unscrew top cap. - Remove body and collar O-rings. Replace with new O-rings in a later Step. - Remove the piston from the valve body and discard. - Clean inside surfaces of valve body. Be careful not to scratch surface. Spray a small quantity of PTFE silicone into the inside of the valve. - Lubricate top cap O-ring with PTFE silicone and install into upper groove on valve body. - Lubricate collar O-ring with PTFE silicone and install on valve collar threads. - Lubricate piston O-rings with PTFE silicone and install piston in valve body. - Install top cap on valve body. Hand tighten. - Valve assembly is now ready to be leak tested. Testing: On completion of the valve tear down, the valve assembly requires two tests ¿ Leak Test and Pre-Dome Test (Pre-Dome Test is required only if burst disc had been changed). The tests must be conducted using a nitrogen source, a test bottom cap, close down adapter, and an outlet filling adapter. See Figure 3 test Station Component Layout. 1. The valve assembly is assembled to the test bottom cap. The outlet adaptor is assembled to the valve outlet. Attach the nitrogen line and make certain the vent valve on the outlet adaptor is closed. 2. Burst Disc Pre-Dome Procedure 0 Open the nitrogen regulator to 580 psi (40 bar) and slowly allow pressure to the valve through the bottom test cap. This is to pre-dome the burst disc. Hold this pressure for 1 minute to ensure that there is no drop in pressure indicted by the rest gauge on the nitrogen test set-up. 3. Pour water/soap solution into the top cap Schrader valve and apply leak detection spray to all ports on the valve. If no leaks are detected, the pressure to the valve must be reduced to 363 psi (25 bar) and the close down adaptor must be attached. To close the valve piston, increase the nitrogen pressure to the close down adaptor to 580 psi (40 bar). 4. Check for leaks. 5. Slowly release the gas pressure from the nitrogen test set-up, vent the close down adaptor, and make certain that the outlet filling adaptor is opened before removing the adaptors. 6. If a leak had been detected, it must be rectified and retested. If the leak persists, the valve assembly must be rejected. Recharge Instructions: 1. a. See Figure 4 for a typical recharge station configuration. b. Install a drier (such as Hammond DRIERITE filter) in a threaded port on the Novec 1230 agent container. A drier is required because humid air may cause the agent to convert to an acid. c. The outlet of the container requires an inline (20 micron or smaller) filter. d. The agent can either be pumped or gravity fed to the tank. e. Tank must be visually inspected and clean inside. IMPORTANT ¿ No Moisture is allowed in the tank. It must be completed dried. Water mixed with agent will cause acid. f. Rebuild valve. See ¿Valve Rebuild Instructions,¿ Step 4 and 4a. g. Reinstall valve and siphon tube assembly into tank. Tighten securely. h. Purge tank by pressurizing through a Outlet Fill Adapter Assembly (see chart on Page 9-2) to 100 psi (6.9 bar) with dry nitrogen, then vent pressure. This process will remove humid air from the tank. i. Fill tank with correct amount of agent by weight. See nameplate for this information. j. Set regulator to 20 psi (1.4 bar) lower than the required tank pressure based on ambient temperature. Refer to pressure vs. temperature chart in this section. Pressurize tank. Agitate tank while pressurizing. k. After correct pressure is reached, close valve near tank valve outlet. l. Close tank valve by using Top Adaptor Assembly, Part No. 570579, as follows. Set regulator to 450 psi (31.0 bar). Pressure Top Adaptor Assembly. Open and close the valve rapidly to prevent over- pressurizing of tank. m. Vent pressure from tank valve outlet. n. Remove Fill Adaptor Assembly and install recoil cap on valve outlet. o. Agitate tank by rolling or inverting so that the agent can absorb the nitrogen. p. Add more nitrogen through the Top Adaptor Assembly. Using the pressure vs. temperature chart at ambient temperature, set the regulated pressure at the corresponding pressure plus 8 psi (0.6 bar). It takes 8 psi (0.6 bar) to overcome the spring force in the valve core. Note: Do not use gauge on valve to determine recharge pressure. q. Repeat Steps ¿o¿ and ¿q¿ until the agent has fully absorbed the nitrogen. r. Let tank assembly sit for 3 hours. s. Check the tank valve for leaks by using soap and water solution. t. Check tank gauge pressure based on pressure vs. temperature chart. u. Repeat Step "o". v. Recheck gauge pressure. If gauge reading decreased, repeat Step "p." w. Once tank pressure is correct, remove from fill station. 2. Replace recharged tanks in bracket and follow ¿installation¿ procedures to put system back in service. 3. Inform proper personnel that the system is back in service. The contractor is responsible for the management and quality control actions necessary to meet the quality standards set forth by the Purchase Order (PO). The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure that all requirements of the PO are met. Extra Work and Deficient Conditions: The contractor shall notify Reclamation as soon as possible when it is apparent that extra work is required like rewinding armatures, field coils, etc. If deficient conditions are found, the contractor shall notify Tonya A. Pittsley. Deficient means out of limit conditions for inspections or tests that are specified herein or found in accepted national or industry standards. Deficient also means conditions that would not permit the exciter to be returned in an "as-new" condition.

More opportunities from Department Of The Interior → Denver Federal Center

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS